Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2026/00175

Middle Mill Farm Colway Lane Lyme Regis DT7 3UB

Awaiting decision Dorset Full Planning Application

Proposal

Proposed use as a temporary construction compound associated with the upgrade works at Horn Bridge Sewage Pumping Station (SPS) and Uplyme Sewage Treatment Works. Proposed works to include provision of an office, meeting room and canteen, parking, toilet block and drying room, bunded Fuel Bowser, 3 skips and 2 No. storage containers. Bund and boundary fence around the perimeter of the compound. Proposed access gates, turning circle and plant and storage areas

As published by the council, reference P/FUL/2026/00175

Timeline

Dates from the published record

  1. 12 Jan 2026

    Received by Dorset

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Pumping Station Colway Lane Lyme Regis

    Request for EIA Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed construction of a new below ground storage tank

    12 Nov 2025 186m away Outline
  • The Larches Roman Road Lyme Regis DT7 3HA

    T1 & T2 Pine - Removal of major dead wood from both canopies combined with weight reduction via branch shortening by up to approximately 2500mm with cut diameters up to approximately 75mm T3 Sycamore - Reduce canopy extension over client land only via branch shortening by up to approximately 2000mm with cut diameters up to 50mm T4 Birch - Reduce canopy by up to approximately 1500mm with cut diameters up to 40mm

    21 Oct 2025 266m away Trees
  • Haye House Haye Lane Lyme Regis DT7 3NQ

    T1 Eucalyptus - Dismantle to near ground level

    19 Sep 2024 325m away Trees
  • Camellia House Colway Lane Lyme Regis DT7 3BG

    T1 Oak - Crown thin by 25% & remove deadwood - maintenance

    10 Feb 2023 328m away Trees
  • Uplyme Sewage Treatment Works DT7 3UA

    Request for EIA screening opinion in relation to new above ground storage tank

    7 Oct 2025 354m away Outline
  • Roman Road Footpath Haye Gardens Lyme Regis

    Hazel - Prune to 1.5m clear of garage block under Regulation 14 (S198)

    18 Sep 2025 435m away Trees

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications