Planning application
P/FUL/2026/03190
38 East Street Wimborne Minster BH21 1DX
Proposal
Remove existing stretched tent canopy and lean-to timber gazebo. Erect oak framed open sided gazebo with tiled roof and brick chimney including double sided open fire place. Replacement of 2no ground floor windows on the East Elevation and increase size of aperture to accommodate a timber framed bi fold door. External alterations to terrace
As published by the council, reference P/FUL/2026/03190
Timeline
Dates from the published record
-
8 Jul 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/LBC/2026/03191 Awaiting decision
38 East Street Wimborne Minster BH21 1DX
Remove existing stretched tent canopy and lean-to timber gazebo. Erect oak framed open sided gazebo with tiled roof and brick chimney including double sided open fire place. Replacement of 2no ground floor windows on the east elevation and increase size of aperture to accommodate a timber framed bi fold door. External alterations to terrace
-
P/ADV/2025/05931 Refused
Fisks Estate Agents 12 East Street Wimborne Minster BH21 1DS
Replacement fascia sign for Fisks Estate Agents on southern elevation, extended over building corner onto eastern elevation. Swing sign with metal bracket on southern elevation.
-
P/TRD/2023/01667 Granted
Deans Court Deans Court Lane Wimborne Minster BH21 1EE
Unstable Scarlet Oak - Fell.
-
P/FUL/2022/06936 Granted
Units 4-6 Crown Mead Wimborne Minster BH21 1ED
Installation of 9no. outdoor AC condensing units to rear service yard.
-
P/TRT/2025/05276 Granted
Deans Court Deans Court Lane Wimborne Minster BH21 1EE
Willow (on riverbank (Allen) overhanging the stone bridge): Fell to ground level.
-
P/TRC/2025/04970 Granted
19 Leigh Road Wimborne Minster BH21 1AB
Ash: Height reduction no more than 2 metres. Remove low branches approximately 6ft (1.8m) from ground level overhanging 21 Leigh Road.
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.