Planning application
North Farm Horton Dorset BH21 7HL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of Solar Farm and associated infrastructure
As published by the council, reference P/FUL/2023/02829
Application record
- Reference
- P/FUL/2023/02829
- Type
- Full Planning Application
- Status
- Application Approved
- Decision
- Granted
- Received
- 16 May 2023
- Validated
- 16 May 2023
- Decided
- 7 May 2025
- Ward
- Cranborne and Alderholt Ward
- Parish
- Horton
- Decision by
- Committee
- Postcode
- BH21 7HL
Timeline
Dates from the published record
-
16 May 2023
Received by Dorset
-
7 May 2025
Decision issued: Granted
-
3 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
P/FUL/2025/06819 Granted
Land between Woodlands Solar Farm, North Farm Solar Farm, and Mannington Substation
Proposed cable route in conjunction with approved solar farm developments (North Farm Solar Farm ref. P/FUL/2023/02829 and Woodlands Solar Farm ref. P/FUL/2023/03415) at Mannington, Horton.
-
P/ESC/2025/04777 Decided
North Solar Farm and Woodlands Solar Farm Mannington Horton
Environmental Impact Assessment Screening Opinion pursuant to Regulation 6 of the Town and County Planning (EIA) Regulations 2017 for a proposed cable route in conjunction with the approved solar farm developments known as North Farm Solar Farm (planning application reference P/FUL/2023/02829) and Woodlands Solar Farm (planning application reference P/FUL/2023/03415) at Mannington Farm, Horton
Documents
Plans, drawings, consultee responses and the officer's report
223 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Dorset granted permission on 7 May 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Little Haythorne Horton Road Church Hill Woodlands To Horton Lane Woodlands BH21 7JG
96% historically approved · decision due ~26 May
Retain garage
Awaiting decision Householder 11 docsDomestic -
Little Haythorne Horton Road Church Hill Woodlands To Horton Lane Woodlands BH21 7JG
Retain Garage
Refused Householder 11 docsDomestic
Other full applications
In Dorset
-
P/FUL/2026/04686 Awaiting decision
Hut 5 Field 768 Access Track To Fields 758 And 766 To 769 Portland Bill Portland
Dismantle existing structure and replace with timber clad hut
-
P/FUL/2026/04184 Awaiting decision
Crumpets Farm Crumpets Farm Drive Lytchett Matravers BH16 6AL
Partial change of use of site to form area for 2 No. short term holiday let pods and access to highway
-
P/FUL/2026/03213 Granted
15 Regents Court Victoria Road Swanage BH19 1LY
Erect block of garages, with 5 individual garage spaces
-
P/FUL/2026/01222 Granted
Unit D Link Estate Blackhill Road Holton Heath Trading Park Holton Heath BH16 6LS
Demolish existing office building and use land as open air commercial storage, plus installation of 2.0 metre high palisade fencing
-
P/FUL/2026/04684 Awaiting decision
23 Gorse Lane Upton BH16 5RR
Installation of outdoor air conditioning unit