Planning application
41 Belvue Road Northolt UB5 5HW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)
As published by the council, reference 260510PALHE
Application record
- Reference
- 260510PALHE
- Type
- Prior Approval - Larger Home Extension
- Status
- Prior Approval Not Required
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 10 Feb 2026
- Validated
- 10 Feb 2026
- Decided
- 9 Mar 2026
- Ward
- Northolt Mandeville
- Decision by
- Delegated Decision
- Postcode
- UB5 5HW
Timeline
Dates from the published record
-
10 Feb 2026
Received by Ealing
-
9 Mar 2026
Decision issued: Prior Approval Not Required
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
MJD Architecture Limited Agent, an architecture practice
14 applications on PlanIndex · across 7 councils · 54% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
- PROPOSED PLANS AND ELEVATIONS
- DECISION NOTICE
- OFFICERS REPORT
- APPLICATIONFORMREDACTED
- EXISTING PLANS AND ELEVATION
- PROPOSED PLANS AND ELEVATION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 9 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
41 Belvue Road Northolt UB5 5HW
Single storey front extension; two storey side and rear extension (following demolition of existing shed); alteration to front porch
Granted Householder Extension Demolition 10 docsSmall domestic -
41 Belvue Road Northolt UB5 5HW
Single storey rear extension (max 6m deep and max 2.96m high) (42 Days Prior Approval Notification Process)
Granted Prior approval Extension 6 docsSmall domestic -
35 Belvue Road Northolt UB5 5HW
Single storey rear extension (max 6.00m deep and max 3.45m high) (following demolition of existing rear extension and part of side extension) (42 Days Prior Approval Notification Process).
Granted Prior approval Extension Demolition 6 docsSmall domestic -
35 Belvue Road Northolt UB5 5HW
Alteration of roof from hip to gable end; rear roof extension; installation of window to side gable end; installation of three rooflights to front roof slope; single storey detached garden outbuilding (following demolition of the existing first floor side extension) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Extension Loft or dormer +2 9 docsSmall domestic -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 34 docs -
North Of Network Rail Cutting And East Of Mandeville Road Worksite Northolt Middlesex UB5 4NA
Application for a Non-Material Change (Section 21, Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017) seeking to allow changes to earthworks including a retaining wall to facilitate the relocation of the perimeter drainage channel and associated below ground services in relation to approval reference 230131HS2 dated 06/03/2023 for Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to; a vent shaft headhouse building with a footprint of 58m x 29m, comprising three principle connected headhouse elements (mechanical and electrical plant building, fan room and ventilation stacks) and access stairs located adjacent to the building. Road vehicle parking within the compound with a hardstanding area of approximately 820m2. Earthworks within the compound area for the headhouse building and associated hardstanding area, regrading and extension of existing access road, gabion walls for ecological enhancement with a slight retaining function, a flood defence wall with a slight retaining function, a retaining wall on the northeast site boundary, and retaining walls adjacent to the access stairs on the embankment. Security fencing encircling the headhouse building, boundary fencing along the private access road and area of ecological mitigation, vehicle barrier adjacent to the south side of the access road, and guard rails adjacent to the access stairs. Artificial lighting equipment at the compound entrance, affixed to the headhouse building and walls, and pole mounted within the compound
Granted Extension 13 docs
Other prior approval applications
In Ealing
-
262956PALHE Refused
73 Ennismore Avenue Greenford UB6 0LQ
Single storey (Max 6m deep and Max 3.14m high) rear extension (following the demolition of existing single storey rear extension) (42 days Prior Notification Process)
-
262961PALHE Granted
13 Perimeade Road Perivale UB6 7AR
Single storey rear extension (max 6m deep and max 3.23m high) (42 Days Prior Approval Notification Process)
-
261860PALHE Granted
5 Cambridge Avenue Greenford UB6 0PH
Single storey rear extension (max 5.99m deep and max 2.95m high) (42 Days Prior Approval Notification Process)
-
261934PALHE Granted
109 Eastcote Avenue Greenford UB6 0NQ
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)
-
261823PALHE Refused
23 Marlow Road Southall UB2 4NS
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)