Skip to content
PlanIndex Get alerts
Menu

Planning application

Ridgeway Farm Lanchards Lane Shillingstone DT11 0TF

Awaiting decision Dorset P/FUL/2026/03928 Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect an indoor arena with lean to barn. Erect horse walker and all-weather turnout pens. Carry out all associated works.

As published by the council, reference P/FUL/2026/03928

Application record

Reference
P/FUL/2026/03928
Type
Full Planning Application
Status
Out To Consultation
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Blackmore Vale Ward
Parish
Shillingstone
Postcode
DT11 0TF

Timeline

Dates from the published record

  1. 21 Aug 2026

    Received by Dorset

  2. 4 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dorset took a median of 37 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • New Agricultural Workers Dwelling At Ridgeway Farm, Temporary Living Accommodation Lanchards Lane Shillingstone DT11 0TF

    P/VOC/2026/01139 Submitted 4 Mar 2026 48m away

    Erection of 1no. permanent rural workers dwelling incorporating an ancillary annex & associated works. Temporary residential use of part of the existing barn for an essential rural worker (retrospective) (with variation of condition 3 of planning permission P/FUL/2021/02764 to amend the wording of the condition)

    Granted Amendments 4 docs
    Domestic
  • Ridgeway Farm Lanchards Lane Shillingstone Blandford Forum DT11 0TF

    P/CLE/2026/00957 Submitted 5 Mar 2026 59m away

    Certificate of lawfulness to confirm the addition of windows & change of internal layout to existing barn is lawful relating to planning permission P/FUL/2021/02764 - Erection of 1no. permanent rural workers dwelling incorporating an ancillary annex & associated works. Temporary residential use of part of the existing barn for an essential rural worker (retrospective)

    Granted Lawful development Windows or glazing 7 docs
    Domestic
  • Lime Kiln House Lanchards Lane Shillingstone DT11 0TF

    P/PABA2/2026/02574 Submitted 4 Aug 2026 404m away

    87% historically approved · decision due ~29 Sep

    Erect single storey forestry barn

    Awaiting decision Prior approval 14 docs
    Small domestic
  • Lime Kiln House Lanchards Lane Shillingstone DT11 0TF

    P/PABA/2026/02156 Submitted 17 Apr 2026 404m away

    Erect single storey forestry barn

    Granted Prior approval 7 docs
    Small domestic

In Dorset

  • P/FUL/2026/04686 Awaiting decision

    Hut 5 Field 768 Access Track To Fields 758 And 766 To 769 Portland Bill Portland

    Dismantle existing structure and replace with timber clad hut

    2 Sep 2026 Full applications
  • P/FUL/2026/04184 Awaiting decision

    Crumpets Farm Crumpets Farm Drive Lytchett Matravers BH16 6AL

    Partial change of use of site to form area for 2 No. short term holiday let pods and access to highway

    1 Sep 2026 Full applications
  • 15 Regents Court Victoria Road Swanage BH19 1LY

    Erect block of garages, with 5 individual garage spaces

    7 Jul 2026 Full applications
  • Unit D Link Estate Blackhill Road Holton Heath Trading Park Holton Heath BH16 6LS

    Demolish existing office building and use land as open air commercial storage, plus installation of 2.0 metre high palisade fencing

    3 Mar 2026 Full applications
  • P/FUL/2026/04684 Awaiting decision

    23 Gorse Lane Upton BH16 5RR

    Installation of outdoor air conditioning unit

    1 Sep 2026 Full applications