Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2026/02875

Forest Edge Holiday Park Boundary Lane Ringwood BH24 2SD

Awaiting decision Dorset Full Planning Application

Proposal

Change of use of the land from a caravan site for the siting of 96 static caravans for date-restricted holiday occupancy, to a caravan site for the siting of 93 static caravans for permanent occupancy and associated operational development works.

As published by the council, reference P/FUL/2026/02875

Timeline

Dates from the published record

  1. 1 Jun 2026

    Received by Dorset

  2. 31 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Hendy Car Store A31 (T) - Ringwood Road St Leonards And St Ives BH24 2SD

    Erect 1 non illuminated wall mounted fascia sign & 2 non illuminated fascia signs

    7 Nov 2025 164m away Advertising
  • P/FUL/2025/06479 Awaiting decision

    Caravan 223 Ringwood Road St Leonards And St Ives BH24 2SD

    Erect single dwelling to replace existing mobile home.

    12 Nov 2025 253m away Full applications
  • 23 Boundary Lane St Leonards and St Ives Ringwood BH24 2SE

    Fell 1x unstable pine adjacent to uprooted tree.

    22 Jun 2026 338m away Trees
  • 28 Boundary Lane St Leonards And St Ives BH24 2SE

    Proposed erection of combined garage, domestic workshop and garden utility area, single storey dual pitched building, taking down of the existing prefabricated garage structure on land to the side of private dwellinghouse with the existing gravel drive, parking and access area expanded. The proposed building storm water to discharge into new soakaway as depicted on the submitted site plan.

    3 Dec 2025 401m away Lawful development

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications