Skip to content
PlanIndex Get alerts
Menu

Planning application

Assyrian Orthodox Church Westminster Road Hanwell London W7 3TU

Granted Ealing 214477FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a pergola with glass panels.

As published by the council, reference 214477FUL

Application record

Reference
214477FUL
Type
Full Application
Status
Granted with Conditions
Decision
Grant with Conditions
Received
1 Jul 2021
Validated
1 Jul 2021
Decided
27 Aug 2021
Ward
Elthorne
Decision by
Delegated Decision
Postcode
W7 3TU

Timeline

Dates from the published record

  1. 1 Jul 2021

    Received by Ealing

  2. 27 Aug 2021

    Decision issued: Grant with Conditions

  3. 31 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Manchester

3 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Assyrian Orthodox Church Westminster Road Hanwell London W7 3TU

    214477FUL Submitted 1 Jul 2021 0m away

    Installation of a pergola with glass panels.

    Granted Full applications 8 docs
  • 5 Brentwater Terrace Westminster Road Hanwell W7 3FH

    261574CPL Submitted 14 Apr 2026 19m away

    Single storey rear extension (Lawful Development Certificate for a Proposed Development)

    Withdrawn Lawful development Extension 7 docs
    Small domestic
  • 5 Brentwater Terrace Westminster Road Hanwell W7 3FH

    261574CPL Submitted 14 Apr 2026 19m away

    Single storey rear extension (Lawful Development Certificate for a Proposed Development)

    Withdrawn Lawful development Extension 7 docs
    Small domestic
  • 1 And 3 Westminster Road Hanwell W7 3TU

    261350FUL Submitted 27 Mar 2026 26m away

    76% historically approved · decision due ~22 May

    Construction of a four storey residential building with basement to provide 9 self-contained units (Following demolition of existing semi-detached residential buildings) with associated amenity space, cycle and refuse storage, boundary treatment

    Awaiting decision Full applications Demolition 17 docs
  • 1 And 3 Westminster Road Hanwell W7 3TU

    261350FUL Submitted 27 Mar 2026 26m away

    75% historically approved · decision due ~22 May

    Construction of a four storey residential building with basement to provide 9 self-contained units (Following demolition of existing semi-detached residential buildings) with associated amenity space, cycle and refuse storage, boundary treatment

    Awaiting decision Full applications Demolition 17 docs
  • 144-156 Uxbridge Road Hanwell W7 3TB

    213689ADV Submitted 17 May 2021 47m away

    Installation of 1 x welcome sign; 1 x fascia sign; 1 x projecting sign, 1 x entrance informative panel; 1 x automated door sign; and 1 x internally illuminated projecting ATM sign (Advertisement Consent).

    Granted Advertising 5 docs

In Ealing

  • 252467FUL Granted

    Post Office And Former Sorting Office 46 Mandeville Road Northolt UB5 5ZZ

    Demolition of existing buildings and redevelopment of site to create a building arranged over ground, first, part second, part third and part fourth floors for Class E(a) (post office), other Class E(a -g) uses, Class E(g)(iii) (light industrial) and Class B8 (self-storage) uses, vehicle and cycle parking, landscaping, plant and associated works

    24 Jun 2025 Full applications
  • 251663FUL Refused

    Fairlawn Hall High Street Southall UB1 3HB

    Change of use of Club House (Use Class F1(e)) to restaurant and bar (Use Class E(b)); and associated internal and external alterations including refurbishment, repairs, re-pointing and re-painting of all elevations

    22 Apr 2025 Full applications
  • 261348FUL Refused

    70 Greenford Avenue Hanwell W7 3QP

    Change of use from a dwellinghouse (Use Class C3) into to a 12 bedrooms -House in Multiple Occupation (HMO)for up to 12 residents (Use Class Sui Generis); together with a single storey side/rear infill extension; first-floor infill extension; alterations to side elevation fenestrations; associated external and internal alterations; with and provision of refuse storage, cycle storage and amenity spaces

    27 Mar 2026 Full applications
  • 261132FUL Granted

    49B Hamilton Road Ealing W5 2EE

    Replacement of existing white timber framed single glazed sash windows with timber framed double glazed sash windows to ground floor flat

    16 Mar 2026 Full applications
  • 261723FUL Granted

    Flat 58A Weston Road Chiswick W4 5NJ

    Single storey side and rear wrap around extension (following demolition of existing rear extension)

    21 Apr 2026 Full applications