Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of 8A Fore Street Budleigh Salterton

Awaiting decision East Devon 25/1752/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of land and the siting of a portable cafe kiosk with an external seating area

As published by the council, reference 25/1752/FUL

Application record

Reference
25/1752/FUL
Type
Full Application
Status
Awaiting decision
Received
29 Aug 2025
Validated
29 Aug 2025
Ward
Budleigh And Raleigh
Parish
Budleigh Salterton

Timeline

Dates from the published record

  1. 29 Aug 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Exeter

30 applications on PlanIndex · across 10 councils · 87% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with East Devon for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Foreland 12A Fore Street Budleigh Salterton EX9 6NG

    26/1450/CPL Submitted 16 Jul 2026 59m away

    Lawful development certificate for the erection of a detached single-storey timber-clad outbuilding ancillary to the main dwelling

    Refused Lawful development 8 docs
    Small domestic
  • Foreland 12A Fore Street Budleigh Salterton EX9 6NG

    26/1617/CPL Submitted 13 Aug 2026 59m away

    79% historically approved · decision due ~8 Oct

    Lawful Development Certificate for the erection of a detached single-storey timber-clad outbuilding ancillary to the main dwelling

    Awaiting decision Lawful development 6 docs
    Small domestic
  • The Rolle 2 Fore Street Budleigh Salterton Devon EX9 6NG

    24/1190/TCA Submitted 10 Jun 2024 88m away

    T1: Field Maple: crown lift by removing approximately 5 low limbs, MDC 50mm; tip prune eastern aspect to achieve a 1.5m clearance from 4 Fore St. G2: 2 no. of declining conifers to remove.

    Granted Trees 8 docs
  • Abele Tree House 9 Fore Street Budleigh Salterton EX9 6NG

    25/1751/PRETDD Submitted 22 Aug 2025 103m away

    Five day notice: Removal of damaged limb on a while poplar

    Withdrawn Trees 6 docs
  • 5A Cliff Terrace Budleigh Salterton EX9 6JY

    26/0739/TCA Submitted 15 Apr 2026 104m away

    G1: x2 Sycamore - reduce height by approximately 2m from an existing height of approximately 10m to achieve a finished height of 8m. Maximum diameter of cuts 65mm. T1: Sycamore - crown reduction via thinning, reducing overall height from approximately 8m to achieve a finished height of 6m. Maximum diameter of pruning cuts 65mm. T2: Horse Chestnut - crown raise over the highway to provide 5m vertical clearance. Crown thin by approximately 20% to reduce sail effect and improve light penetration, removing secondary and tertiary growth as appropriate. Maximum diameter of cuts 65mm.

    Decided Trees 5 docs
  • Abele Tree House 9 Fore Street Budleigh Salterton Devon EX9 6NG

    25/1764/TRE Submitted 27 Aug 2025 107m away

    T1: White Poplar - crown raise over the highway and carpark by removing secondary and tertiary branches up to a height of 5.2m restricting cut size to 100mm; reduce lateral spread of the crown in a north eastern direction by up to 2m leaving an approximate crown spread of 8m.

    Granted Trees 5 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications