Skip to content
PlanIndex Get alerts
Menu

Planning application

Burnfoot Farm U731 Greenock Water From B743 North Of Muirkirk To A70 At Nether Wellwood Muirkirk East Ayrshire KA18 3NJ

Granted East Ayrshire 09/0768/AN Agriculture/Forestry Notification

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Covered/sheep handling facilities

As published by the council, reference 09/0768/AN

Application record

Reference
09/0768/AN
Type
Agriculture/Forestry Notification
Status
Decided
Decision
Approved
Received
28 Oct 2009
Validated
30 Oct 2009
Decided
2 Nov 2009
Ward
Ballochmyle
Parish
Muirkirk
Decision by
Delegated
Postcode
KA18 3NJ

Site history

Applications at this address on the East Ayrshire register

This site has had 3 applications since 2009: 3 approved, 0 refused.

  • 15/0526/AMCPPP Granted

    Burnfoot Farm U731 Greenock Water From B743 North Of Muirkirk To A70 At Nether Wellwood Muirkirk East Ayrshire KA18 3NJ

    Erection of Dwellinghouse

    Decided 27 Oct 2015 Conditions
  • 14/0535/PPP Granted

    Burnfoot Farm U731 Greenock Water From B743 North Of Muirkirk To A70 At Nether Wellwood Muirkirk East Ayrshire KA18 3NJ

    Erection of dwellinghouse and garage in association with existing kennels business.

    Decided 5 Dec 2014 Outline

Timeline

Dates from the published record

  1. 28 Oct 2009

    Received by East Ayrshire

  2. 30 Oct 2009

    Validated

    Checked as complete and ready for consideration.

  3. 2 Nov 2009

    Decision issued: Approved

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

East Ayrshire granted permission on 2 November 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In East Ayrshire

  • 25/0335/HS Withdrawn

    Whitelee Green Hydrogen Project Lochgoin Fenwick Kilmarnock KA3 6EX

    Electrolysis of water to produce hydrogen for sale using 2 x 5MW PEM electrolyser trains which will split demineralized water into hydrogen and oxygen. The water will be sourced from mains supply and will be stored in a common tank. The hydrogen will then be exported from site in dedicated road-going tube trailers.

    26 Jun 2025 Other
  • 23/0398/HS Granted

    South Drumboy Farm Glasgow Road Kilmarnock East Ayrshire KA3 6EU

    Application for hazardous substance consent (comprising the storage, handling, processing and transportation of hazard category P5C flammable liquids)

    24 Jul 2023 Other
  • 23/0582/DN Granted

    120 Ayr Road Cumnock East Ayrshire KA18 1EQ

    Prior Notification for Demolition of buildings.

    30 Oct 2023 Other
  • 23/0594/AN Granted

    Taiglim Farm Glaisnock Road Netherthird Cumnock East Ayrshire KA18 4PJ

    Prior Notification for Farm-related Building Works (Non-residential).

    6 Nov 2023 Other
  • 23/0529/AN Granted

    Syke Farm U732 Haugh And Syke From Station Road Mauchline To C50 Knowe Brackenhill Mauchline East Ayrshire KA5 5JT

    Prior Notification for Farm-related Building Works (Non-residential).

    25 Sep 2023 Other