Planning application
P/FUL/2026/02376
Morden Rickyard Horse Pond Lane East Morden
Proposal
Change of use of the barn to form one dwelling, demolition of modern open barn and enclosed building, erection of a garage and summer house
As published by the council, reference P/FUL/2026/02376
Timeline
Dates from the published record
-
5 Jun 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/LBC/2026/02375 Awaiting decision
Morden Rickyard Horse Pond Lane East Morden
Change of use of the barn to form one dwelling, demolition of modern open barn and enclosed building, erection of a garage and summer house
-
P/HOU/2026/01826 Granted
70 Horse Pond Lane East Morden BH20 7DP
Conversion of store to garden room. Replacement windows. Proposed timber outbuilding.
-
P/HOU/2026/01716 Awaiting decision
76 Horse Pond Lane East Morden BH20 7DP
Demolition of buildings and removal of lawful mobile home, replace with studio space ancillary to the dwelling
-
P/TRC/2025/05800 Granted
The Glebe Higher Street East Morden BH20 7DS
T1 Leylandii - Fell.
-
P/TRC/2026/00211 Decided
Church Cottage Higher Street East Morden BH20 7DW
T5 English Ash - Reduce tertiary branches back to growth points to give two metre clearance to the English Oak on the East side of T5.
-
P/TRC/2025/06689 Decided
Church Cottage Higher Street East Morden BH20 7DW
T1 Ash: Crown lift to give three-meter clearance from the ground. T2 Ash: Fell codominant stem that overhangs the lawn area. T3 Ash: Fell codominant stem that overhangs the lawn area. T5 Ash: Fell codominant stem that overhangs the lawn area. T6 Ash: Fell stem that is growing laterally across trees 7 and 8. T7 Ash: Crown lift above play area to give 3-meter clearance from the ground. T8 Ash: Crown lift above play area to give 3-meter clearance from the ground. T9 Ash: Crown lift above play area to give 3-meter clearance from the ground.
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.