Planning application
Goshall Valley East Street Ash Kent
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Core documents for appeal (Construction of a solar farm with associated access and infrastructure)
As published by the council, reference 23/01363/A
Application record
- Reference
- 23/01363/A
- Status
- Awaiting decision
- Received
- 10 Aug 2026
- Validated
- 10 Aug 2026
- Ward
- Little Stour And Ashstone
- Parish
- ASH
Timeline
Dates from the published record
-
10 Aug 2026
Received by Dover
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Dover took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Appeal: 26/00031/S78 (Appeal In Progress)
Documents
Plans, drawings, consultee responses and the officer's report
482 documents on file for this application
- HISTORIC LANDSCAPE CHARACTERISATION
- THEME 6 THE CHURCH
- ACADEMIC EXPERT REPRESENTATION
- REP STATEMENT FROM CPRE KENT
- MR_JOHN_MARTIN-
- DDC LANDSCAPE-CHARACTER-ASSESSMENT
- ASH-NDP-PLAN-FINAL-SEPT-2021.
- SAVE-ASH-LEVEL-PLANNING-INSPECTORATE-FINAL-SUBMISSION-11-05-2026
- ACADEMIC EXPERT REPRESENTATION.
- SOLAR-PANELS-AND-WILDLIFE-REVIEW-2019
- HOW TO DISGUISE EVOLUTIONARY TRAPS CREATED BY SOLAR PANELS
- REP BIOREPLICATED COATINGS FOR PHOTOVOLTAIC SOLAR PANELS (FRITZ ET AL)
- REP BMV_FARMERS_LETTER FINAL_REDACTED.
- GOSHALL VALLEY_SEDGES_LETTER_TO_PLANNING_INSPECTORATE.
- APPEAL INTERESTED PARTY COMMENTS
- APPELLANTS PLANNING PROOF OF EVIDENCE
- APPELLANTS HERITAGE PROOF OF EVIDENCE
- APPELLANTS LANDSCAPE PROOF OF EVIDENCE
- APPELLANTS RENEWABLE ENERGY NEED PROOF OF EVIDENCE
- LPA PLANNING PROOF OF EVIDENCE
- LPA PLANNING PROOF OF EVIDENCE
- LPA PLANNING PROOF OF EVIDENCE
- LPA PLANNING PROOF OF EVIDENCE
- LPA HERITAGE PROOF OF EVIDENCE
- LPA HERITAGE PROOF OF EVIDENCE
- LPA HERITAGE PROOF OF EVIDENCE
- LPA HERITAGE PROOF OF EVIDENCE
- LPA HERITAGE PROOF OF EVIDENCE
- LPA LANDSCAPE PROOF OF EVIDENCE
- AUTHORITY-MONITORING-REPORT-2024-25
- NATIONAL_PLANNING_POLICY_FRAMEWORK
- LOCAL_FLOOD_AUTHORITY-2738738
- ENVIRONMENT_AGENCY-2738205
- P25-0719_EN_02B LANDSCAPE STRATEGY PLAN
- SCUKX-LISOU-000-PVL-100T (20260805) PV LAYOUT_PLANNING
- RESEARCH REPORT_SAL_VOL_XXIII_FIFTH_REPORT_ROMAN_FORT_RICHBOROUGH 1
- ARCHAEOLOGY-AND-SOLAR-FARMS-GPG---FINAL-2026-04-14
- FENCE ELEVATION
- INTERNAL TRACK SECTION DETAIL
- INTERNAL TRACK SECTION DETAIL
- HGV MAIN BUILDING ELEVATION
- HGV MAIN BUILDING PLAN
- MONITORING CABIN
- ES NON-TECHNICAL SUMMARY
- APPENDIX 10.1 BUILT HERITAGE TECHNICAL APPENDIX
- APPENDIX 9.3 ABSTRACTIONS WITHIN 2KM OF THE SITE
- APPENDIX 9.3 9.2 HYDROLOGICAL WALKOVER SURVEY RECORD
- APPENDIX 9.1 FRA PART 9 OF 9
- APPENDIX 9.1 FRA PART 8 OF 9
- APPENDIX 9.1 FRA PART 7 OF 9
- APPENDIX 9.1 FRA PART 6 OF 9
- APPENDIX 9.1 FRA PART 5 OF 9
- APPENDIX 9.1 FRA PART 4 OF 9
- APPENDIX 9.1 FRA PART 3 OF 9
- APPENDIX 9.1 FRA PART 2 OF 9
- APPENDIX 9.1 FRA PART 1 OF 9
- APPENDIX 8.2 BIODIVERSITY NET GAIN STRATEGY
- APPENDIX 8.1 ECOLOGY BASELINE REPORT
- APPENDIX 7.6 VISUAL EFFECTS TABLE
- APPENDIX 7.5 LANDSCAPE EFFECTS TABLE
- APPENDIX 7.4 VERIFIED VIEWS AND METHODOLOGY
- APPENDIX 7.3 SITE CONTEXT PHOTOGRAPHS
- APPENDIX 7.2 SITE APPRAISAL PHOTOS
- APPENDIX 7.1 LVIA METHODOLOGY
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 7 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 6 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 5 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 4 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 3 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 2 OF 7
- APPENDIX 6.2 ARCHAEOLOGICAL IMPACT ASSESSMENT PART 1 OF 7
- APPENDIX 6.1 WSI
- APPENDIX 2.2 EIA SCOPING OPINION
- APPENDIX 2.2 EIA SCOPING OPINION
- APPENDIX 1.2 STATEMENT OF EXPERTISE
- APPENDIX 1.1 LOCATION OF INFORMATION (SCHEDULE 4 EIA REGS)
- ES VOL 2 TECHNICAL APPENDICES CONTENTS
- FIGURE 8.1 SITE LOCATION AND DESIGNATED SITES PLAN
- FIGURE 7.8 LANDSCAPE SECTIONS
- FIGURE 7.7 LANDSCAPE STRATEGY PLAN
- FIGURE 7.6 LANDSCAPE OPPORTUNITES AND CONSTRAINTS PLAN
- FIGURE 7.5 VISUAL APPRAISAL PLAN AND ZTV
- FIGURE 7.4 LANDSCAPE CHARACTER PLAN
- FIGURE 7.3 TOPOGRAPHY PLAN
- FIGURE 7.2 SITE APPRAISAL PLAN
- FIGURE 7.1 SITE CONTEXT PLAN
- FIGURE 3.2 LAND USE PARAMETER PLAN
- ES FIGURE 3.1 SITE LAYOUT PLAN
- ES FIGURE 3.1 SITE LAYOUT PLAN
- FIGURE 2.1 CUMULATIVE SCHEMES
- FIGURE 1.1 SITE BOUNDARY
- CHAPTER 11 SUMMARY AND RESIDUAL EFFECTS
- CHAPTER 10 BUILT HERITAGE
- CHAPTER 9 WATER ENVIRONMENT
- CHAPTER 8 BIODIVERSITY
- CHAPTER 7 LANDSCAPE AND VIEWS
- CHAPTER 6 ARCHAEOLOGY
- CHAPTER 5 CONSTRUCTION METHODOLOGY AND PROGRAMME
- CHAPTER 4 ALTERNATIVES AND DESIGN EVOLUTION
- CHAPTER 3 THE SITE AND DEVELOPMENT DESCRIPTION
- CHAPTER 2 EIA METHODOLOGY
- CHAPTER 1 INTRODUCTION
- ES VOL 1 MAIN TEXT AND FIGURES CONTENTS
- BNG METRIC
- TRANSPORT STATEMENT
- MONITORING CABIN
- SCI
- OUTLINE CEMP
- NOISE ASSESSMENT REPORT
- REPORT TO INFORM APPROPRIATE ASSESSMENT (RIAA)
- GLINT AND GLARE PART 2 OF 2
- GLINT AND GLARE PART 1 OF 2
- GEOPHYSICAL REPORT PART 5 OF 5
- GEOPHYSICAL REPORT PART 4 OF 5
- GEOPHYSICAL REPORT PART 3 OF 5
- GEOPHYSICAL REPORT PART 2 OF 5
- GEOPHYSICAL REPORT PART 1 OF 5
- ALQ AND LAND-USE CONSIDERATONS PART 6 OF 6
- ALQ AND LAND-USE CONSIDERATONS PART 5 OF 6
- ALQ AND LAND-USE CONSIDERATONS PART 4 OF 6
- ALQ AND LAND-USE CONSIDERATONS PART 3 OF 6
- ALQ AND LAND-USE CONSIDERATONS PART 2 OF 6
- ALQ AND LAND-USE CONSIDERATONS PART 1 OF 6
- ALC REPORT
- TREE SURVEY AND AIA
- FRA PART 9 OF 9
- FRA PART 8 OF 9
- FRA PART 7 OF 9
- FRA PART 6 OF 9
- FRA PART 5 OF 9
- FRA PART 4 OF 9
- FRA PART 3 OF 9
- FRA PART 2 OF 9
- FRA PART 1 OF 9
- COVER LETTER
- PLANNING & DESIGN & ACCESS STATEMENT
- SITE LAYOUT PLAN
- EDGE OF PARK SWITCHGEAR STATION
- TRANSFORMER STATION
- CCTV ELEVATION
- FRAMEWORK ELEVATION - BALLAST
- FRAMEWORK ELEVATION
- GATE ELEVATION
- FENCE ELEVATION - SWALE CROSSING
- FENCE ELEVATION - SWALE CROSSING
- APPLICATION FORM
- SEQUENTIAL TEST REPORT - FLOOD RISK
- BIODIVERSITY METRIC 4.0
- ECOLOGY RESPONSE TO SENIOR NATURAL ENVIRONMENT OFFICER
- TECHNICAL RESPONSE ON ALC ACCURACY
- NON-TECHNICAL RESPONSE ALC ACCURACY
- COVER LETTER DATED 12032025
- LAND USE PARAMETER PLAN WITH DISTANCES
- LETTER RE DISTANCES 04032024
- ES FIGURE 7.7 LANDSCAPE STRATEGY PLAN
- PRINTED MINUTES 27112025 1800 PLANNING COMMITTEE (1)
- DECISION NOTICE (DATED 01.12.25)
- COMMITTEE TRANSCRIPT
- OFFICER REPORT
- DRAFT LEGAL AGREEMENT
- P25-0719 LETTER TO DCC - EIA CUMULAITVE NOV 2025
- SUPPLEMENTARY ASSESSMENT OF NEW WATERCOURSE CROSSINGS-ISSUED 1.1
- P25_0719_EN_01A CUMULATIVE SITES
- P25-0719 LETTER TO DCC - EIA INFORMATION 30.09.2025
- RESPONSE FROM BSG ECOLOGY TO DDC CONSULTATION-ISSUED 1.5
- ARCHAEOLOGICAL EVALUATION REPORT
- EIA NON-TECHNICAL SUMMARY ADDENDUM.
- APPENDIX 9.1A FRA AND DRAINAGE STRATEGY (PART 2 OF 2)_LR
- APPENDIX 9.1A FRA AND DRAINAGE STRATEGY (PART 1 OF 2)
- APPENDIX 8.2A BIODIVERSITY NET GAIN STRATEGY
- APPENDIX 7.7A VISUAL EFFECTS TABLE
- APPENDIX 7.6A LANDSCAPE EFFECTS TABLE
- APPENDIX 7.5A PHOTOMONTAGES AND METHODOLOGY WINTER VIEWPOINTS (PART 2 OF 2)
- APPENDIX 7.5A PHOTOMONTAGES AND METHODOLOGY WINTER VIEWPOINTS (PART 1 OF 2)
- APPENDIX 7.4A PHOTOMONTAGES AND METHODOLOGY SUMMER VIEWPOINTS (PART1 OF 2)
- APPENDIX 7.4A PHOTOMONTAGES AND METHODOLOGY SUMMER VIEWPOINTS (PART2 OF 2)
- APPENDIX 7.3A SITE CONTEXT PHOTOGRAPHS
- APPENDIX 7.2A SITE APPRAISAL PHOTOGRAPHS
- APPENDIX 7.1A LVIA METHODOLOGY
- APPENDIX 6.6A ARCHAEOLOGY ES ADDENDUM CHAPTER (TRACKED CHANGES).
- APPENDIX 6.5A INTERIM ARCHAEOLOGICAL EVALUATION REPORT
- GEOPHYSICAL REPORT
- APPENDIX 6.3A GEOPHYSICAL SURVEY (MAGNETOMETRY) PART 5 OF 5
- APPENDIX 6.3A GEOPHYSICAL SURVEY (MAGNETOMETRY) PART 4 OF 5
- APPENDIX 6.3A GEOPHYSICAL SURVEY (MAGNETOMETRY) PART 3 OF 5
- APPENDIX 6.3A GEOPHYSICAL SURVEY (MAGNETOMETRY) PART 2 OF 5
- APPENDIX 6.3A GEOPHYSICAL SURVEY (MAGNETOMETRY) PART 1 OF 5
- FIGURE 7.8A LANDSCAPE SECTIONS
- FIGURE 7.7A LANDSCAPE STRATEGY PLAN
- FIGURE 7.6A LANDSCAPE OPPORTUNITIES AND CONSTRAINTS PLAN
- FIGURE 7.5A ZONE OF THEORETICAL VISIBILITY (ZTV) AND PHOTO LOCATIONS
- FIGURE 7.4A LANDSCAPE CHARACTER PLAN
- FIGURE 7.3A TOPOGRAPHY PLAN
- FIGURE 7.2A SITE APPRAISALS PLAN
- FIGURE 7.1A SITE CONTEXT PLAN
- FIGURE 3.2A LAND USE PARAMETER PLAN
- FIGURE 3.1A GENERAL PV LAYOUT PLAN
- CHAPTER 11A SUMMARY AND RESIDUAL EFFECTS
- CHAPTER 10A BUILT ENVIRONMENT (ABOVE GROUND)
- CHAPTER 9A WATER ENVIRONMENT
- CHAPTER 8A BIODIVERSITY
- CHAPTER 7A LANDSCAPE AND VIEWS
- CHAPTER 6A ARCHAEOLOGY
- CHAPTER 4A ALTERNATIVES AND DESIGN EVOLUTION
- CHAPTER 3A SITE AND DEVELOPMENT DESCRIPTION
- ENVIRONMENTAL STATEMENT ADDENDUM CONTENTS AND PREAMBLE
- RESPONSE DOCUMENT
- COMMUNITY ACCESS STRATEGY
- HERITAGE RESPONSE
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- OUTLINE LANDSCAPE ECOLOGICAL MANAGEMENT PLAN
- PUBLIC BENEFITS STATEMENT
- ASH PARISH COUNCIL (28.10.25)
- ASH PARISH COUNCIL (29.07.25)
- ASH PARISH COUNCIL 22.04.25
- ASH PARISH COUNCIL (2) 13.02.24
- ASH PARISH COUNCIL (1) 13.02.24
- ARCHAEOLOGICAL OFFICER ADDITIONAL COMMENTS (PEAT) 09.07.25
- 3.8C ARCHAEOLOGICAL OFFICER EMAIL 09.07.25
- ARCHAEOLOGICAL OFFICER 17.04.25
- ARCHAEOLOGICAL OFFICER 08.02.24
- ENVIRONMENT AGENCY 20.03.25
- ENVIRONMENT AGENCY 02.02.24
- DDC HERITAGE TEAM (11.04.25)
- DDC HERITAGE TEAM 02.02.24
- WOODNESBOROUGH PARISH COUNCIL 08.04.25
- WOODNESBOROUGH PARISH COUNCIL 24.01.24
- SANDWICH TOWN COUNCIL 12.01.24
- KCC HIGHWAYS 28.04.25
- KCC HIGHWAYS 03.01.24
- NATIONAL HIGHWAYS 28.03.25
- NATIONAL HIGHWAYS RESPONSE 27.12.23
- NATIONAL HIGHWAYS COVER EMAIL 27.12.23
- FOI CORRESPONDENCE KCC AND HE (JUNE - JULY 2025)
- FOI CORRESPONDENCE HE (3RD APRIL 2025).
- EIR CORRESPONDENCE PART 9
- EIR CORRESPONDENCE PART 8
- EIR CORRESPONDENCE PART 7
- EIR CORRESPONDENCE PART 6
- EIR CORRESPONDENCE PART 5
- EIR CORRESPONDENCE PART 4
- EIR CORRESPONDENCE PART 3
- EIR CORRESPONDENCE PART 2
- EIR CORRESPONDENCE PART 1
- ENVIRONMENTAL HEALTH 18.12.23
- ENVIRONMENTAL HEALTH 07.12.23
- PRESTON PARISH COUNCIL (15.02.24)
- STAPLE PARISH COUNCIL (DATED 12.01.24)
- TREE AND HORTICULTURAL OFFICER (DATED 10.09.25)
- KCC PUBLIC RIGHTS OF WAY AND ACCESS SERVICE (06.08.25)
- KCC PUBLIC RIGHTS OF WAY AND ACCESS SERVICE (2) 25.04.25
- KCC PUBLIC RIGHTS OF WAY AND ACCESS SERVICE (1) 25.04.25
- KENT WILDLIFE TRUST 04.04.25
- HISTORIC ENGLAND 03.07.25
- HISTORIC ENGLAND 02.05.25
- HISTORIC ENGLAND 08.03.24
- LOCAL FLOOD AUTHORITY 24.04.25
- LEAD LOCAL FLOOD AUTHORITY 26.02.24
- THE RIVER STOUR (KENT) IDB (DATED 21.05.25)
- THE RIVER STOUR (KENT) IDB 23.02.24
- NATURAL ENGLAND (3) 09.04.25
- NATURAL ENGLAND (2) 15.02.24
- NATURAL ENGLAND (1) 15.02.24
- SENIOR NATURAL ENVIRONMENTAL OFFICER (DATED 07.10.25)
- SENIOR NATURAL ENVIRONMENTAL OFFICER (DATED 05.09.25)
- SENIOR NATURAL ENVIRONMENTAL OFFICER 01.07.25
- SENIOR NATURAL ENVIRONMENT OFFICER 10.09.24
- BUGLIFE (13.02.24)
- KENT WILDLIFE TRUST (21.02.24)
- ENGLISH HERITAGE 14.02.24
- ASH HERITAGE GROUP (19.02.24)
- DOVER ARCHAEOLOGICAL GROUP (01.02.24)
- KENT ARCHAEOLOGICAL SOCIETY (06.02.24)
- COUNCIL FOR BRITISH ARCHAEOLOGY SOUTH EAST (07.02.24)
- COUNCIL FOR BRITISH ARCHAEOLOGY 14.05.25
- COUNCIL FOR BRITISH ARCHAEOLOGY (02.02.24)
- CLLR SYLVIA LAIDLOW-PETERSON (25.11.25)
- KENNEDY CONSULTING AGRICULTURAL USE AND LAND GRADING REPORT
- IAIN KENNEDY (EMAIL DATED 26.09.24)
- CLLR KEVIN PRESSLAND 17.04.24
- CLLR PETER FINDLEY 07.04.24
- CLLR REBECCA WING 19.02.24
- CLLR ANDREW SADLER 14.02.24
- CLLR PATRICK BARTOLO 12.02.24
- CLLR PAUL CARTER 16.01.24
- CLLR ROGER LOUKES 15.01.24
- CLLR PHILIP WOODHOUSE 15.01.24
- ROMAN ROADS RESEARCH ASSOCIATION (REPORT FEB 2024)
- ROMAN ROADS RESEARCH ASSOCIATION (EMAIL 19.02.24)
- CLLR PETER BREEN 12.01.24
- LORD MACKINLAY OF RICHBOROUGH (23.04.25)
- SIR ROGER GALE MP (DATED 20.02.24)
- CRAIG MACKINLAY MP (18.02.24)
- ASH WILDLIFE FRIENDLY VILLAGE (DATED 21.04.25)
- SANDWICH BAY BIRD OBSERVATORY TRUST (16.01.24)
- THANET DISTRICT CPRE
- CPRE KENT 14.04.25
- CPRE KENT (DATED MARCH 2023)
- CPRE KENT 14.02.24
- SAVE ASH LEVEL LETTER (DATED 04.11.25)
- SAVE ASH LEVEL APPENDIX
- SAVE ASH LEVEL SUPPORTING DOC 3
- SAVE ASH LEVEL SUPPORTING DOC 2
- SAVE ASH LEVEL SUPPORTING DOC 1
- SAVE ASH LEVEL EMAIL (DATED 23.10.25)
- PLANNING OBJECTION STATEMENT (SAL) (JUNE 2025)
- TRANSPORT DESIGN REVIEW (SAL) (JUNE 2025)
- PLANNING OBJECTION STATEMENT (SAL) (FEB 2024)
- RSPB (20.02.24)
- UK PARLIAMENT DECLARATION
- CLIMATE CHANGE ACT TARGET AMENDMENT
- CLIMATE CHANGE ACT 2008
- NFU ACHIEVING-NET-ZERO-FARMING-S-2040-GOAL
- CCC PRESS RELEASE
- POWERING-UP-BRITAIN-ENERGY-SECURITY-PLAN
- ESTIMATING RENEWABLE GENERATION AND HOMES POWERED METHODOLOGY NOTE
- WRITTEN MINISTERIAL STATEMENT ON SOLAR ENERGY 25TH MARCH 2015
- PREDICTIVE ALC MAP FOR ENGLAND SCREENSHOTS
- NESO, CONNECTIONS REFORM WEBPAGE
- THE NERC ACT 2006 TABLE OF CONTENTS
- DECISIVE ACTION TO BREAK INFLUENCE OF GAS ON ELECTRICITY PRICES
- THE CROWN ESTATE OFFSHORE WIND LEASING ROUND 6
- THE CROWN ESTATE OFFSHORE WIND MAP
- STEP FUSION POTENTIAL TIMESCALES FOR DEVELOPMENT
- UNLOCKING-BENEFITS-OF-CLEAN-ENERGY-ECONOMY
- NESO ABOUT CONNECTIONS REFORM
- SOLAR_COSTS_2024-25
- NATIONAL POLICY STATEMENT FOR RENEWABLE ENERGY INFRASTRUCTURE EN-3
- MESSAGE_TO_PARTIES_AND_OBSERVERS_NDC_SYNTHESIS_REPORT_UPDATE
- ETYS 2024 APPENDIX A V1
- LOCAL DISTRIBUTION NETWORK MAP (33KV AND 132KV)
- REPD_PUBLICATION_Q1_2026
- REPD_PUBLICATION_Q4_2025
- SMMT - VEHICLE DATA
- 2005-24-UK-LOCAL-AUTHORITY-GHG-EMISSIONS
- 2005-23-UK-LOCAL-AUTHORITY-GHG-EMISSIONS
- RENEWABLE_ELECTRICITY_BY_LOCAL_AUTHORITY_2014_-_2024
- SUBNATIONAL_ELECTRICITY_CONSUMPTION_STATISTICS_2005-2024
- SUBNATIONAL_TOTAL_FINAL_CONSUMPTION_2005_2024
- SUBNATIONAL_TOTAL_FINAL_ENERGY_CONSUMPTION_200
- CONNECTIONS REFORM RESULTS _ NATIONAL ENERGY SYSTEM OPERATOR
- ESO LEADS THE WAY
- OVERARCHING NATIONAL POLICY STATEMENT FOR ENERGY EN-1 (2025)
- TAKING CHARGE THE ELECTRIC VEHICLE INFRASTRUCTURE STRATEGY
- UK HYDROGEN STRATEGY
- ELECTRICITY-GENERATION-COSTS-REPORT-2025
- SOLAR PHOTOVOLTAICS DEPLOYMENT JUNE 2026
- SOLAR_PHOTOVOLTAICS_DEPLOYMENT_DECEMBER_2025
- NPS REVISIONS 2025 CONSULTATION GOVERNMENT RESPONSE
- CCC ADVISES 81% REDUCTION IN EMISSIONS BY 2035
- THE SEVENTH CARBON BUDGET ? ADVICE FOR THE UK GOVERNMENT FEBRUARY 2025 (CCC).
- PROGRESS-IN-REDUCING-EMISSIONS-2026-REPORT-TO-PARLIAMENT
- PROGRESS-IN-REDUCING-EMISSIONS-2025-REPORT-TO-PARLIAMENT
- SOLAR ROADMAP - APPENDIX_2- CASE_STUDIES_AND_MISCONCEPTIONS
- APPENDIX 1 ACTION TABLE
- SOLAR ROADMAP-ANNEXES
- UK_SOLAR_ROADMAP_REPORT
- LAND USE CONSULTATION
- PLANNING PRACTICE GUIDANCE - RENEWABLE AND LOW CARBON ENERGY
- DECEMBER_2025_NPPF_CONSULTATION_DOCUMENT
- DRAFT_NPPF_DECEMBER_2025
- NPPF-DECEMBER-2024
- UK FOOD SECURITY REPORT 2024
- CLEAN POWER 2030 ACTION PLAN MAIN REPORT
- NESO CLEAN POWER 2030 REPORT
- DIGEST OF UK ENERGY STATISTICS 2025 CHAPTERS 1-7
- WMS SECRETARY OF STATE FOR ENERGY SECURITY AND NET ZERO 15.05.24
- CONNECTIONS ACTION PLAN NOVEMBER 2023
- UK CLIMATE CHANGE RISK ASSESSMENT JANUARY 2022
- FUTURE ENERGY SCENARIOS 2025 PATHWAYS TO NET ZERO V.5_0
- THE GOVERNMENT FOOD STRATEGY
- NCBPG-SOLAR-ENERGY-UK-REPORT-WEB
- PLANNING PRACTICE GUIDANCE - RENEWABLE AND LOW CARBON ENERGY
- COMPLETE KENT & MEDWAY LOCAL NATURE RECOVERY STRATEGY
- KENT-MINERALS-AND-WASTE-LOCAL-PLAN-2024-TO-2039
- COUNCIL RESCINDS CLIMATE CHANGE EMERGENCY DECLARATION
- KENT + MEDWAY ENERGY + LOW EMISSIONS STRATEGY IMPLEMENTATION PLAN ACTIONS
- KENT AND MEDWAY ENERGY AND LOW EMISSIONS STRATEGY (JUNE 2020)
- DDC'S ACTION PLAN
- CLIMATE CHANGE STRATEGY (JANUARY 2021)
- ASH NEIGHBOURHOOD PLAN 2018-2037 (SEPT 2021)
- DOVER-LP-INSPECTORS-REPORT-FINAL
- POLICY CC3 WORDING REG 19 SUBMISSION DOCUMENT
- DOVER-DISTRICT-LOCAL-PLAN-REGULATION-19-SUBMISSION-DOCUMENT-OCT-2022
- GREEN-INFRASTRUCTURE-STRATEGY-2024
- DOVER-DISTRICT-HERITAGE-STRATEGY
- NDP-CHARACTER-ASSESSMENT-OCT-2018-FINAL
- VOL2
- VOL1
- DOVER DISTRICT PLAN TO 2040 (ADOPTED OCTOBER 2024)
- LAND S OF LEEMING SUBSTATION APPEAL DECISION
- MUSSENDEN LANE APPEAL DECISION
- BURCOT APPEAL DECISION
- CAUDWELL APPEAL DECISION
- PALMER
- MORDUE
- FORGE FIELDS
- LONDON HISTORIC PARKS AND GARDENS TRUST
- KINSEY
- KAY
- NUON
- RUNWELL RD
- HOLLY LANE
- BRADMORE ROAD
- CATESBY ESTATES AND SSCLG V STEER JUDGMENT COA
- COBHAM
- HONILEY_ROAD
- GREAT WHEATLEY FARM
- GRAVELEY_LANE
- HALL LANE
- THAXTED
- STEERAWAY
- CHELMSFORD APPEAL DECISION
- MINCHENS LANE
- BISHOP'S ITCHINGTON
- BARNWELL
- THE LANDSCAPE ASSESSMENT OF KENT (OCTOBER 2004)
- NATIONAL CHARACTER AREA 113 NORTH KENT PLAIN
- AN APPROACH TO LANDSCAPE CHARACTER ASSESSMENT (OCTOBER 2014) NATURAL ENGLAND
- AN APPROACH TO LANDSCAPE SENSITIVITY ASSESSMENT (2019) NATURAL ENGLAND
- TECHNICAL GUIDANCE NOTE 02-19 'RESIDENTIAL VISUAL AMENITY ASSESSMENT?
- TECHNICAL GUIDANCE NOTE (TGN) 06-19 VISUAL REPRESENTATION OF DEVELOPMENT PROPOSA
- TECHNICAL GUIDANCE NOTE (TGN) 02-21 ASSESSING LANDSCAPE VALUE OUTSIDE NATIONAL D
- TECHNICAL GUIDANCE NOTE (TGN) 2024-01-GLVIA3-NC_AUG-2024
- NATURAL ENGLAND ? NATIONAL CHARACTER AREA PROFILES
- THANET LCA
- DOVER DISTRICT COUNCIL LANDSCAPE CHARACTER ASSESSMENT (OCTOBER 2020)
- GUIDELINES FOR LANDSCAPE AND VISUAL IMPACT ASSESSMENT (3RD EDITION, 2013) GLVIA
- MARGETTS, A ET AL (2024) THE SOUTHERN EXTENT OF THE LATE ROMAN SETTLEMENT OF RUT
- HISTORIC ENGLAND RESEARCH - ISSUE 16
- HICKS 1998 EXCAVATIONS AT EACH END ASH
- JOURNAL OF THE ROMAN ROADS RESRARCH ASSOCIATION
- HEAG279 STATEMENTS OF HERITAGE SIGNIFICANCE
- CONSERVATION_PRINCIPLES_POLICIES_AND_GUIDANCE_APRIL08_WEB
- HEAG180 GPA3 THE SETTING OF HERITAGE ASSETS
- GPA 2 - MANAGING SIGNIFICANCE IN DECISION-TAKING IN THE HISTORIC ENVIRONMENT
- HEAG302 DELIVERING CLEAN POWER
- R&R ENGLISH HERITAGE GUIDE P43-END
- R&R ENGLISH HERITAGE GUIDE P28-42
- R&R ENGLISH HERITAGE GUIDE P12-27
- R&R ENGLISH HERITAGE GUIDE P0-11
- RICHBOROUGH ENVIRONS REPORT
- PERKINS, 2007, THE LONG DEMISE OF THE WANTSUM CHANNEL
- HEAG302 COMMERCIAL RENEWABLE ENERGY DEVELOPMENT AND THE HISTORIC ENVIRONMENT
- R002V5 - STATEMENT OF COMMON GROUND DRAFT
- 23_01363 LPA STATEMENT OF CASE LANDSCAPE ADDENDUM.
- 23_01363-DDC_APPEAL_STATEMENT_-_APPENDIX_3-2716140
- 23_01363-DDC_APPEAL_STATEMENT_-_APPENDIX_2-2716139
- 23_01363-DDC_APPEAL_STATEMENT_-_APPENDIX_1-2716138
- 23_01363-DDC_APPEAL_STATEMENT-2716137
- R001V5 STATEMENT OF CASE 11.03.26
- CONNECTIONS REFORM LETTER
- P25-0719_EN_02 LANDSCAPE STRATEGY PLAN
- 2425-7 LITTLE SOUTH GOSHALL KENT GEOARCHAEOLOGICAL DBA V3
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_73 PT2
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_165 PT13
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT12
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT11
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT10
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT9
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT8
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT7
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT6
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT5
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT4
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT3
- 0001 BM12841 LITTLE SOUTH SOLAR FARM FRA AND DS V6 COMPLETE_162 PT1
- MAIL DATED 02.07.26
- SCUKX-LISOU-000-PVL-100T (20260224) PV LAYOUT_PLANNING (2)
- SCUKX-LISOU-000-MCS-219 (20260507) SPARES CONTAINER ELEVATION (2)
- SCUKX-LISOU-000-MCS-240 (20260507) WEATHER STATION ELEVATION
- UKP-OHL-UKPN-RICH-002_P01
- 23-01363 GOSHALL VALLEY EAST STREET ASH - LANDSCAPE STATEMENT OF COMMON GROUND
- 11B 23-01363 GOSHALL VALLEY EAST STREET ASH - STATEMENT OF COMMON GROUND - APPEN
- 23-01363 GOSHALL VALLEY EAST STREET ASH - STATEMENT OF COMMON GROUND
- DRAFT SOCG HERITAGE 26.02.26
- APPEAL FORM
- PROJECT LIST
- PROJECT LIST
- MONTHLY_PUBLIC_EV_CHARGERS_BY_REGION_AND_COUNTRY_UK
- ELECTRIC-VEHICLE-PUBLIC-CHARGING-DEVICES-FEBRUARY-2026
- VEH0141
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Dover for determination, against a statutory target of eight weeks. Over the last year Dover's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Dover's portal will say. Our guide explains the common types.