Planning application
230410PALHE
86 Brunswick Road Ealing W5 1AE
Proposal
Single storey (max. 4.00m deep and max. 3.00m high) rear extension (42 days Prior Notification Process)
As published by the council, reference 230410PALHE
Timeline
Dates from the published record
-
30 Jan 2023
Received by Ealing
-
6 Feb 2023
Validated
Checked as complete and ready for consideration.
-
17 Mar 2023
Decision issued: Prior Approval Not Required
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
243852PALHE Withdrawn
92 Brunswick Road Ealing W5 1AE
Single storey (Max 4m deep and Max 3.30m high) rear extension (42 days Prior Notification Process) following demolition of existing rear addition
-
230726CPL Refused
9 Lynwood Road Ealing London W5 1JQ
Rear roof extension incorporating a Juliet balcony, and installation of two roof lights to front roof slope (Lawful Development Certificate for a Proposed Development)
-
230553PALHE Refused
9 Lynwood Road Ealing London W5 1JQ
Single storey rear extension (max 4.5m deep and max 3m high) (42 Days Prior Approval Notification Process)
-
243299HH Granted
74 Brunswick Road Ealing W5 1AF
Single storey detached garden outbuilding for use as a garage & home office/gym (following demolition of existing).
-
214357PALHE Granted
36 Lynwood Road Ealing London W5 1JJ
Single storey (Max 6m deep and Max 3m high) rear extension (following removal of existing rear addition)(42 days Prior Notification Process)
-
261755CND Awaiting decision
1A Lynwood Road Ealing W5 1JH
Details of an enhanced sound insulation value of at least 10dB above the maximum Building Regulations value, for the floor/ceiling/wall structures separating different types of rooms/uses in adjoining dwellings/areas, namely, bedrooms adjoining/below/above the communal kitchens/dining/living/bathroom of separate dwelling adjoining the communal main entrance and staircase pursuant to condition 10 of planning permission ref: 251346FUL dated 19/01/2026 for: Change of use from a single dwellinghouse (Class C3) into an 11-bed HMO (Sui-Generis); part single, part two storey rear extension (following demolition of existing rear additions); alteration of roof from hip to gable end; rear roof extension; alterations to side fenestrations
Other prior approval applications
In Ealing
-
262618PALHE Refused
243 Park Avenue Southall UB1 3AP
Single storey rear extension (max 6m deep and max 3m high) (42 Days Prior Approval Notification Process)
-
262504PALHE Granted
40 Clare Road Greenford UB6 0DF
Single storey (Max 6m deep and Max 3m high) rear extension (42 days Prior Notification Process) following demolition of existing rear addition
-
262463PALHE Granted
25 Hunt Road Southall UB2 4PZ
Single storey (Max 6m deep and Max 3.60m high) rear extension (42 days Prior Notification Process)
-
262457PALHE Granted
27 Hunt Road Southall UB2 4PZ
Single storey (max 6.00m deep and max 3.60m high) rear extension (following demolition of existing rear extension) (42 Days Prior Approval Notification Process)
-
262467PALHE Granted
53 Havelock Road Southall UB2 4NY
Single storey (Max 4m deep and Max 3.20m high) rear extension (42 days Prior Notification Process)