Planning application
Proposed Divot Hill Wind Farm Site Land 7km To The North-east Of St John's Town Of Dalry Castle Douglas
Relates to 23/0368/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
ERECTION, 35-YEAR OPERATION AND SUBSEQUENT DECOMMISSIONING OF A WIND FARM COMPRISING UP TO NINE WIND TURBINES, INCLUDING ASSOCIATED INFRASTRUCTURE (AT VARIANCE WITH CONDITIONS 2 AND 12 OF PLANNING PERMISSION 23/0368/FUL TO ALLOW CHANGES TO TURBINE POSITIONS AND ANCILLARY INFRASTRUCTURE LAYOUT OUTWITH THE APPROVED MICROSITING ALLOWANCE SET OUT WITHIN 23/0368/FUL) (SECTION 42)
As published by the council, reference 26/0135/S42
Application record
- Reference
- 26/0135/S42
- Type
- Section 42
- Status
- Assessment Stage
- Received
- 27 Jan 2026
- Validated
- 27 Jan 2026
- Ward
- Dee And Glenkens
- Parish
- Dalry Community Council
Site history
Applications at this address on the Dumfries and Galloway register
This site has had 2 applications since 2026.
-
26/0136/S42 Awaiting decision
Proposed Divot Hill Wind Farm Site Land 7km To The North-east Of St John's Town Of Dalry Castle Douglas
ERECTION, 35-YEAR OPERATION AND SUBSEQUENT DECOMMISSIONING OF A WIND FARM COMPRISING UP TO NINE WIND TURBINES, INCLUDING ASSOCIATED INFRASTRUCTURE (AT VARIANCE WITH CONDITIONS 2 AND 12 OF PLANNING PERMISSION 23/0368/FUL TO ALLOW CHANGES TO TURBINE POSITIONS AND INFRASTRUCTURE LAYOUT OUTWITH THE CONSENTED MICROSITING ALLOWANCE AND TO ALLOW AN INCREASE IN TURBINE TIP HEIGHT FROM 200 METRES TO 220 METRES) (SECTION 42)
Timeline
Dates from the published record
-
27 Jan 2026
Received by Dumfries and Galloway
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dumfries and Galloway took a median of 47 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
23/0368/FUL Granted
Margree Area (Proposed Divot Hill Wind Farm) 7km To The North-east Of St John's Town Of Dalry Castle Douglas
ERECTION OF WIND FARM CONSISTING OF 9 WIND TURBINES (MAXIMUM HEIGHT TO BLADE TIP 200 METRES) WITH ASSOCIATED TRANSFORMERS, ERECTION OF SUBSTATION AND BATTERY STORAGE FACILITY, FORMATION OF HARD STANDING AREAS, ACCESS TRACKS, WATERCOURSE CROSSINGS, BORROW PITS, TEMPORARY CONSTRUCTION COMPOUND AND ASSOCIATED WORKS
Documents
Plans, drawings, consultee responses and the officer's report
57 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway's median decision took 47 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Dumfries and Galloway's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Proposed Divot Hill Wind Farm Site Land 7km To The North-east Of St John's Town Of Dalry Castle Douglas
95% historically approved · decision due ~25 Mar
ERECTION, 35-YEAR OPERATION AND SUBSEQUENT DECOMMISSIONING OF A WIND FARM COMPRISING UP TO NINE WIND TURBINES, INCLUDING ASSOCIATED INFRASTRUCTURE (AT VARIANCE WITH CONDITIONS 2 AND 12 OF PLANNING PERMISSION 23/0368/FUL TO ALLOW CHANGES TO TURBINE POSITIONS AND INFRASTRUCTURE LAYOUT OUTWITH THE CONSENTED MICROSITING ALLOWANCE AND TO ALLOW AN INCREASE IN TURBINE TIP HEIGHT FROM 200 METRES TO 220 METRES) (SECTION 42)
Awaiting decision 64 docs -
Margree Area (Proposed Divot Hill Wind Farm) 7km To The North-east Of St John's Town Of Dalry Castle Douglas
ERECTION OF WIND FARM CONSISTING OF 9 WIND TURBINES (MAXIMUM HEIGHT TO BLADE TIP 200 METRES) WITH ASSOCIATED TRANSFORMERS, ERECTION OF SUBSTATION AND BATTERY STORAGE FACILITY, FORMATION OF HARD STANDING AREAS, ACCESS TRACKS, WATERCOURSE CROSSINGS, BORROW PITS, TEMPORARY CONSTRUCTION COMPOUND AND ASSOCIATED WORKS
Granted Full applications 139 docs