Skip to content
PlanIndex Get alerts
Menu

Planning application

13 - 19 The Green Southall UB2 4AH

Granted Ealing 253140CND Discharge Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of a piling methodology pursuant to condition 35 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works

As published by the council, reference 253140CND

Application record

Reference
253140CND
Type
Discharge Condition
Status
Approved
Decision
Approved
Received
15 Aug 2025
Validated
15 Aug 2025
Decided
12 Feb 2026
Ward
Southall Green
Decision by
Delegated Decision
Postcode
UB2 4AH

Site history

Applications at this address on the Ealing register

This site has had 8 applications since 2025: 5 approved, 0 refused.

  • 262752CND Awaiting decision

    13 - 19 The Green Southall UB2 4AH

    Submission of the Ventilation Strategy Report pursuant to condition 25 of planning permission 243547FUL dated 13.03.2025 for 'Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works'

    Submitted 13 Jul 2026
  • 262689CND Awaiting decision

    13 - 19 The Green Southall UB2 4AH

    Details of a refuse management plan pursuant to condition 39 of planning permission Ref: 243547FUL dated 13.03.2025 'Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.'

    Submitted 7 Jul 2026
  • 262411CND Decided

    13-19 The Green Southall UB2 4AH

    Details of Green travel plan pursuant to Condition 10 of Planning Permission Ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.

    Submitted 16 Jun 2026
  • 261909CND Granted

    13 - 19 The Green Southall UB2 4AH

    Details of the external materials pursuant to condition 4 of planning permission 243547FUL dated 13.03.2025 for 'Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works'

    Decided 26 May 2026 Conditions
  • 260409CND Granted

    13 - 19 The Green Southall UB2 4AH

    Details of Construction Management Plan (Stage 2) pursuant to condition 7 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works

    Decided 20 Apr 2026 Conditions
  • 260267CND Granted

    13 - 19 The Green Southall UB2 4AH

    Details of digital connectivity infrastructure in pursuant to condition 43 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.

    Decided 10 Apr 2026 Conditions
  • 260058NMA Granted

    13 - 19 The Green Southall UB2 4AH

    Application for a Non-Material Amendment in (S96a) to amend condition 38 in relation to planning permission reference 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.

    Decided 3 Mar 2026 Amendments

Timeline

Dates from the published record

  1. 15 Aug 2025

    Received by Ealing

  2. 12 Feb 2026

    Decision issued: Approved

  3. 11 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a construction firm registered in Marylebone

62 applications on PlanIndex · across 6 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Ealing granted permission on 12 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 13 - 19 The Green Southall UB2 4AH

    253140CND Submitted 15 Aug 2025 0m away

    Details of a piling methodology pursuant to condition 35 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works

    Granted Conditions 28 docs
  • 13 - 19 The Green Southall UB2 4AH

    260267CND Submitted 26 Jan 2026 0m away

    Details of digital connectivity infrastructure in pursuant to condition 43 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.

    Granted Conditions 4 docs
  • 13-15 The Green Southall Middlesex UB2 4AH

    214340SCE Submitted 15 Jun 2021 0m away

    Request for an EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2017 for mixed use redevelopment comprising 22 storeys building to provide up to 240 co-living units (Use Class Sui-Generis) and ground and first floor amenity space (Use Class E).

    Withdrawn Outline 1 doc
  • 13-15 The Green Southall Middlesex UB2 4AH

    214340SCE Submitted 15 Jun 2021 0m away

    Request for an EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2017 for mixed use redevelopment comprising 22 storeys building to provide up to 240 co-living units (Use Class Sui-Generis) and ground and first floor amenity space (Use Class E).

    Withdrawn Outline 1 doc
  • 13 - 19 The Green Southall UB2 4AH

    260267CND Submitted 26 Jan 2026 0m away

    Details of digital connectivity infrastructure in pursuant to condition 43 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works.

    Granted Conditions 4 docs
  • 13 - 19 The Green Southall UB2 4AH

    260409CND Submitted 3 Feb 2026 0m away

    Details of Construction Management Plan (Stage 2) pursuant to condition 7 of planning permission ref: 243547FUL dated 13/03/2025 for: Construction of 23 storey building, with a basement level, to be used as student accommodation (Use Class Sui Generis), provision of associated cycle storage, refuse storage facilities, amenity space, public realm, landscaping and associated works

    Granted Conditions 5 docs

In Ealing

  • 260882CND Refused

    Weaver Rose House High Street Southall UB1 3DN

    Details of a Ventilation Strategy Report pursuant to Condition 16 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)

    2 Mar 2026 Conditions
  • 260534CND Granted

    444 Allenby Road Southall UB1 2HT

    Submission of an enhanced sound insulation in pursuant to condition 9 of planning application Ref: 251383FUL dated 31.10.2025 for 'Conversion of dwellinghouse into two flats; single storey rear extension; front extension; front porch extension; part single, part two storey side extension (following demolition of existing garage); part single, part two storey rear extension with patio'

    5 Feb 2026 Conditions
  • 261058CND Granted

    Nile Lodge Queens Walk Ealing W5 1TJ

    Details of Ventilation Strategy Report pursuant to condition 10 of planning permission ref: 254396FUL dated 27/11/2024 for: Redevelopment of the site to deliver a hostel development (Sui Generis) in a part 4, part 5 storey building following the demolition of parts of the existing building on-site, retention of part of the front facade and associated external alterations, landscaping, car parking, refuse and cycle storage (part retrospective).

    11 Mar 2026 Conditions
  • 261853CND Granted

    Gurnell Leisure Centre Ruislip Road East West Ealing W13 0AL

    Details of Phasing Plan pursuant to partially discharge condition 5 of planning permission ref 241706OUTR3 (Phase 1) dated 21/03/2025 for: Hybrid planning application for comprehensive phased development incorporating the redevelopment of all existing buildings and structures and construction of new buildings comprising: ''Full planning permission for the construction of a replacement leisure centre (Use Class F2(d)), including new car / coach / cycle parking and vehicular / pedestrian access arrangements, associated highways works, new and replacement play space, public realm, landscaping and flood management to existing public open space. Outline planning permission (means of access not reserved) for about 300 affordable and market housing enabling residential development (Use Class C3), public realm, play and amenity space and open space improvements''. (Regulation 3 Application by London Borough of Ealing) (Revised red line boundary) The proposals represent a Departure from the Development Plan that is not in accordance with the development plan in force in the area, being a Major Development on land designated as Metropolitan Open Land and comprising public open space.

    5 May 2026 Conditions
  • 260883CND Granted

    Weaver Rose House High Street Southall UB1 3DN

    Details of a Piling Method Statement pursuant to Condition 20 of planning permission ref: 232967FUL dated 31.01.2024 for: Construction of a six storey building with part basement level, comprising 24 self contained flats with associated cycle and bin storage as well as soft and hard landscaping (Following Demolition of the existing buildings)

    2 Mar 2026 Conditions