Little Hartfell Corrie Common Lockerbie

Awaiting decision Dumfries and Galloway 22/1431/S42 Section 42

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

ERECTION OF WIND FARM COMPRISING 12 WIND TURBINES (MAX HEIGHT 160M TO BLADE TIP), FORMATION OF ACCESS TRACKS, BORROW PIT, TEMPORARY CONSTRUCTION COMPOUND, ERECTION OF CONTROL BUILDING AND ON-SITE SUBSTATION AND ASSOCIATED INFRASTRUCTURE WITHOUT COMPLIANCE WITH CONDITION 2 OF PLANNING PERMISSION 18/0188/FUL TO INCREASE THE OPERATIONAL LIFE OF THE WINDFARM FROM 25 YEARS TO 30 YEARS FROM THE DATE OF FIRST COMMISSIONING

As published by the council, reference 22/1431/S42

Application record

Reference
22/1431/S42
Type
Section 42
Status
Assessment Stage
Received
1 Aug 2022
Validated
5 Aug 2022
Ward
Annandale South

Site history

Applications at this address on the Dumfries and Galloway register

This site has had 2 applications since 2020: 0 approved, 1 refused.

  • 20/1844/FUL Refused

    Little Hartfell Corrie Common Lockerbie

    ERECTION OF WIND FARM COMPRISING 9 WIND TURBINES (MAX HEIGHT 190M TO BLADE TIP), FORMATION OF ACCESS TRACKS, BORROW PITS, BATTERY STORAGE, TEMPORARY CONSTRUCTION COMPOUND, ON-SITE SUBSTATION AND ASSOCIATED INFRASTRUCTURE

    Decided 12 May 2023 Full applications

Timeline

Dates from the published record

  1. 1 Aug 2022

    Received by Dumfries and Galloway

  2. 5 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 20 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 September 2022, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dumfries and Galloway took a median of 49 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Dumfries and Galloway for determination, against a statutory target of eight weeks. Over the last year Dumfries and Galloway's median decision took 49 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Dumfries and Galloway's portal will say. Our guide explains the common types.