Skip to content
PlanIndex Get alerts
Menu

Planning application

P/FUL/2025/06143

Watercombe House Access To Watercombe Farm Watercombe DT2 8HJ

Awaiting decision Dorset Full Planning Application

Proposal

Internal and External alterations to the Main house and Potting Shed. Change of use of The Stables to 2no holiday units and internal and external works including installation of flue, 2no air source heat pumps, new sewage treatment plant and car parking. Change of use to Stumble Inn to 1no holiday unit and internal and external works including proposed extension and installation of a flue

As published by the council, reference P/FUL/2025/06143

Timeline

Dates from the published record

  1. 17 Dec 2025

    Received by Dorset

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dorset for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P/LBC/2025/06142 Awaiting decision

    Watercombe House Access To Watercombe Farm Watercombe DT2 8HJ

    Internal and External alterations to include: Main house; Replacement porch roof; replacement guttering and fascia's; replacement windows; replacing external render with stone cladding. Potting shed - Replacement roof, door and window; lime render repairs. Stables - Change of use to 2no holiday units; installation of party wall; new windows, doors and 4no.rooflights; 2no new staircases, formation of door opening; installation of wood burning stove and flue; installation of slate vents in roof; underfloor heating; 2no air source heat pumps; new sewage treatment plant; creation of car parking. Stumble Inn - Change of use to 1 no holiday let; Extension; new cavity wall; green roof; reinstate blocked window; underfloor heating; replacement wood burning stove and flue; new chimney pot

    17 Dec 2025 0m away Heritage and listed buildings

In Dorset

  • Steepleton Manor Residential Home B3159 Junction A35T To Rew Manor Winterbourne Steepleton DT2 9LG

    Proposed change of use including alterations to form 14 residential flats with ancillary accommodation and communal facilities, new bin store, car parking and access

    7 May 2025 Full applications
  • The Barn Shepherds Hill Buckhorn Weston SP8 5HX

    Erection of 1no. dwelling

    22 Sep 2025 Full applications
  • Land off Netherhay Lane Drimpton Beaminster DT8 3FS

    Erect steel framed agricultural store 12.2m span x 23m long (5 No. 4.572m bays) x 4m to eaves to have a functional area for the storage of hay harvested from the surrounding field and dry storage for agricultural accessories

    27 Apr 2026 Full applications
  • The Loft Loxley House Great Down Lane Marnhull Sturminster Newton DT10 1JY

    Change of use of studio over carport to short term let

    3 Jun 2026 Full applications
  • P/FUL/2026/02840 Awaiting decision

    Land north of Avenue 50 Winfrith Nuclear Research Site Winfrith Newburgh Dorchester DT2 8WQ

    Land remediation works involving the excavation of a section of pipeline and refilling/reprofiling of the land together with associated temporary soil storage area and contractors’ compound.

    28 Jul 2026 Full applications