Breezy Hill Wind Farm Within North Kyle Forest Estate Cumnock

Awaiting decision East Ayrshire 25/0004/S36 Section 36

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Consultation under Section 36 of the Electricity Act 1989 relating to the proposed Breezy Hill Wind Farm (comprising 20 wind turbines of up to 149.9m to blade tip height) including BESS and associated infrastructure.

As published by the council, reference 25/0004/S36

Application record

Reference
25/0004/S36
Type
Section 36
Status
Registered
Received
28 May 2025
Validated
28 May 2025
Ward
Cumnock And New Cumnock
Decision by
Delegated

Timeline

Dates from the published record

  1. 28 May 2025

    Received by East Ayrshire

  2. 7 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 23 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Ayrshire took a median of 66 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

SLR Consulting Limited Agent, registered in London

Active · incorporated 1999 · London

253 applications on PlanIndex · across 70 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Breezy Hill Energy Ltd Applicant, registered in Edinburgh

Active · incorporated 2022 · Edinburgh

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

432 documents on file for this application

  • Response (accon) Consultations (Public) · 25 Aug 2026
  • Response (env health) Consultations (Public) · 21 Aug 2026
  • Breezy hill energy project sei cover letter Reports (Public) · 16 Jul 2026
  • Breezy hill figure 1 grid route connection Drawing · 16 Jul 2026
  • Breezy hill figure 2a grid connection overhead section zone of theoretical visib Drawing · 16 Jul 2026
  • Breezy hill figure 2b grid connection comparative zone of theoretical visibility Drawing · 16 Jul 2026
  • Breezy hill figure 3 ecology constraints Drawing · 16 Jul 2026
  • Breezy hill figure 3_7 protected species Drawing · 16 Jul 2026
  • Breezy hill figure 4 ornithology constraints Drawing · 16 Jul 2026
  • Breezy hill figure 5 cultural heritage constraints Drawing · 16 Jul 2026
  • Breezy hill figure 6 hydrology constraints Drawing · 16 Jul 2026
  • Breezy hill figure 7 geotechnical constraints Drawing · 16 Jul 2026
  • Breezy hill figures 3_1 to 3_6 phase 1 national vegetation classification plan Drawing · 16 Jul 2026
  • Breezy hill planning statement addendum Reports (Public) · 16 Jul 2026
  • Breezy hill supplementary environmental information grid connection report and a Reports (Public) · 16 Jul 2026
  • Application pdf Application Form · 16 Jul 2026
  • Additional information - volume 1 - chapter 01 - introduction Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 02 - proposed development Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 03 - design evolution and alternativ Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 04 - approach to eia Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 05 - landscape and visual assessment Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 06 - ecology Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 07 ornithology Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 08 - geology hydrology geohydrology Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 09 - forestry Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 10 - archaeology and cultural herita Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 11 - traffic and transport Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 12 - noise Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 13 aviation Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 14 other issues Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - chapter 15 - schedule of environmental commi Reports (Public) · 17 Mar 2026
  • Additional information - volume 1 - cover page Other · 17 Mar 2026
  • Additional information - volume 1 - preface Other · 17 Mar 2026
  • Additional information - volume 1 - table of contents Other · 17 Mar 2026
  • Additional information - volume 1 - table of contents2 - abbreviations Other · 17 Mar 2026
  • Additional information - volume 1 - table of contents3 - glossary Other · 17 Mar 2026
  • Additional information -volume 2a - figure 1_1 - site location Drawing · 17 Mar 2026
  • Additional information -volume 2a - figure 1_2a-b - site layout Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_1 - typical turbine elevation Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_10 - indicative construction compo Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_11 - indicative construction compo Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_12 - indicative bess compound Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_13 - indicative substation compoun Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_14 - indicative spen compound Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_2 - typical turbine kiosk Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_3 - typical turbine foundation Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_4 - typical turbine hardstanding Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_5 - typical cable trench Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_6 - typical existing road widening Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_7 - typical track Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_8 - typical water crossing methods Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 2_9 - indicative construction compou Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 3_1 - environmental designations Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 3_2 - design evolution Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 3_3 - section 36 application Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_1 - ecological designated sites an Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_10 - bat activity 2021 - common pi Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_11 - bat site activity 2021 - sopr Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_12 - bat site activity 2021 - nyct Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_13 - bat site activity 2025 - comm Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_14 - bat site activity 2025 - sopr Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_15 - bat site activity - nathusius Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_16 - bat site activity 2025 - nyct Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_17 - electrofishing locations and Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_18 - outline biodiversity enhancem Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_2 - carbon and peatland map 2016 w Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_3_1-11 - national vegetation class Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_4_1-11 - potential gwdte Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_5 - protected species survey area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_6 - bat survey area anabat locatio Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_7 - bat site activity 2020 - commo Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_8 - bat site activity 2020 - sopra Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 6_9 - bat site activity 2020 - nycta Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_1 - site and study areas Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_10 - flight activity hen harrier h Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_11 - flight activity curlew and go Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_12 - wader activity Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_13 - flight activity herring gull Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_2 - ornithological sites within 20 Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_3 - vantage points and viewsheds Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_4 - scarce breeding bird study are Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_5 - black grouse study area and su Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_6 - winter walkover study areas an Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_7 - black grouse lek locations and Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_8 - raptor activity 2020 2021 and Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 7_9 - flight activity goshawk Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_1 - site location and initial land Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_10 - landscape character types wit Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_11 - topography plan to 20 km Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_12 - local landscape context to 5 Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_13 - principal visual receptors to Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_14 - principal visual receptors to Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_15 - blade tip zone of theoretical Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_16 - blade tip zone of theoretical Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_17 - blade tip zone of theoretical Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_18 - blade tip zone of theoretical Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_19 - hub height zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_2 - site location and detailed lan Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_20 - hub height zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_21 - hub height zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_22 - hub height zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_23 - other wind farms within 35 km Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_24 - other wind farms within 20 km Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_25 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_26 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_27 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_3 - blade tip zone of theoretical Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_4 - blade tip ztv to 20 km with vi Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_5 - hub height ztv to 35 km with v Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_6 - hub height ztv to 20 km with v Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_7 - landscape designations within Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_8 - landscape designations to 20 k Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_9 - landscape character types with Drawing · 17 Mar 2026
  • Additional information - volume 2b landscape and visual figures cover page Other · 17 Mar 2026
  • Additional information - volume 2b landscape and visual figures table of content Other · 17 Mar 2026
  • Additional information -volume 2a - figure 10_1 - historic environment records Drawing · 17 Mar 2026
  • Additional information -volume 2a - figure 10_2 - designated heritage assets Drawing · 17 Mar 2026
  • Additional information -volume 2a - figure 10_3 - cultural heritage viewpoints Drawing · 17 Mar 2026
  • Additional information -volume 2a - figure 11_1 - study area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 11_2 - traffic count locations Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 11_3 - personal injury accident loca Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 11_4 - abnormal indivisible load rou Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 12_1 - predicted noise levels at 10m Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 12_2 - predicted noise levels at 10m Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 13_1 - aviation study area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 13_2 - proposed development location Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 14_1 shadow flicker study area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 14_2 - shadow flicker realistic resu Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 14_3 - cumulative study area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 14_4 telecoms constraints Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_1 - site location and study area Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_10a-d - potential gwdte Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_11 - peat slide likelihood Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_2a-d - hydrological features Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_3 - superficial geology Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_4 - peatland classification Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_5 - peat depth plan Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_6 - bedrock geology Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_7 - regional hydrogeology Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_8 - watercourse crossing locations Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 8_9a-b - pws risk assessment Drawing · 17 Mar 2026
  • Additional information - volume 2a - figure 9_1-5 - baseline forest details Drawing · 17 Mar 2026
  • Additional information - volume 2a - figures - cover page Other · 17 Mar 2026
  • Additional information - volume 2a figures table of contents Other · 17 Mar 2026
  • Additional information - volume 2c - figure 10_5 - ch viewpoint 2 gdl00111 craig Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 10_6 - ch viewpoint 3 lb96 the templ Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_28 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_29 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_30 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_31 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_32 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_33 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_34 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_35 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_36 - cumulative zone of theoretica Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_37 - cumulative ztv with in planni Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_38 - cumulative ztv with in planni Drawing · 17 Mar 2026
  • Additional information - volume 2b - figure 5_39 - cumulative ztv with in planni Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 10_7 - ch viewpoint 4 centred on lb1 Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 10_4 - ch viewpoint 1 sm5393 auchenc Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_40 - viewpoint 1 rankinston little Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_41 - viewpoint 2 b705 outskirts of Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_42 - viewpoint 3 a70 approach to l Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_43 - viewpoint 4 b7036 dumfries ho Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_44 - viewpoint 5 a70 between drong Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_45 - viewpoint 6 ayr road dalmelli Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_46 - viewpoint 7 b7083 at holmhead Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_47 - viewpoint 8 drongan mill of s Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_48 - viewpoint 9 avisyard hill Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_49 - viewpoint 10 b7046 skares roa Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_50 - viewpoint 11 connel view new Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_51 - viewpoint 12 auchenroy hill Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_52 - viewpoint 13 sinclairston Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_53 - viewpoint 14 b741 at dalleagl Drawing · 17 Mar 2026
  • Additional information - volume 2c - figure 5_54 - viewpoint 15 craigs road Drawing · 17 Mar 2026
  • Additional information - volume 2c visualisations - cover page Other · 17 Mar 2026
  • Additional information - volume 2c visualisations - table of contents Other · 17 Mar 2026
  • Additional information - volume 3 - technical appendix 5_6 - figure 5_6_1 - resi Drawing · 17 Mar 2026
  • Additional information - volume 3 - technical appendix 5_6 - figure 5_6_2 - rvaa Drawing · 17 Mar 2026
  • Additional information - volume 3 - technical appendix 5_6 - figures 5_6_3-8 Drawing · 17 Mar 2026
  • Additional information - volume 3 technical appendices - table of contents Other · 17 Mar 2026
  • Additional information - volume 3 technical appendices cover page Other · 17 Mar 2026
  • Additional information - volume 4 non technical summary cover page Other · 17 Mar 2026
  • Consultation response (ara) Consultations (Public) · 09 Mar 2026
  • Email ecu - additional information Application Correspondence (Public) · 10 Dec 2025
  • Site layout Drawing · 09 Dec 2025
  • Other wind farms within 20km Drawing · 09 Dec 2025
  • Viewpoint 15 craigs road Drawing · 09 Dec 2025
  • Viewpoint 13 sinclairston Drawing · 09 Dec 2025
  • Viewpoint 8 drongan mill of shield road Drawing · 09 Dec 2025
  • Viewpoint 4 dumfries house estate access Drawing · 09 Dec 2025
  • Viewpoint 1 rankinston littlemill pace Drawing · 09 Dec 2025
  • Response (roads flooding) Consultations (Public) · 25 Jun 2025
  • Response (env health) Consultations (Public) · 18 Jun 2025
  • Response (arqiva) Consultations (Public) · 13 Jun 2025
  • Pre_application_consultation_report_of_breezy_hill_energy_project Reports (Public) · 29 May 2025
  • Socio_economic_impact_assessment_of_breezy_hill_energy_project Reports (Public) · 29 May 2025
  • Volume_1_chapter_01_introduction Reports (Public) · 29 May 2025
  • Volume_1_chapter_02_proposed_development Reports (Public) · 29 May 2025
  • Volume_1_chapter_03_design_evolution_and_alternatives Reports (Public) · 29 May 2025
  • Volume_1_chapter_04_approach_to_eia Reports (Public) · 29 May 2025
  • Volume_1_chapter_05_landscape_and_visual_impact_assessment Reports (Public) · 29 May 2025
  • Volume_1_chapter_06_ecology Reports (Public) · 29 May 2025
  • Volume_1_chapter_07_ornithology Reports (Public) · 29 May 2025
  • Volume_1_chapter_08_geology_hydrology_hydrogeology_and_peat Reports (Public) · 29 May 2025
  • Volume_1_chapter_09_forestry Reports (Public) · 29 May 2025
  • Volume_1_chapter_10_cultural_heritage Reports (Public) · 29 May 2025
  • Volume_1_chapter_11_access_traffic_and_transport Reports (Public) · 29 May 2025
  • Volume_1_chapter_12_noise Reports (Public) · 29 May 2025
  • Volume_1_chapter_13_aviation Reports (Public) · 29 May 2025
  • Volume_1_chapter_14_other_issues Reports (Public) · 29 May 2025
  • Volume_1_chapter_15_schedule_of_mitigation Reports (Public) · 29 May 2025
  • Volume_1_cover_page Reports (Public) · 29 May 2025
  • Volume_1_table_of_contents Reports (Public) · 29 May 2025
  • Volume_1_toc_abbreviations Reports (Public) · 29 May 2025
  • Volume_1_toc3_glossary Reports (Public) · 29 May 2025
  • Volume_2a_cover_page Reports (Public) · 29 May 2025
  • Volume_2a_figure_1_1_site_location Drawing · 29 May 2025
  • Volume_2a_figure_1_2_proposed_layout Drawing · 29 May 2025
  • Volume_2a_figure_2_1_typical_turbine_elevation Drawing · 29 May 2025
  • Volume_2a_figure_2_10_indicative_construction_compound_2 Drawing · 29 May 2025
  • Volume_2a_figure_2_11_indicative_construction_compound_3 Drawing · 29 May 2025
  • Volume_2a_figure_2_12_indicative_bess_compound Drawing · 29 May 2025
  • Volume_2a_figure_2_13_indicitive_substation_compound Drawing · 29 May 2025
  • Volume_2a_figure_2_14_indicative_spen_compound Drawing · 29 May 2025
  • Volume_2a_figure_2_2_typical_turbine_kiosk Drawing · 29 May 2025
  • Volume_2a_figure_2_3_typical_turbine_foundation Drawing · 29 May 2025
  • Volume_2a_figure_2_4_typical_turbine_hardstanding Drawing · 29 May 2025
  • Volume_2a_figure_2_5_typical_cable_trench Drawing · 29 May 2025
  • Volume_2a_figure_2_6_typical_exisiting_road_widening Drawing · 29 May 2025
  • Volume_2a_figure_2_7_typical_track Drawing · 29 May 2025
  • Volume_2a_figure_2_8_typical_water_crossing_methods Drawing · 29 May 2025
  • Volume_2a_figure_2_9_indicative_construction_compound_1 Drawing · 29 May 2025
  • Volume_2a_figure_3_1_environmental_designations Drawing · 29 May 2025
  • Volume_2a_figure_3_2_layout_b_scoping Drawing · 29 May 2025
  • Volume_2a_figure_3_3_layout_c_additional_land Drawing · 29 May 2025
  • Volume_2a_figure_3_4_layout_d_design_chill Drawing · 29 May 2025
  • Volume_2a_figure_6_1_designatedsites Drawing · 29 May 2025
  • Volume_2a_figure_6_10_commonpip_2021 Drawing · 29 May 2025
  • Volume_2a_figure_6_11_sopranopip_2021 Drawing · 29 May 2025
  • Volume_2a_figure_6_12_nyctalus_2021 Drawing · 29 May 2025
  • Volume_2a_figure_6_13_electrofishing Drawing · 29 May 2025
  • Volume_2a_figure_6_14_proposed_habitat_management_units Drawing · 29 May 2025
  • Volume_2a_figure_6_2_carbonpeatland Drawing · 29 May 2025
  • Volume_2a_figure_6_3_nvc_overview Drawing · 29 May 2025
  • Volume_2a_figure_6_3_nvc_tiles_compressed Drawing · 29 May 2025
  • Volume_2a_figure_6_4_gwdte_overview Drawing · 29 May 2025
  • Volume_2a_figure_6_4_gwdte_tiles_compressed Drawing · 29 May 2025
  • Volume_2a_figure_6_5_ps_overview Drawing · 29 May 2025
  • Volume_2a_figure_6_5_ps_tiles Drawing · 29 May 2025
  • Volume_2a_figure_6_6_anabats Drawing · 29 May 2025
  • Volume_2a_figure_6_7_commonpip_2020 Drawing · 29 May 2025
  • Volume_2a_figure_6_8_sopranopip_2020 Drawing · 29 May 2025
  • Volume_2a_figure_6_9_nyctalus_2020 Drawing · 29 May 2025
  • Volume_2a_figure_7_1_surveyareas Drawing · 29 May 2025
  • Volume_2a_figure_7_10_hh_hy_ml_op_pe Drawing · 29 May 2025
  • Volume_2a_figure_7_11_cu_gp Drawing · 29 May 2025
  • Volume_2a_figure_7_12_waderactivity Drawing · 29 May 2025
  • Volume_2a_figure_7_13_hg_ws Drawing · 29 May 2025
  • Volume_2a_figure_7_2_designatedsites Drawing · 29 May 2025
  • Volume_2a_figure_7_3_viewsheds Drawing · 29 May 2025
  • Volume_2a_figure_7_4_sbbs Drawing · 29 May 2025
  • Volume_2a_figure_7_5_bk Drawing · 29 May 2025
  • Volume_2a_figure_7_6_winterwalkover Drawing · 29 May 2025
  • Volume_2a_figure_7_7_blackgrouse Drawing · 29 May 2025
  • Volume_2a_figure_7_8_raptoractivity Drawing · 29 May 2025
  • Volume_2a_figure_7_9_fa_goshawk Drawing · 29 May 2025
  • Volume_2a_figure_8_1_site_layout Drawing · 29 May 2025
  • Volume_2a_figure_8_10a_d_gwdte Drawing · 29 May 2025
  • Volume_2a_figure_8_2a_d_hydrological_features Drawing · 29 May 2025
  • Volume_2a_figure_8_3_superficial_geology Drawing · 29 May 2025
  • Volume_2a_figure_8_4_peatland_classification Drawing · 29 May 2025
  • Volume_2a_figure_8_5_peat_depth_plan Drawing · 29 May 2025
  • Volume_2a_figure_8_6_bedrock_geology Drawing · 29 May 2025
  • Volume_2a_figure_8_7_regional_hydrogeology Drawing · 29 May 2025
  • Volume_2a_figure_8_8_watercrossing_location Drawing · 29 May 2025
  • Volume_2a_figure_8_9a_b_pwsra Drawing · 29 May 2025
  • Volume_2a_figure_10_1_cultural_heritage_sites Drawing · 29 May 2025
  • Volume_2a_figure_10_2_cultural_heritage_designated_sites Drawing · 29 May 2025
  • Volume_2a_figure_11_1_studyarea_compressed Drawing · 29 May 2025
  • Volume_2a_figure_11_2_traffic_count_locations Drawing · 29 May 2025
  • Volume_2a_figure_11_3_personal_injury_accident_locations Drawing · 29 May 2025
  • Volume_2a_figure_11_4_abnormal_indivisible_load_route_compressed Drawing · 29 May 2025
  • Volume_2a_figure_12_1_noise_sensitive_receptors_and_baseline_measurement_locatio Drawing · 29 May 2025
  • Volume_2a_figure_12_2_predicted_noise_levels_at_10_m_s_proposed_development_only Drawing · 29 May 2025
  • Volume_2a_figure_12_3_predicted_noise_levels_at_10_m_s_cumulative Drawing · 29 May 2025
  • Volume_2a_figure_13_1_aviationstudyarea Drawing · 29 May 2025
  • Volume_2a_figure_13_2_propdevlocation Drawing · 29 May 2025
  • Volume_2a_figure_14_1_shadow_flicker_study_area Drawing · 29 May 2025
  • Volume_2a_figure_14_2_shadow_flicker_results_realistic_scenario Drawing · 29 May 2025
  • Volume_2a_figure_14_3_cumulative_study_area Drawing · 29 May 2025
  • Volume_2a_figure_14_4_telecommunications_constraints Drawing · 29 May 2025
  • Volume_2a_figure_9_1_forestry_study_area Drawing · 29 May 2025
  • Volume_2a_figure_9_2_baseline_forest_details Drawing · 29 May 2025
  • Volume_2a_figure_9_3_wind_farm_felling Drawing · 29 May 2025
  • Volume_2a_figure_9_4_designated_areas Drawing · 29 May 2025
  • Volume_2a_figure_9_5_future_baseline Drawing · 29 May 2025
  • Volume_2a_table_of_contents Reports (Public) · 29 May 2025
  • Volume_2b_cover_page Reports (Public) · 29 May 2025
  • Volume_2b_figure_5_1_site_location_and_initial_lvia_study_area_35km Drawing · 29 May 2025
  • Volume_2b_figure_5_10_landscape_character_types_within_20_km_with_blade_tip_ztv_ Drawing · 29 May 2025
  • Volume_2b_figure_5_11_topography_plan_to_20_km Drawing · 29 May 2025
  • Volume_2b_figure_5_12_local_landscape_context_to_5_km Drawing · 29 May 2025
  • Volume_2b_figure_5_13_principal_visual_receptors_to_35_km Drawing · 29 May 2025
  • Volume_2b_figure_5_14_principal_visual_receptors_to_20_km_blade_tip_ztv_and_view Drawing · 29 May 2025
  • Volume_2b_figure_5_15_blade_tip_ztv_to_35_km_nw_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_16_blade_tip_ztv_to_35_km_sw_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_17_blade_tip_ztv_to_35_km_ne_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_2_site_location_and_detailed_lvia_study_area_20_km Drawing · 29 May 2025
  • Volume_2b_figure_5_3_blade_tip_ztv_to_35km_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_4_blade_tip_ztv_to_20_km_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_5_hub_height_ztv_to_35_km_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_6_hub_height_ztv_to_20_km_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_7_landscape_designations_within_35_km Drawing · 29 May 2025
  • Volume_2b_figure_5_8_landscape_designations_to_20_km_with_blade_tip_ztv_and_view Drawing · 29 May 2025
  • Volume_2b_figure_5_9_landscape_character_types_within_35_km Drawing · 29 May 2025
  • Advert_breezy_hill_energy_project Other · 29 May 2025
  • Volume_2b_figure_5_18_blade_tip_ztv_to_35_km_se_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_19_hub_height_ztv_to_35_km_nw_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_20_hub_height_ztv_to_35_km_sw_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_21_hub_height_ztv_to_35_km_ne_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_22_hub_height_ztv_to_35_km_se_quadrant_with_viewpoints Drawing · 29 May 2025
  • Volume_2b_figure_5_23_other_wind_farms_within_35_km Drawing · 29 May 2025
  • Volume_2b_figure_5_24_other_wind_farms_within_20_km Drawing · 29 May 2025
  • Volume_2b_figure_5_25_cumulative_ztv_with_operational_under_construction_north_k Drawing · 29 May 2025
  • Volume_2b_figure_5_26_cumulative_ztv_with_operational_dersalloch Drawing · 29 May 2025
  • Volume_2b_figure_5_27_cumulative_ztv_with_operational_schemes_to_south_east Drawing · 29 May 2025
  • Volume_2b_figure_5_28_cumulative_ztv_with_consented_overhill_and_knockshinnoch Drawing · 29 May 2025
  • Volume_2b_figure_5_29_cumulative_ztv_with_consented_ailsa_wind_turbine Drawing · 29 May 2025
  • Volume_2b_figure_5_30_cumulative_ztv_with_consented_lethans_and_lethans_ext Drawing · 29 May 2025
  • Volume_2b_figure_5_31_cumulative_ztv_with_consented_schemes_to_south_east Drawing · 29 May 2025
  • Volume_2b_figure_5_32_cumulative_ztv_with_in_planning_knockkippen_and_schlenteuc Drawing · 29 May 2025
  • Volume_2b_figure_5_33_cumulative_ztv_with_in_planning_the_drum Drawing · 29 May 2025
  • Volume_2b_figure_5_34_cumulative_ztv_with_in_planning_craiginmoddie Drawing · 29 May 2025
  • Volume_2b_figure_5_35_cumulative_ztv_with_in_planning_schemes_to_south_east Drawing · 29 May 2025
  • Volume_2b_figure_5_51_cumulative_ztv_with_in_planning_greenburn Drawing · 29 May 2025
  • Volume_2b_table_of_contents Reports (Public) · 29 May 2025
  • Volume_2c_cover_page Reports (Public) · 29 May 2025
  • Volume_2c_figure_5_36_viewpoint_1_rankinston_littlemill_place Drawing · 29 May 2025
  • Volume_2c_figure_5_37_viewpoint_2_b705_outskirts_of_mauchline Drawing · 29 May 2025
  • Volume_2c_figure_5_38_viewpoint_3_a70_approach_to_lugar Drawing · 29 May 2025
  • Volume_2c_figure_5_39_viewpoint_4_b7036_dumfries_house_estate_access Drawing · 29 May 2025
  • Volume_2c_figure_5_40_viewpoint_5_a70_between_drongan_and_ochiltree Drawing · 29 May 2025
  • Volume_2c_figure_5_41_viewpoint_6_ayr_road_dalmellington Drawing · 29 May 2025
  • Volume_2c_figure_5_42_viewpoint_7_b7083_at_holmhead Drawing · 29 May 2025
  • Volume_2c_figure_5_43_viewpoint_8_drongan_mill_of_shield_road Drawing · 29 May 2025
  • Volume_2c_figure_5_44_viewpoint_9_avisyard_hill Drawing · 29 May 2025
  • Volume_2c_figure_5_45_viewpoint_10_b7046_skares_road Drawing · 29 May 2025
  • Volume_2c_figure_5_46_viewpoint_11_connel_view_new_cumnock Drawing · 29 May 2025
  • Volume_2c_figure_5_47_viewpoint_12_auchenroy_hill Drawing · 29 May 2025
  • Volume_2c_figure_5_48_viewpoint_13_sinclairston Drawing · 29 May 2025
  • Volume_2c_figure_5_49_viewpoint_14_b741_at_dalleagles Drawing · 29 May 2025
  • Volume_2c_figure_5_50_viewpoint_15_craigs_road Drawing · 29 May 2025
  • Volume_2c_table_of_contents Drawing · 29 May 2025
  • Volume_4_non-technical_summary Reports (Public) · 29 May 2025
  • Volume_4_nts_figure_1_1_site_location Drawing · 29 May 2025
  • Volume_4_nts_figure_1_2_proposed_layout Drawing · 29 May 2025
  • Volume_4_nts_figure_9_1_forestry_study_area Drawing · 29 May 2025
  • Volume_4_nts_figure_9_3_wind_farm_felling Drawing · 29 May 2025
  • Volume_3_cover_page Reports (Public) · 29 May 2025
  • Volume_3_ta_10_1_cultural_heritage_gazetteer Reports (Public) · 29 May 2025
  • Volume_3_ta_11_1_annex_a_rsr_v136 Reports (Public) · 29 May 2025
  • Volume_3_ta_11_1_transport_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_12_1_baseline_measurement_report Reports (Public) · 29 May 2025
  • Volume_3_ta_12_2_noise_prediction_methodology Reports (Public) · 29 May 2025
  • Volume_3_ta_12_3_topographical_corrections Reports (Public) · 29 May 2025
  • Volume_3_ta_12_4_cumulative_site_details Reports (Public) · 29 May 2025
  • Volume_3_ta_13_1_los_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_13_2_safeguarding_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_2_1_carbon_balance_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_4_1_ecu_scoping_opinion Reports (Public) · 29 May 2025
  • Volume_3_ta_5_1_assessment_criteria Reports (Public) · 29 May 2025
  • Volume_3_ta_5_2_visualisation_information Reports (Public) · 29 May 2025
  • Volume_3_ta_5_3_preliminary_assessment_of_designated_sites_and_lcts Reports (Public) · 29 May 2025
  • Volume_3_ta_5_4_preliminary_assessment_of_visual_receptors Reports (Public) · 29 May 2025
  • Volume_3_ta_5_5_viewpoint_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_5_6_figure_5_6_1_residential_properties_within_2_km_compressed Drawing · 29 May 2025
  • Volume_3_ta_5_6_figure_5_6_2_rvaa_angle_of_views_compressed Drawing · 29 May 2025
  • Volume_3_ta_5_6_figures 5_6_3_8 Drawing · 29 May 2025
  • Volume_3_ta_5_6_rvaa Reports (Public) · 29 May 2025
  • Volume_3_ta_6_1_nvc_and_habitat_survey_report Reports (Public) · 29 May 2025
  • Volume_3_ta_6_2_protected_species _survey_report Reports (Public) · 29 May 2025
  • Volume_3_ta_6_3_annex_e_ecobat_nightly_report_2020_nkyx Reports (Public) · 29 May 2025
  • Volume_3_ta_6_3_annex_e_ecobat_nightly_report_2021_nkyx Reports (Public) · 29 May 2025
  • Volume_3_ta_6_3_bat_survey_report Reports (Public) · 29 May 2025
  • Volume_3_ta_6_4_fisheries_report Reports (Public) · 29 May 2025
  • Volume_3_ta_6_5_species_protection_plan Reports (Public) · 29 May 2025
  • Volume_3_ta_6_6_outline_biodiversity_enhancement_management_plan Reports (Public) · 29 May 2025
  • Volume_3_ta_6_7_assessment_methodology Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1 Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1_annex_a Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1_annex_b Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1_annex_c Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1_annex_d Reports (Public) · 29 May 2025
  • Volume_3_ta_7_1_annex_e Reports (Public) · 29 May 2025
  • Volume_3_ta_8_2_outline_peat_management_plan Reports (Public) · 29 May 2025
  • Volume_3_ta_8_3_peat_landslide_hazard_risk_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_8_3_peat_landslide_hazard_risk_assessment_annexb Reports (Public) · 29 May 2025
  • Volume_3_ta_8_4_borrow_pit_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_8_4_breezy hill_borrow_pit_drawings Drawing · 29 May 2025
  • Volume_3_ta_8_6_figure_8_6_4_bedrock_geology Drawing · 29 May 2025
  • Volume_3_ta_8_6_figure_8_6_5_1_2_pwsra Drawing · 29 May 2025
  • Volume_3_ta_8_6_private_water_supply_risk_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_8_7_ground_water_dependent_terrestial_ecosystems_risk_assessment Reports (Public) · 29 May 2025
  • Volume_3_ta_8_8_mineral_stability_risk_assessment_compressed Reports (Public) · 29 May 2025
  • Volume_3_ta8_1_peat_probing_and_coring_survey_report Reports (Public) · 29 May 2025
  • Volume_3_ta8_2_figure_8_2_1_site_location Drawing · 29 May 2025
  • Volume_3_ta8_2_figure_8_2_2_proposed_infrastructure Drawing · 29 May 2025
  • Volume_3_ta8_2_figure_8_2_3_peat_depth Drawing · 29 May 2025
  • Volume_3_ta8_2_figure_8_2_4_peat_depth_over_0_5m Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_1_site_location Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_2_proposed_infrastructure Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_3_superficial_geology Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_4_bedrock_geology Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_5_slope Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_6_geomorph_features Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_7_peat_depth Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_8_peat_depth_over_0_5m Drawing · 29 May 2025
  • Volume_3_ta8_3_figure_8_3_9_likelihood Drawing · 29 May 2025
  • Volume_3_ta8_4_figure_8_4_1_site_location Drawing · 29 May 2025
  • Volume_3_ta8_4_figure_8_4_2_proposed_infrastructure Drawing · 29 May 2025
  • Volume_3_ta8_4_figure_8_4_3_superficial_geology Drawing · 29 May 2025
  • Volume_3_ta8_4_figure_8_4_4_bedrock_geology Drawing · 29 May 2025
  • Volume_3_ta8_4_figure_8_4_5_borrow_pit_layout Drawing · 29 May 2025
  • Volume_3_ta8_5_figure_8_5_1_watercourse_crossing Drawing · 29 May 2025
  • Volume_3_ta8_5_watercoursecrossingsschedule Reports (Public) · 29 May 2025
  • Volume_3_ta8_6_figure_8_6_1_pwsc Drawing · 29 May 2025
  • Volume_3_ta8_6_figure_8_6_2_surface_hydrology Drawing · 29 May 2025
  • Volume_3_ta8_6_figure_8_6_3_superficial_geology Drawing · 29 May 2025
  • Volume_3_ta8_6_private water supply risk assessment_annex2_examplequestionnaire Reports (Public) · 29 May 2025
  • Volume_3_ta8_7_figure_8_7_1_1_4_gwdte-compressed Drawing · 29 May 2025
  • Volume_3_table_of_contents Reports (Public) · 29 May 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with East Ayrshire for determination, against a statutory target of eight weeks. Over the last year East Ayrshire's median decision took 66 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on East Ayrshire's portal will say. Our guide explains the common types.