Planning application
P/FUL/2026/02578
55 Haviland Road Ferndown Industrial Estate Ferndown BH21 7PY
Proposal
Retrospective installation of new extraction unit and exhaust flue stack to factory wall with a concrete base for the plant equipment, to replace old unit. The replacement unit and stack will serve the existing factory operations. (Amended description)
As published by the council, reference P/FUL/2026/02578
Timeline
Dates from the published record
-
15 Jun 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/FUL/2024/04585 Granted
Unit 17 Bedrock Park Vulcan Way Ferndown Industrial Estate Dorset BH21 7PT
Change of use from Class B1(c) (now Class E) and Class B8 use to Ambulance Service operating base (a Sui Generis use) and associated works including the provision of a bin store, fuel station, and wash down facilities, and new external condensers.
-
P/FUL/2025/06283 Granted
17 Whittle Road Ferndown BH21 7RL
Change of use of part of the premises to employment use (E (g) (ii) (iii), B2 and B8), with ancillary office trade counter and welfare facilities.
-
P/CLP/2025/05647 Granted
22 Cobham Road Ferndown Industrial Estate Ferndown BH21 7PW
Erection of new load bank installation (Schedule 2, Part 7, Class I of the GPDO)
-
P/FUL/2025/06706 Granted
7 Lancaster Road Ferndown Industrial Estate Ferndown BH21 7SQ
Erect a canopy/shelter to front of reception building. Erect a 2m high Anti climb green mesh fencing to enclose the front side of site and a security barrier and gates across the main entrance.
-
P/HOU/2026/03438 Awaiting decision
2 Red Oaks Close Ferndown BH22 9TY
Raise roof ridge height, form dormers to allow conversion to accommodation with Juliet balcony
-
P/FUL/2025/07450 Granted
7 Cobham Road Ferndown Industrial Estate Ferndown BH21 7PE
Demolish front 3 storey element and form recessed delivery area, and refurbish remaining building
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.