Planning application
23 Bowes Road Acton W3 7AD
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)
As published by the council, reference 244010PALHE
Application record
- Reference
- 244010PALHE
- Type
- Prior Approval - Larger Home Extension
- Status
- Prior Approval Not Required
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 23 Oct 2024
- Validated
- 30 Oct 2024
- Decided
- 29 Nov 2024
- Ward
- East Acton
- Decision by
- Delegated Decision
- Postcode
- W3 7AD
Timeline
Dates from the published record
-
23 Oct 2024
Received by Ealing
-
30 Oct 2024
Validated
Checked as complete and ready for consideration.
-
29 Nov 2024
Decision issued: Prior Approval Not Required
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Architectural Service Agent, an architecture practice
58 applications on PlanIndex · across 39 councils · 86% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Ealing granted permission on 29 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
23 Bowes Road Acton W3 7AD
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)
Granted Prior approval Extension 5 docsSmall domestic -
9 Bowes Road Acton W3 7AD
Retention of Change of use of single family dwellinghouse (Use Class C3) to a large House in Multiple Occupation (HMO) comprising 8 bedrooms for up to 10 persons (Sui Generis) (Retrospective Application).
Granted Full applications 11 docsDomestic -
45 Bowes Road Acton W3 7AD
Conversion of existing outbuilding into 1 self-contained residential unit.
Withdrawn Full applications 10 docs -
40 East Acton Lane Acton W3 7EQ
Construction of a single storey self-contained two bedroom residential dwelling house in rear garden, with access from Bowes Road (following demolition of an existing garage) (Outline - All matters reserved)
Granted Outline Demolition 21 docsSmall domestic -
40 East Acton Lane Acton London W3 7EQ
Construction of a single storey self-contained two bedroom residential dwelling house in rear garden, with access from Bowes Road (following demolition of an existing garage) - (Outline Planning Application - Details of Access sought only, with Appearance, Landscaping, Layout and Scale matters reserved).
Granted Outline Demolition 9 docsSmall domestic -
40 East Acton Lane Acton W3 7EQ
Construction of a single storey self-contained two bedroom residential dwelling house in rear garden, with access from Bowes Road (following demolition of an existing garage) (Outline - All matters reserved)
Granted Outline Demolition 21 docsSmall domestic
Other prior approval applications
In Ealing
-
262956PALHE Refused
73 Ennismore Avenue Greenford UB6 0LQ
Single storey (Max 6m deep and Max 3.14m high) rear extension (following the demolition of existing single storey rear extension) (42 days Prior Notification Process)
-
262961PALHE Granted
13 Perimeade Road Perivale UB6 7AR
Single storey rear extension (max 6m deep and max 3.23m high) (42 Days Prior Approval Notification Process)
-
261860PALHE Granted
5 Cambridge Avenue Greenford UB6 0PH
Single storey rear extension (max 5.99m deep and max 2.95m high) (42 Days Prior Approval Notification Process)
-
261934PALHE Granted
109 Eastcote Avenue Greenford UB6 0NQ
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)
-
261823PALHE Refused
23 Marlow Road Southall UB2 4NS
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)