Skip to content
PlanIndex Get alerts
Menu

Planning application

Proposed Troston Loch Wind Farm Approximately 7KM West Of Moniaive

Awaiting decision Dumfries and Galloway 25/1749/CSG SG Scoping/Screening/Gatecheck

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

CONSULTATION REQUEST FROM SCOTTISH MINISTERS IN CONNECTION WITH ERECTION OF WIND FARM COMPRISING 14 WIND TURBINES (MAXIMUM BLADE TIP 149.9 METRES), BATTERY STORAGE FACILITY AND ASSOCIATED WORKS AT POTENTIAL VARIANCE WITH CONDITION 2 OF DEEMED PLANNING PERMISSION ECU00001785 TO ALLOW FOR AN EXTENSION TO THE COMMENCMENT PERIOD OF A FURTHER 24 MONTHS

As published by the council, reference 25/1749/CSG

Application record

Reference
25/1749/CSG
Type
SG Scoping/Screening/Gatecheck
Status
Assessment Stage
Received
18 Sep 2025
Validated
18 Sep 2025
Ward
Mid And Upper Nithsdale
Parish
Dalry Community Council

Site history

Applications at this address on the Dumfries and Galloway register

This site has had 2 applications since 2025.

  • 25/0722/CSG Decided

    Proposed Troston Loch Wind Farm Approximately 7KM West Of Moniaive

    CONSULTATION REQUEST FROM SCOTTISH MINISTERS IN CONNECTION WITH REQUEST FOR SCOPING OPINION UNDER ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2017 FOR PROPOSED WIND FARM CONSISTING OF UP TO 12 WIND TURBINES (MAXIMUM TIP HEIGHT 200 METRES), ENERGY STORAGE FACILITY AND ASSOCIATED INFRASTRUCTURE

    Decided 27 May 2025 Outline

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by Dumfries and Galloway

  2. 6 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dumfries and Galloway took a median of 50 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway decided outline applications in a median of 1 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Dumfries and Galloway

  • 26/1717/SCR Awaiting decision

    Arbrack Farm Whithorn Newton Stewart DG8 8HY

    SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017 FOR ERECTION OF EGG PRODUCTION UNIT (32,000 BIRDS) WITH ROOF MOUNTED SOLAR PANELS, 2 FEED SILOS AND ASSOCIATED INFRASTRUCTURE

    Received 1 Oct, published by the council 6 Oct 2026 Outline
  • 26/1708/UTL Granted

    Main Street Auchencairn Castle Douglas DG7 1QU

    INSTALLATION OF 1NO. TELECOMMUNICATIONS POLE

    Received 30 Sep, published by the council 6 Oct 2026 Outline
  • 26/1709/PIP Awaiting decision

    Land Adjacent To Former East Morton School Caretakers House Manse Road Thornhill DG3 5DR

    ERECTION OF TWO DWELLINGHOUSES AND FORMATION OF ACCESSES

    Received 30 Sep, published by the council 6 Oct 2026 Outline
  • 26/1707/UTL Granted

    Kirkgate Throughgate Dunscore DG2 0TA

    INSTALLATION OF 1NO. TELECOMMUNICATIONS POLE

    Received 30 Sep, published by the council 6 Oct 2026 Outline
  • 26/1388/PIP Granted

    1 Rigg Cottage Rigg Gretna DG16 5HA

    ERECTION OF DWELLINGHOUSE (RENEWAL OF PLANNING PERMISSION IN PRINCIPLE PREVIOUSLY GRANTED UNDER 22/2286/PIP)

    Received 10 Aug, published by the council 13 Aug 2026 Outline