Planning application

137A Broughty Ferry Road Dundee DD4 7NL

Awaiting decision Dundee City 25/00676/FULL Full Application Local

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of garage and the erection of 3 detached dwelling houses

As published by the council, reference 25/00676/FULL

Application record

Reference
25/00676/FULL
Type
Full Application Local
Status
Registered
Received
10 Dec 2025
Validated
10 Dec 2025
Ward
East End
Parish
No CC/NRS In Operation
Postcode
DD4 7NL

Timeline

Dates from the published record

  1. 10 Dec 2025

    Received by Dundee City

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 4 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dundee City took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Block 9 Architects Agent, an architecture practice registered in Edinburgh

Active · incorporated 2014 · Edinburgh

3 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

40 documents on file for this application

  • 25A - ACCESS JUNCTION PLAN AND DETAIL Drawing · 31 Jul 2026
  • NETWORK RAIL - CONDITIONS Consultee Comment · 07 Jan 2026
  • ADVERT FEE REQUEST Correspondence · 05 Jan 2026
  • ACKNOWLEDGEMENT Application Acknowledgement · 17 Dec 2025
  • 28 - DESIGN STATEMENT - PART 1 Report · 10 Dec 2025
  • 29 - DESIGN STATEMENT - PART 2 Report · 10 Dec 2025
  • 30 - DESIGN STATEMENT - PART 3 Report · 10 Dec 2025
  • 10 - PLOT 1 PROPOSED ELEVATIONS Drawing · 10 Dec 2025
  • 11 - PLOT 1 PROPOSED ELEVATIONS Drawing · 10 Dec 2025
  • 13 - PLOT 1 PROPOSED SECTIONS AA BB Drawing · 10 Dec 2025
  • 12 - PLOT 2 AND 3 PROPOSED ELEVATIONS Drawing · 10 Dec 2025
  • 14 - PLOT 2 PROPOSED SECTIONS AA BB Drawing · 10 Dec 2025
  • 15 - PLOT 3 - PROPOSED SECTIONS AA BB Drawing · 10 Dec 2025
  • 20 - PRE DEVELOPMENT EXISTING OVERLAND FLOWS Drawing · 10 Dec 2025
  • 21 - POST DEVELOPMENT PROPOSED OVERLAND FLOWS Drawing · 10 Dec 2025
  • 22 - PROPOSED DRAINAGE LAYOUT Drawing · 10 Dec 2025
  • 26 - ROAD FINISHES LAYOUT Drawing · 10 Dec 2025
  • 27 - VEHICLE TRACKING Drawing · 10 Dec 2025
  • 32 - DRAINAGE STRATEGY AND SURFACE WATER MANAGEMENT PLAN Report · 10 Dec 2025
  • 31 - COMBINED STAGE 1 AND STAGE 2 ROAD SAFETY AUDIT Report · 10 Dec 2025
  • 01 - LOCATION PLAN Drawing · 10 Dec 2025
  • APPLICATION FORM Application Form · 10 Dec 2025
  • 35 - NOISE IMPACT ASSESSMENT Report · 10 Dec 2025
  • 33 - GEO-ENVIRONMENTAL INVESTIGATION - PART 1 Report · 10 Dec 2025
  • 34 - GEO-ENVIRONMENTAL INVESTIGATION - PART 2 Report · 10 Dec 2025
  • 36 - STAGE 1 BAT SURVEY GROUND LEVEL TREE ASSESSMENT AND PRELIMINARY ECOLOGICAL Report · 10 Dec 2025
  • 02 - EXISTING SITE PLAN Drawing · 10 Dec 2025
  • 17 - DOWNTAKINGS SITE PLAN Drawing · 10 Dec 2025
  • 16 - PROPOSED SITE ROOF PLAN Drawing · 10 Dec 2025
  • 05 - PROPOSED SITE PLAN Drawing · 10 Dec 2025
  • 23 - PROPOSED SITE PLAN VISIBILITY SPLAYS Drawing · 10 Dec 2025
  • 24 - PROPOSED LANDSCAPE PLAN Drawing · 10 Dec 2025
  • 03 - EXISTING SITE ELEVATIONS AND SECTIONS AA BB Drawing · 10 Dec 2025
  • 18 - DOWNTAKINGS SITE ELEVATIONS AND SECTIONS AA BB Drawing · 10 Dec 2025
  • 06 - PROPOSED SITE ELEVATIONS AND SECTIONS AA BB Drawing · 10 Dec 2025
  • 04 - EXISTING SITE SECTIONS CC DD EE Drawing · 10 Dec 2025
  • 19 - DOWNTAKINGS SITE SECTIONS CC DD EE Drawing · 10 Dec 2025
  • 07 - PROPOSED SITE SECTIONS CC DD EE Drawing · 10 Dec 2025
  • 08 - PLOT 1 PROPOSED FLOOR PLANS Drawing · 10 Dec 2025
  • 09 - PLOTS 2 AND 3 PROPOSED FLOOR PLANS Drawing · 10 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Dundee City for determination, against a statutory target of eight weeks. Over the last year Dundee City decided full applications in a median of 66 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Dundee City

  • 25/00660/FULL Granted

    Land To South Of Diy Warehouse Kings Cross Road Dundee

    Formation of external vehicle storage area and associated works

    28 Nov 2025 Full applications
  • 26/00007/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    7 Jan 2026 Full applications
  • 26/00008/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 35 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    7 Jan 2026 Full applications
  • 26/00006/FULL Granted

    Land To East Of Ballumbie Road Dundee

    Erection of 42 dwellinghouses (change of house type and plot layout of planning permission 20/00423/FULM)

    6 Jan 2026 Full applications
  • 26/00485/FULL Granted

    48 Peel Street Dundee DD2 3TZ

    Erection of garage

    6 Aug 2026 Full applications