Planning application
P/FUL/2026/00770
Dudsbury Hill Fort Land South Of Christchurch Road West Parley
Proposal
Construction of an alternative access point with a dropped kerb
As published by the council, reference P/FUL/2026/00770
Timeline
Dates from the published record
-
13 Apr 2026
Received by Dorset
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/NMA/2024/06057 Granted
92 Dudsbury Road West Parley BH22 8RG
Non material amendment to minor relocation of bungalow to accommodate easement area required by South West Water; relocation of bin store to facilitate ease of collection, with hedging to soften appearance; change of separating fence design and increased height to 2m between 92 Dudsbury Road and the site to PA P/FUL/2024/01323 - divide plot and erect a dwelling, form access and associate parking
-
P/HOU/2026/03874 Awaiting decision
36 Linden Road West Parley BH22 8RR
Loft conversion with front and rear gable to form habitable accommodation
-
P/TRT/2025/04910 Refused
24 Linden Road West Parley BH22 8RR
T1 Oak: All-round 2 metre reduction. T2 Oak: All-round 2 metre reduction.
-
P/VOC/2025/06937 Granted
Castle Rings 176 Christchurch Road West Parley BH22 8SS
Replacement of existing cottage with new dwelling (with variation of Conditions 2, 3, 4, 5, 6 and 7 of Permission P/FUL/2023/03894 to vary the previously approved drawings/report and to remove conditions by submitting pre commencement information within this application.)
-
P/TRT/2024/05956 Refused
Castle Rings 176 Christchurch Road West Parley BH22 8SS
T1 Monterey Pine: Fell (with a conditioned replant of a half standard English Oak to be planted within 3m of the T1 location within the adjacent woodland). See report reference MH/CastleRings,ChristchurchRoad/Cond/7434 dated 11.10.2024)
-
P/HOU/2025/06574 Granted
176 Castle Rings Christchurch Road West Parley BH22 8SS
Demolition of existing garage and erect new garage building
Other full applications applications
In Dorset
-
P/FUL/2025/01842 Granted
Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG
Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access
-
P/FUL/2025/05287 Granted
The Barn Shepherds Hill Buckhorn Weston SP8 5HX
Erection of 1no. dwelling
-
P/FUL/2026/02163 Refused
Land off Netherhay Lane Drimpton Beaminster DT8 3FS
Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories
-
P/FUL/2026/03007 Granted
The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY
Change of use of studio over carport to short term let
-
P/FUL/2026/02840 Awaiting decision
Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ
Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.