Planning application
Glen Water Wind Farm Approximately 2.5km North Of Edge New Cumnock And 3.5km East Of Cumnock, To The North Of The A76
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The construction and operation of a wind farm (known as Glen Water Wind Farm), comprising six wind turbines up to 200m in height to tip with associated and ancillary infrastructure
As published by the council, reference 26/0099/PP
Application record
- Reference
- 26/0099/PP
- Type
- Planning Permission
- Status
- Registered
- Received
- 5 Mar 2026
- Validated
- 16 Mar 2026
- Ward
- Cumnock And New Cumnock
- Parish
- New Cumnock
- Decision by
- Planning Committee
Timeline
Dates from the published record
-
5 Mar 2026
Received by East Ayrshire
-
16 Mar 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Ayrshire took a median of 64 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Houghton-Le-Spring
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file, registered in Houghton-Le-Spring
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
376 documents on file for this application
- Response (rspb scotland)
- Response (naturescot)
- Supports - paul mccormack
- Supports - andrew vernon
- Supports - john macaulay
- Supports - george jarvie-jones
- Supports - julie pryce
- Response (transport scotland)
- Supports - john lavelle
- Supports - jamie campbell
- Supports - densia gara
- Supports - colin rodgers
- Supports - colin rodgers
- Supports - elizabeth robertson
- Supports - robyn edwards
- Supports - caelan grant
- Response (accon)
- Supports (kevin mapes)
- Response (hes)
- Response (cllcc)
- Response (cllcc)
- Objects- linda howie
- Response (art)
- Response - (scottish forestry)
- Response - (ara)
- Objects-mrs heidi thomas
- Supports - john muir
- Supports - dean aitken
- Supports - greig templeton
- Supports - janey berry
- Supports - sean m
- Supports - david paterson
- Supports - chloe elizabeth findlay
- Supports - ian sloan
- Supports - geoff crolley
- Supports - richard longmuir
- Supports - david wilmer
- Supports - ross baird
- Supports - stephen mccarron
- Supports - chris mcevoy
- Supports- louise shaw
- Supports- mccloy
- Supports- mark mcintee
- Supports - finley aitken
- Supports - bobby wallace
- Supports - christopher mcmurdo
- Supports - kenny mullen
- Supports - marie chambers
- Supports - fraser brown
- Supports - patsy russell
- Supports - paula wallace
- Supports - steven ronnie
- Supports - suzanne aitken
- Supports- georgette fulton
- Response - (ara flooding)
- Response (nithsm)
- Supports- agnus brown
- Supports- brian johnstone
- Supports- chris lane
- Supports- david lamont
- Supports- e brown
- Supports- j stevenson
- Supports- graeme mackie
- Supports- irene stevenson
- Supports- james mcbryde
- Supports- janice loy
- Supports- robert mcculloch
- Supports- robert mctaggart
- Supports- irene nickel
- Response (sepa)
- Objects-mr neil wilks
- Supports - agnes mullin
- Supports - betty owens
- Supports - charles mcdowall
- Supports - david goldie
- Supports - david ward
- Supports - dorothy scott
- Supports - elizabeth shirkie
- Supports - garce nichol
- Supports - isobel milligan
- Supports - jacqueline leitch
- Supports - james gibson
- Supports - jane milly
- Supports - janette miller
- Supports - jason scott
- Supports - jennifer bell
- Supports - john marshall
- Supports - john mullen
- Supports - john shankland
- Supports - k miles
- Supports - kenney dover
- Supports - kirk mcmillan
- Supports - lisa haliey
- Supports - lorna jones
- Supports - lyndsay robson
- Supports - margaret hodge
- Supports - mary gordon
- Supports - mary murray
- Supports - matthew mccreadie
- Supports - nancy torbet
- Supports - paul bunten
- Supports - richard watt
- Supports - robert anderson
- Supports - samuel phillips
- Supports - sharon hampson
- Supports - sylvia reid
- Supports - t mcnaghan
- Supports - terri johnston
- Supports - wilma laidlaw
- Supports- ian wise
- Supports- merlyn homes
- Supports- rab cree
- Supports- matthew bryce
- Supports- wendy craig
- Response (wsas)
- Response (scottish water)
- Supports- colin dalgarno
- Objects- jane ross
- Objection - ( frank smith)
- Objects-mrs laura rinaldi
- Objects-mr alex sim
- Objects-mrs angela burnett
- Objects-ms suzanne mccallum
- Objects-mr robert rae
- Supports- leonie muir
- Objects-mrs tracy leggat
- Objects-ms mary daubney
- Objects-mrs helen ellis
- Objects-mr jim muir
- Objects-mrs susan coneley
- Objects-mr joseph walker
- Objects-miss sarah davidson
- Objects-mrs linda davidson
- Objects-mrs winifred lowe
- Supports - mhairi mcwilliam
- Supports - aileen mccreadie
- Supports - stephanie murray
- Supports - wilma cuthill
- Supports - mary dalziel
- Supports - antonio esquierdo
- Supports - robert auld
- Supports - finlay buchan
- Eiar chapter 10 - complete
- Vol 4 ta 5 1 ecology excluding bats 1
- Vol 4 ta 5 1 ecology excluding bats 2
- Supports- martyn paxton
- Response - (arqiva)
- Objects-mrs sally scott
- Supports - aurelia peddie
- Public notice chronical
- Response (auchinleck community council)
- Response (env health)
- Response (the coal authority)
- Nnplan 260099pp
- Nnlist 260099pp
- Eiar chapter 6
- Eiar - front cover-contents
- Eiar chapter 1
- Eiar chapter 10
- Eiar chapter 11
- Eiar chapter 12
- Eiar chapter 13
- Eiar chapter 2
- Eiar chapter 3
- Eiar chapter 4
- Eiar chapter 5
- Eiar chapter 7
- Eiar chapter 8
- Eiar chapter 9
- Eia report structure covering letter
- Response (nats)
- Response (nats)
- Vol 3a fig 4 25 cum ztv to 20km with op wind farms to the north
- Vol 3a fig 4 26 cum ztv to 20km consented wind farms north
- Vol 3a fig 4 27 cum ztv to 20km with in planning wf to the north
- Vol 3a fig 4 29 lethans lethans ext and glenmuckloch cum ztv to 20km
- Vol 3a fig 4 30 cum ztv to 20km with op wind farms to the south
- Vol 3a fig 4 31 cumu ztv to 20km with op wf to the south
- Vol 3a fig 4 32 cum ztv to 20km with in planning wf to the south
- Vol 3a figure 4 24 residential properties within 2km
- Vol 3a figure 4 28 drum cumulative ztv to 20km
- Vol 3b viewpoint 13 cronberry
- Vol 3b viewpoint 14 a76 over cairn
- Vol 3b viewpoint 15 cairn table
- Vol 3b vp 1 glenmuir water road west of dalblair
- Vol 3b vp 10 mansfield
- Vol 3b vp 11 connel park boig road
- Vol 3b vp 12 dalleagles
- Vol 3b vp 2 glenmuir water road darmalloch
- Vol 3b vp 3 loganhill road
- Vol 3b vp 4 junction a70 and glenmuir rd
- Vol 3b vp 5 cumnock kings way
- Vol 3b vp 6 craigens
- Vol 3b vp 7 auckinleck coal road
- Vol 3b vp 8 a76 new cumnock
- Vol 3b vp 9 new cumnock greenbraes drive
- Vol 4 figure 2 1 indicative turbine elevation
- Vol 4 figure 2 10 indicative batching plant
- Vol 4 figure 2 11 indicative substation layout
- Vol 4 figure 2 12 indicative control building and substation elevation
- Vol 4 figure 2 13 indicative met mast
- Vol 4 figure 2 14 indicative cable trench cross sections
- Vol 4 figure 2 15 indicative borrow pit layout
- Vol 4 figure 2 16 indicative temporary construction compound
- Vol 4 figure 2 17 outline habitat management plan
- Vol 4 figure 2 18 amenity and recreation masterplan
- Vol 4 figure 2 19 indicative grid connection corridor
- Vol 4 figure 2 2 typical turbine foundation
- Vol 4 figure 2 3 typical turbine piled foundation
- Vol 4 figure 2 4 typical crane hardstanding and laydown area
- Vol 4 figure 2 5 typical access track cross section
- Vol 4 figure 2 6 abnormal site junction layout
- Vol 4 figure 2 8 indicative drainage details sheet 1
- Vol 4 figure 2 8 indicative drainage details sheet 2
- Vol 4 figure 2 9 typical watercourse crossing
- Vol 4 figure 7 1 site plan showing heritage assets
- Vol 4 figure 7 2 figure 7 2 chvp locations and ztv
- Vol 4 figure 7 3 to 7 5 cultural heritage
- Vol 4 ta 1 1 scoping opinion
- Vol 4 ta 1 2 statement of competence
- Vol 4 ta 2 1 cumulative development list
- Vol 4 ta 2 2 outline construction method statement
- Vol 4 ta 2 3 outline construction environmental management plan
- Vol 4 ta 5 3 bats
- Vol 4 ta 5 4 outline habitat management plan and biodiversity net gain statement
- Vol 4 ta 6 3 avian collision risk analysis and cumulative assess
- Vol 4 ta 7 1 cultural heritage stage1 setting assess
- Vol 4 ta 7 2 glen water wf cult heritage gazetteer
- Vol 4 non eiar gwwf decommissioning report
- Vol 2 planning statement
- Vol 2 appendix 1 draft planning conditions
- Vol 2 appendix 2 draft section 75 heads of terms
- Vol 3b vp 1 glenmuir water road west of dalblair
- Vol 4 figure 9 1 construction noise assessment location
- Vol 4 ta 4 5 viewpoint assessment
- Vol 4 app 1 woodland compartment schedule
- Vol 4 figure 8 6 peat landslide hazard plan
- Vol 4 figure 1 tree crops within the site
- Vol 4 figure 10 1 study area
- Vol 4 figure 10 2 traffic count locations
- Vol 4 figure 10 3 personal injury accident locations
- Vol 4 figure 10 4 abnormal indivisible load delivery route
- Vol 4 figure 11 1 study area and shadow flicker assessment locations
- Vol 4 figure 11 2 cumulative wind farm locations
- Vol 4 figure 11 3 telecommunications
- Vol 4 figure 2 7 indicative drainage layout overall lores
- Vol 4 figure 2 7 indicative drainage layout sheet 2 lores
- Vol 4 figure 2 7 indicative drainage layout sheet 3 lores
- Vol 4 figure 2 7 indicative drainage layout sheet 4 lores
- Vol 4 figure 2 native woodland within the site
- Vol 4 figure 3 tree cover removed for infrastructure
- Vol 4 figure 8 1 geology solid
- Vol 4 figure 8 2 geology drift
- Vol 4 figure 8 3 peat probe plan boundary
- Vol 4 figure 8 3 peat probe plan main area
- Vol 4 figure 8 4 peat depth plan peat interpolation
- Vol 4 figure 8 5 hydrology
- Vol 4 figure 8 7 slope gradient plan
- Vol 4 figure 8 8a potential gwdte habitats
- Vol 4 figure 8 8b actual gwdte habitats plan
- Vol 4 figure 9 2 operational noise monitoring and assessment locations
- Vol 4 figure 9 3 cumulative wind turbine locations
- Vol 4 forestry assessment
- Vol 4 non eiar appendix 1 lighting report
- Vol 4 non eiar appendix 2 lighting cca letter wflfac
- Vol 4 non eiar technical reports aviation assessment
- Vol 4 ta 10 2 abnormal loads assessment from port of ayr
- Vol 4 ta 10 3 abnormal loads assessment from kgc docks glasgow
- Vol 4 ta 11 1 carbon balance calculator
- Vol 4 ta 11 2 shadow flicker assessment
- Vol 4 ta 4 1 lvia assessment criteria
- Vol 4 ta 4 2 visualisation information
- Vol 4 ta 4 3 preliminary landscape assessment
- Vol 4 ta 4 4 preliminary assessment of visual receptors
- Vol 4 ta 4 6 resi vis amenity assess
- Vol 4 ta 4 6 resi vis amenity wireline lores
- Vol 4 ta 4 7 aviation lighting impact assessment
- Vol 4 ta 4 8 townscape visual assessment
- Vol 4 ta 5 1 ecology excluding bats lores
- Vol 4 ta 6 1 ornithology lores
- Vol 4 ta 8 1 relative key legislation and best practice guidance
- Vol 4 ta 8 2 preliminary peat landslide hazard and risk assessment plhra
- Vol 4 ta 8 3 outline peat management plan
- Vol 4 ta 8 4 flood risk statement
- Vol 4 ta 8 5 hydrology walkover lores
- Vol 4 ta 8 6 gwdte assessment lores 1
- Vol 4 ta 8 6 gwdte assessment lores 2
- Vol 4 ta 8 7 app a site photos
- Vol 4 ta 8 7 app b1 datasheet
- Vol 4 ta 8 7 app b10 map 10k
- Vol 4 ta 8 7 app b11 map 10k
- Vol 4 ta 8 7 app b12 - map 10k
- Vol 4 ta 8 7 app b13 map 10k
- Vol 4 ta 8 7 app b14 map 10k
- Vol 4 ta 8 7 app b15 map 10k
- Vol 4 ta 8 7 app b16 map 10k
- Vol 4 ta 8 7 app b2 datasheet
- Vol 4 ta 8 7 app b3 datasheet
- Vol 4 ta 8 7 app b4 datasheet
- Vol 4 ta 8 7 app b5 datasheet
- Vol 4 ta 8 7 app b6 datasheet
- Vol 4 ta 8 7 app b7 datasheet
- Vol 4 ta 8 7 app b8 datasheet
- Vol 4 ta 8 7 app b9 map 10k
- Vol 4 ta 8 7 app c bgs logs
- Vol 4 ta 8 7 app d1 lugar
- Vol 4 ta 8 7 app d2 glaisnock
- Vol 4 ta 8 7 app d3 cumnock
- Vol 4 ta 8 7 app e1 eac foi
- Vol 4 ta 8 7 app e2 eac foi
- Vol 4 ta 8 7 app e3 eac pws
- Vol 4 ta 8 7 app e4 sepa foi
- Vol 4 ta 8 7 app e5 sepa foi
- Vol 4 ta 8 7 app e6 sepa foi
- Vol 4 ta 8 7 app e7 sepa foi
- Vol 4 ta 8 7 app f rps report lores
- Vol 4 ta 8 7 app g eac planning
- Vol 4 ta 8 7 desktop study assessment
- Vol 4 ta 9 1 construction noise assessment
- Vol 4 ta 9 2 operational noise assessment 1
- Vol 4 ta 9 2 operational noise assessment 2
- Vol 4 ta10 1 transport assessment
- Location plan 1:100,000
- Application form
- Vol 1 non technical summary
- Vol 1 pac public consultation round 1 adv ayrshire post
- Vol 1 pac public consultation round 1 adv kilmarnock standard and cumnock chroni
- Vol 2 pac public consultation adverts round 2
- Vol 2 maximising the socio-economic benefits of gwwf
- Vol 2 pa01 location plan
- Vol 2 pa02 applicaiton boundary
- Vol 2 pa03 site layout construction layout
- Vol 2 pa04 site layout operational layout
- Vol 2 pa05 micro siting plan
- Vol 2 pac east ayrshire council response to pan
- Vol 2 pac give my view executive summary of results
- Vol 2 pac glen water community council presentation nov 25
- Vol 2 pac public consul round 1 feedback form
- Vol 2 pac proposal of application notice pan
- Vol 2 pac public consul round 1 flyer 1
- Vol 2 pac public consul round 1 flyer 2
- Vol 2 pac public consult round 1 press release
- Vol 2 pac public consultation round 1 exhbition boards posters
- Vol 2 pac public consultation round 2 adverts kilmarnock 2
- Vol 2 pac public consultation round 2 feedback form
- Vol 2 pac public consultation round 2 flyer
- Vol 2 pac round 2 event consultation boards1
- Vol 2 pac round 2 event consultation viewpoints2
- Vol 2 pac update to councillors
- Vol 2 pre application consultation report
- Vol 3a fig 4 10 hub height ztv to 20km with vp
- Vol 3a fig 4 11 dark sky baseline satellite image
- Vol 3a fig 4 15 landscape designations to 20km with blade tip ztv and vp
- Vol 3a fig 4 16 landscape character types within 35km with vp
- Vol 3a fig 4 17 landscape chartypes w 20km with blade tip ztv and vp
- Vol 3a fig 4 2 site loc and detailed lvia study area 20km
- Vol 3a fig 4 20 pvr to 35km with blade tip ztv and vp
- Vol 3a fig 4 21 pvr to 20km with blade tip ztv and viewpoints
- Vol 3a fig 4 4 blade tip ztv to 35km with viewpoints a1
- Vol 3a fig 4 5 blade tip ztv to 20km with viewpoints a3
- Vol 3a fig 4 6 blade tip ztv to 20km with viewpoints a1
- Vol 3a fig 4 7 hub height ztv to 35km with viewpoints a3
- Vol 3a fig 4 8 hub height ztv to 35km with viewpoints
- Vol 3a fig 4 8 hub height ztv to 35km with viewpoints a1
- Vol 3a fig 4 9 hub height ztv to 20km with viewpoints a3
- Vol 3a fig4 3 blade tip ztv to 35km with viewpoints a3
- Vol 3a figure 4 1 site location and initial lvia study area 35km
- Vol 3a figure 4 12lit turbine ztv to 20km with viewpoints
- Vol 3a figure 4 13turbine lighting intensity ztv to 20km with viewpoints
- Vol 3a figure 4 14 landscape designations within 35km with vp
- Vol 3a figure 4 18 topography plan to 20km
- Vol 3a figure 4 19 local landscape context to 5km
- Vol 3a figure 4 22 other wind farms within 35km
- Vol 3a figure 4 23other wind farms within 20km
- Vol2 design and access statement
- Volume 2 main reports environmental impact assessment report
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Ayrshire for determination, against a statutory target of eight weeks. Over the last year East Ayrshire decided full applications in a median of 75 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In East Ayrshire
-
26/0281/PP Granted
14 Lugar Street Cumnock East Ayrshire KA18 1AB
Construction of Office (Class 4) for temporary use (10 years) and removal of trees
-
26/0313/PP Granted
2C Irvine Road Kilmaurs East Ayrshire KA3 2RH
Installation of two sets of patio doors and raised deck on rear elevation
-
26/0235/PP Granted
A70 South Of Braehead Bellow Mill Muirkirk Road Lugar Cumnock KA18 3LN
Application made under Section 42 of the Town and Country Planning (Scotland) Act 1997 relating to the approved load bearing surface at A70 Muirkirk Road, south of Braehead to facilitate access to the consented Hare Craig wind farm, Muirkirk (ref: 23/0314/PP) to vary condition 1 (an extension to the time to commence development)
-
26/0266/PP Granted
Site Of Derelict MUGA A71 Galston Roundabout To U33 Woodhead Galston East Ayrshire KA4 8PD
Erect two padel courts with adjustable floodlights on site of former MUGA
-
26/0335/PP Granted
Land Adjacent Aaron View, Crosshands, Mauchline, KA5 5TP
Proposed Dwelling and Garage