Planning application
Tongland Power Station Tongland Kirkcudbright DG6 4LT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
PARTIALLY LATE LISTED BUILDING CONSENT FOR FORMATION OF CONCRETE PLINTH, INSTALLATION OF GENERATOR AND FUEL TANK, ERECTION OF 2.1M HIGH FENCE AND ASSOCIATED INFRASTRUCTURE
As published by the council, reference 25/1698/LBC
Application record
- Reference
- 25/1698/LBC
- Type
- Listed Building Consent
- Status
- Assessment Stage
- Received
- 11 Sep 2025
- Validated
- 11 Sep 2025
- Ward
- Dee And Glenkens
- Parish
- Tongland And Ringford Community Council
- Postcode
- DG6 4LT
Site history
Applications at this address on the Dumfries and Galloway register
This site has had 8 applications since 2025: 6 approved, 0 refused.
-
26/0515/LBC Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF REPLACEMENT EXTERNAL DOORS AND INTERNAL WINDOW BARS
-
26/0162/FUL Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 2 NO. DOUBLE ELECTRIC VEHICLE CHARGING POINTS, DUCTS AND PROTECTIVE BARRIERS, REPLACEMENT STEPS AND HANDRAIL, UPGRADING OF EXISTING HARDSTANDING AREA AND ASSOCIATED WORKS (PARTIALLY RETROSPECTIVE)
-
25/2165/LBC Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF REPLACEMENT TURBINE GOVERNOR TO EACH GENERATOR AND ASSOCIATED WORKS (REMOVAL OF EXISTING ACTUATOR, PIPEWORK, DRIVE SHAFT, AIR/OIL RECEIVER AND PUMP)
-
25/1764/UTL Awaiting decision
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 64 METRES OF DUCT
-
25/1548/FUL Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
FORMATION OF CONCRETE PLINTH, INSTALLATION OF GENERATOR AND FUEL TANK, ERECTION OF 2.1M HIGH FENCE AND ASSOCIATED INFRASTRUCTURE
-
25/1530/FUL Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 210 NO. ROOF MOUNTED PHOTOVOLTAIC SOLAR PANELS AND ASSOCIATED INFRASTRUCTURE
-
25/1529/LBC Granted
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 210 NO. ROOF MOUNTED PHOTOVOLTAIC SOLAR PANELS AND ASSOCIATED INFRASTRUCTURE
Timeline
Dates from the published record
-
11 Sep 2025
Received by Dumfries and Galloway
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dumfries and Galloway took a median of 47 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway decided heritage and listed building applications in a median of 61 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF REPLACEMENT TURBINE GOVERNOR TO EACH GENERATOR AND ASSOCIATED WORKS (REMOVAL OF EXISTING ACTUATOR, PIPEWORK, DRIVE SHAFT, AIR/OIL RECEIVER AND PUMP)
Granted Heritage and listed buildings 8 docs -
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 2 NO. DOUBLE ELECTRIC VEHICLE CHARGING POINTS, DUCTS AND PROTECTIVE BARRIERS, REPLACEMENT STEPS AND HANDRAIL, UPGRADING OF EXISTING HARDSTANDING AREA AND ASSOCIATED WORKS (PARTIALLY RETROSPECTIVE)
Granted Full applications 12 docs -
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 210 NO. ROOF MOUNTED PHOTOVOLTAIC SOLAR PANELS AND ASSOCIATED INFRASTRUCTURE
Granted Heritage and listed buildings 24 docs -
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF 210 NO. ROOF MOUNTED PHOTOVOLTAIC SOLAR PANELS AND ASSOCIATED INFRASTRUCTURE
Granted Full applications 24 docs -
Tongland Power Station Tongland Kirkcudbright DG6 4LT
INSTALLATION OF REPLACEMENT EXTERNAL DOORS AND INTERNAL WINDOW BARS
Granted Heritage and listed buildings Windows or glazing 20 docs -
Tongland Power Station Tongland Kirkcudbright DG6 4LT
96% historically approved · decision due ~17 Nov
INSTALLATION OF 64 METRES OF DUCT
Awaiting decision Outline 3 docs
Other heritage and listed building applications
In Dumfries and Galloway
-
26/1550/LBC Awaiting decision
Lockerbie Town Hall High Street Lockerbie DG11 2ES
REPAIR AND REPLACEMENT OF STONEWORK TO WEST ELEVATION OF TOWN HALL
-
26/1537/LBC Awaiting decision
Hetland Hall Hotel Carrutherstown Dumfries DG1 4JX
ALTERATIONS AND ERECTION OF EXTENSIONS TO HOTEL TO FORM ADDITIONAL BEDROOMS, WEDDING CEREMONY ROOM AND SPA FACILITY INCLUDING SWIMMING POOL
-
26/1530/LBC Awaiting decision
136 High Street Dumfries DG1 2BG
ALTERATIONS INCLUDING RE-SLATING OF ROOF, REPLACEMENT TIMBER SARKING, REPAIR AND REPAINTING OF EXISTING TIMBER WINDOWS AND EXTERNAL RENDERED AND STONE FACADES AND REPLACEMENT OF DAMAGED GLAZING
-
26/1074/LBC Granted
Mahaar Schoolhouse Kirkcolm Stranraer DG9 0NZ
ERECTION OF EXTENSION TO SOUTH ELEVATION OF DWELLINGHOUSE
-
26/0816/LBC Granted
Glasserton Church Whithorn Newton Stewart DG8 8LY
ALTERATIONS, EXTENSION AND FORMATION OF ROOF TO BRING ABOUT CHANGE OF USE OF VESTRY TO DWELLINGHOUSE (CLASS 9)