Planning application
Chipperlaigan Farm Stair East Ayrshire KA5 5JB
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formation of field access
As published by the council, reference 17/0038/AN
Application record
- Reference
- 17/0038/AN
- Type
- Agriculture/Forestry Notification
- Status
- Decided
- Decision
- Approved
- Received
- 19 Jan 2017
- Validated
- 31 Jan 2017
- Decided
- 23 Feb 2017
- Ward
- Doon Valley
- Decision by
- Delegated
- Postcode
- KA5 5JB
Site history
Applications at this address on the East Ayrshire register
This site has had 2 applications since 2014: 2 approved, 0 refused.
-
14/0802/PP Granted
Chipperlaigan Farm Stair East Ayrshire KA5 5JB
Demolition of the existing cable sealing ends, surge arrester structures, platform and foundations and the construction of a new gas insulated bus bar compound, access road and perimeter fence, as well as a temporary access road.
Timeline
Dates from the published record
-
19 Jan 2017
Received by East Ayrshire
-
31 Jan 2017
Validated
Checked as complete and ready for consideration.
-
23 Feb 2017
Decision issued: Approved
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Ayrshire granted permission on 23 February 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Chipperlaigan Farm C82 Schaw/crosshill From Crosshill Nr Barskimming To B730 At Schaw Stair East Ayrshire KA5 5JB
Request for screening opinion for the demolition of the existing cable sealing ends, surge arrester structures, platform and foundations and the construction of a new gas insulated bus bar compound, access road and perimeter fence as well as a temporary access road
Decided Outline Demolition 15 docsSmall domestic -
Chipperlaigan Farm C82 Schaw/crosshill From Crosshill Nr Barskimming To B730 At Schaw Stair East Ayrshire KA5 5JB
Discharge of Condition 4 (Piping arrangements for ditch) of Planning Consent 14/0802/PP
Granted Conditions 6 docs -
Chipperlaigan Farm C82 Schaw/crosshill From Crosshill Nr Barskimming To B730 At Schaw Stair East Ayrshire KA5 5JB
Discharge Condition 13 (Landscaping) of Planning Consent 14/0802/PP
Granted Conditions 4 docs -
Chipperlaigan Farm C82 Schaw/crosshill From Crosshill Nr Barskimming To B730 At Schaw Stair East Ayrshire KA5 5JB
Discharge of Condition No.1 (Traffic Management Plan) of Planning Consent 14/0802/PP
Granted Conditions 4 docs -
Chipperlaigan Farm C82 Schaw/crosshill From Crosshill Nr Barskimming To B730 At Schaw Stair East Ayrshire KA5 5JB
Discharge of Condition No. 8 (Screening along flank) of Planning Consent No. 14/0802/PP
Granted Conditions 3 docs -
Chipperlaigan Farm Stair East Ayrshire KA5 5JB
Demolition of the existing cable sealing ends, surge arrester structures, platform and foundations and the construction of a new gas insulated bus bar compound, access road and perimeter fence, as well as a temporary access road.
Granted Full applications Demolition 42 docsSmall domestic
Other less common application types
In East Ayrshire
-
25/0335/HS Withdrawn
Whitelee Green Hydrogen Project Lochgoin Fenwick Kilmarnock KA3 6EX
Electrolysis of water to produce hydrogen for sale using 2 x 5MW PEM electrolyser trains which will split demineralized water into hydrogen and oxygen. The water will be sourced from mains supply and will be stored in a common tank. The hydrogen will then be exported from site in dedicated road-going tube trailers.
-
23/0398/HS Granted
South Drumboy Farm Glasgow Road Kilmarnock East Ayrshire KA3 6EU
Application for hazardous substance consent (comprising the storage, handling, processing and transportation of hazard category P5C flammable liquids)
-
23/0582/DN Granted
120 Ayr Road Cumnock East Ayrshire KA18 1EQ
Prior Notification for Demolition of buildings.
-
23/0594/AN Granted
Taiglim Farm Glaisnock Road Netherthird Cumnock East Ayrshire KA18 4PJ
Prior Notification for Farm-related Building Works (Non-residential).
-
23/0529/AN Granted
Syke Farm U732 Haugh And Syke From Station Road Mauchline To C50 Knowe Brackenhill Mauchline East Ayrshire KA5 5JT
Prior Notification for Farm-related Building Works (Non-residential).