Skip to content
PlanIndex Get alerts
Menu

Planning application

Nith Bridge Between Thornhill And Penpont A702 Thornhill

Awaiting decision Dumfries and Galloway 26/1659/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

LATE LISTED BUILDING CONSENT FOR ALTERATIONS AND INSTALLATION OF TRAFFIC LIGHT CONTROL SYSTEM INCLUDING SIGNAGE AND BOLLARDS AND ASSOCIATED WORKS

As published by the council, reference 26/1659/LBC

Application record

Reference
26/1659/LBC
Type
Listed Building Consent
Status
Assessment Stage
Received
22 Sep 2026
Validated
22 Sep 2026
Ward
Mid And Upper Nithsdale
Parish
Thornhill Community Council

Timeline

Dates from the published record

  1. 22 Sep 2026

    Received by Dumfries and Galloway

  2. 24 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dumfries and Galloway took a median of 50 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Transport Planning & Engineering Ltd Agent, a planning consultancy registered in Glasgow

Active · incorporated 2006 · Glasgow

4 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway decided heritage and listed building applications in a median of 62 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

In Dumfries and Galloway

  • 26/1360/LBC Granted

    Lower Double Lodge Cally Gatehouse Of Fleet DG7 2DB

    ERECTION OF SINGLE STOREY EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE

    Received 5 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • 26/0992/LBC Granted

    Buccleuch Street Bridge, Dumfries (Whitesands Project (Flood Protection Scheme And Public Realm Improvements 2017))

    INTEGRATION OF FLOOD WALL TO NORTHERN SIDE OF BRIDGE

    Received 5 Jun, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/1323/LBC Granted

    Conchieton Kirkcudbright DG6 4TA

    INSTALLATION OF 8 NO. REPLACEMENT WINDOWS WITH TIMBER DOUBLE GLAZED WINDOWS

    Received 30 Jul, published by the council 24 Aug 2026 Heritage and listed buildings
  • 26/1349/LBC Granted

    133A King Street Castle Douglas DG7 1LZ

    ALTERATIONS INCLUDING REMOVAL OF ATM, NIGHT SAFE AND ALL SIGNAGE

    Received 4 Aug, published by the council 6 Aug 2026 Heritage and listed buildings
  • 26/1700/LBC Awaiting decision

    3 Bella Vista Powfoot Annan DG12 5PH

    INSTALLATION OF ELECTRIC STORAGE HEATERS AND ROOF MOUNTED PHOTOVOLTAIC PANELS TO SOUTH-WEST ELEVATION OF DWELLINGHOUSE

    Received 29 Sep, published by the council 30 Sep 2026 Heritage and listed buildings