Planning application
8 Hanger Green Ealing W5 3EL
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension; installation of canopy structure; and all associated works (Amended plans)
As published by the council, reference 233913FUL
Application record
- Reference
- 233913FUL
- Type
- Full Application
- Status
- Granted with Conditions
- Decision
- Grant with Conditions
- Received
- 20 Sep 2023
- Validated
- 9 Oct 2023
- Decided
- 12 Sep 2024
- Ward
- Hanger Hill
- Decision by
- Delegated Decision
- Postcode
- W5 3EL
Timeline
Dates from the published record
-
20 Sep 2023
Received by Ealing
-
9 Oct 2023
Validated
Checked as complete and ready for consideration.
-
12 Sep 2024
Decision issued: Grant with Conditions
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Warwickshire
36 applications on PlanIndex · across 12 councils · 77% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
8 Hanger Green Ealing W5 3EL
Single storey rear extension; installation of canopy structure; and all associated works (Amended plans)
Granted Full applications Extension 14 docsSmall domestic -
8 Hanger Green Ealing W5 3EL
Single storey rear extension; installation of canopy structure; and all associated works (Amended plans)
Granted Heritage and listed buildings Extension 15 docsSmall domestic -
8 Hanger Green Ealing W5 3EL
Single storey rear extension; installation of canopy structure; and all associated works (Amended plans)
Granted Heritage and listed buildings Extension 15 docsSmall domestic -
16-18 Hanger Green Ealing W5 3EL
87% historically approved · decision due ~5 Oct
Change of use from existing lawful retail (Class E(a) use) to nursery (Class E(f) use) (Lawful Development Certificate for a Proposed Development)
Awaiting decision Lawful development 3 docs -
16-18 Hanger Green Ealing W5 3EL
87% historically approved · decision due ~5 Oct
Change of use from existing lawful retail (Class E(a) use) to nursery (Class E(f) use) (Lawful Development Certificate for a Proposed Development)
Awaiting decision 3 docs -
Park Royal Hotel Site Hanger Green/Connell Crescent Ealing W5 3BQ
Submission of BREEAM Final Certificate pursuant to condition 28 of planning permission PP/2012/3475 dated 26.09.2013 PP/2012/3475 as varied by PP/2014/5918, PP/2015/6576, 161609NMA, 180344NMA and 200469VAR for 'Redevelopment of site to provide a 152 bedroom hotel with ancillary bar and restaurant, basement parking, ground level service yard, visitor drop-off bays, cycle parking and landscaping; following part demolition of and extensions to locally listed building, including construction of an additional storey to main frontage, part 3 and 4 storey extension to west side and part 3, 4 and 5 storey extension to rear'.
Granted Conditions Extension Demolition 4 docs
Other full applications applications
In Ealing
-
252467FUL Granted
Post Office And Former Sorting Office 46 Mandeville Road Northolt UB5 5ZZ
Demolition of existing buildings and redevelopment of site to create a building arranged over ground, first, part second, part third and part fourth floors for Class E(a) (post office), other Class E(a -g) uses, Class E(g)(iii) (light industrial) and Class B8 (self-storage) uses, vehicle and cycle parking, landscaping, plant and associated works
-
251663FUL Refused
Fairlawn Hall High Street Southall UB1 3HB
Change of use of Club House (Use Class F1(e)) to restaurant and bar (Use Class E(b)); and associated internal and external alterations including refurbishment, repairs, re-pointing and re-painting of all elevations
-
261348FUL Refused
70 Greenford Avenue Hanwell W7 3QP
Change of use from a dwellinghouse (Use Class C3) into to a 12 bedrooms -House in Multiple Occupation (HMO)for up to 12 residents (Use Class Sui Generis); together with a single storey side/rear infill extension; first-floor infill extension; alterations to side elevation fenestrations; associated external and internal alterations; with and provision of refuse storage, cycle storage and amenity spaces
-
261132FUL Granted
49B Hamilton Road Ealing W5 2EE
Replacement of existing white timber framed single glazed sash windows with timber framed double glazed sash windows to ground floor flat
-
261723FUL Granted
Flat 58A Weston Road Chiswick W4 5NJ
Single storey side and rear wrap around extension (following demolition of existing rear extension)