Planning application
2 - 4 Forfar Road Dundee DD4 7AR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from Class 1A unit to hot food takeaway (sui generis) and installation of ventilation system
As published by the council, reference 26/00357/FULL
Application record
- Reference
- 26/00357/FULL
- Type
- Full Application Local
- Status
- Registered
- Received
- 5 Jun 2026
- Validated
- 19 Jun 2026
- Ward
- Maryfield
- Parish
- Stobswell Forum
- Postcode
- DD4 7AR
Timeline
Dates from the published record
-
5 Jun 2026
Received by Dundee City
-
19 Jun 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dundee City took a median of 58 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
LJR+H Architects Agent, an architecture practice
17 applications on PlanIndex · across 3 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- ROADS
- 10 - PARKING STRATEGY
- APPLICATION PDF
- 07A - PROPOSED ELEVATIONS REV A
- 03A - PROPOSED SITE PLAN REV A
- 08A - SUPPORTING STATEMENT REV A
- ACKNOWLEDGEMENT
- INVALID LETTER
- 06 - EXISTING ELEVATIONS
- 04 - EXISTING FLOOR PLAN
- 02 - EXISTING SITE PLAN
- 01 - LOCATION PLAN
- APPLICATION FORM
- 05 - PROPOSED FLOOR PLAN
- 09 - VENTILATION STRATEGY
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dundee City for determination, against a statutory target of eight weeks. Over the last year Dundee City decided full applications in a median of 66 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
-
100 Dura Street Dundee DD4 6TE
Erection of new commercial unit for class 2 use
Granted Full applications 6 docs -
37A Mains Loan Dundee DD4 7AB
Norway spruce (T1) - Would like to cut down tree entirely
Decided Trees 5 docs -
-
-
29-33 Mains Loan Dundee DD4 7AB
Shop front and other elevational alterations
Granted Full applications Windows or glazing
Other full applications
In Dundee City
-
25/00660/FULL Granted
Land To South Of Diy Warehouse Kings Cross Road Dundee
Formation of external vehicle storage area and associated works
-
26/00007/FULL Granted
Land To East Of Ballumbie Road Dundee
Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)
-
26/00008/FULL Granted
Land To East Of Ballumbie Road Dundee
Erection of 35 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)
-
26/00006/FULL Granted
Land To East Of Ballumbie Road Dundee
Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)
-
26/00485/FULL Granted
48 Peel Street Dundee DD2 3TZ
Erection of garage