Planning application
99 Woodlands Road Southall UB1 1EJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion of a single dwellinghouse into two self-contained residential units; and associated internal and external alteration (following of removal rear/side structure)
As published by the council, reference 230592FUL
Application record
- Reference
- 230592FUL
- Type
- Full Application
- Status
- Granted with Conditions
- Decision
- Grant with Conditions
- Received
- 13 Feb 2023
- Validated
- 13 Feb 2023
- Decided
- 6 Apr 2023
- Ward
- Southall West
- Decision by
- Delegated Decision
- Postcode
- UB1 1EJ
Timeline
Dates from the published record
-
13 Feb 2023
Received by Ealing
-
6 Apr 2023
Decision issued: Grant with Conditions
-
21 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Edgbaston
22 applications on PlanIndex · across 10 councils · 77% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
99 Woodlands Road Southall UB1 1EJ
Conversion of a single dwellinghouse into two self-contained residential units; and associated internal and external alteration (following of removal rear/side structure)
Granted Full applications 10 docsDomestic -
128 Trinity Road Southall UB1 1EL
86% historically approved · decision due ~8 Dec
Change of use of single dwellinghouse (Use Class C3) into a House in Multiple Occupation (HMO) (Use Class C4) for 6 occupants; rear roof extension; incorporating Juliet balcony; and installation of three rooflights to front roofslope (Lawful Development Certificate for a Proposed Development)
Awaiting decision Lawful development Extension Loft or dormer 5 docsDomestic -
128 Trinity Road Southall UB1 1EL
87% historically approved · decision due ~8 Dec
Change of use of single dwellinghouse (Use Class C3) into a House in Multiple Occupation (HMO) (Use Class C4) for 6 occupants; rear roof extension; incorporating Juliet balcony; and installation of three rooflights to front roofslope (Lawful Development Certificate for a Proposed Development)
Awaiting decision Lawful development Extension Loft or dormer 5 docsDomestic -
120 Woodlands Road Southall Middlesex UB1 1ED
Rear roof extension and installation of three rooflights to front roof slope (Lawful Development Certificate for Proposed Development)
Granted Lawful development Extension Loft or dormer 5 docs -
120 Woodlands Road Southall Middlesex UB1 1ED
Rear roof extension and installation of three rooflights to front roof slope (Lawful Development Certificate for Proposed Development)
Granted Lawful development Extension Loft or dormer 5 docs -
120 Woodlands Road Southall Middlesex UB1 1ED
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process).
Granted Prior approval Extension 5 docsSmall domestic
Other full applications applications
In Ealing
-
252467FUL Granted
Post Office And Former Sorting Office 46 Mandeville Road Northolt UB5 5ZZ
Demolition of existing buildings and redevelopment of site to create a building arranged over ground, first, part second, part third and part fourth floors for Class E(a) (post office), other Class E(a -g) uses, Class E(g)(iii) (light industrial) and Class B8 (self-storage) uses, vehicle and cycle parking, landscaping, plant and associated works
-
251663FUL Refused
Fairlawn Hall High Street Southall UB1 3HB
Change of use of Club House (Use Class F1(e)) to restaurant and bar (Use Class E(b)); and associated internal and external alterations including refurbishment, repairs, re-pointing and re-painting of all elevations
-
261348FUL Refused
70 Greenford Avenue Hanwell W7 3QP
Change of use from a dwellinghouse (Use Class C3) into to a 12 bedrooms -House in Multiple Occupation (HMO)for up to 12 residents (Use Class Sui Generis); together with a single storey side/rear infill extension; first-floor infill extension; alterations to side elevation fenestrations; associated external and internal alterations; with and provision of refuse storage, cycle storage and amenity spaces
-
261132FUL Granted
49B Hamilton Road Ealing W5 2EE
Replacement of existing white timber framed single glazed sash windows with timber framed double glazed sash windows to ground floor flat
-
261723FUL Granted
Flat 58A Weston Road Chiswick W4 5NJ
Single storey side and rear wrap around extension (following demolition of existing rear extension)