Skip to content
PlanIndex Get alerts
Menu

Planning application

312 Balby Road Balby Doncaster DN4 0QF

Awaiting decision Doncaster 26/01430/FUL Full Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of ground floor from salon shop to takeaway including the addition of external flue/ extractor as well as replacement roller shutters and changes to the shop front.

As published by the council, reference 26/01430/FUL

Application record

Reference
26/01430/FUL
Type
Full Application
Status
Awaiting decision
Received
29 Jul 2026
Validated
18 Aug 2026
Ward
Hexthorpe And Balby North
Postcode
DN4 0QF

Comment by 10 September 2026

The council is taking comments on this application until then. Have your say on Doncaster's portal.

Timeline

Dates from the published record

  1. 29 Jul 2026

    Received by Doncaster

  2. 18 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Doncaster took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Doncaster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 High Road Balby Doncaster DN4 0PL

    18/02668/PD Submitted 22 Oct 2018 113m away

    90% historically approved · decision due ~17 Dec

    Change of use from residential property to beauty shop downstairs with flat upstairs.

    Awaiting decision Prior approval
  • Warehouse 24 High Road Balby Doncaster South Yorkshire DN4 0PL

    05/0957/P Submitted 1 Mar 2005 113m away

    Retention of use of premises for indoor car valeting/washing

    Granted Reserved matters
    Major scheme
  • 22, High Road, Balby, Doncaster, DN4 0PL

    03/6162/P Submitted 20 Oct 2003 113m away

    Change of use from residential dwelling to ground floor office with first floor residential accommodation.

    Granted Full applications
    Domestic
  • St Johns Group Practice Greenfield Lane Balby Doncaster DN4 0TH

    14/02874/TPO Submitted 5 Dec 2014 133m away

    Consent to remove to ground level and remove stumps by stump grinding eleven Lombardy Poplar trees (being subject to G1 of the Doncaster Borough Council Tree Preservation Order (No.110) Balby Health Centre 1993)

    Granted Trees 8 docs
  • 117 St Johns Road Balby Doncaster DN4 0QJ

    16/00802/FUL Submitted 15 Mar 2016 170m away

    Erection of two storey extension (including demolition of existing part two storey part single storey extension) to rear and conversion of dwelling to 2 flats

    Granted Full applications New dwelling Extension +1 10 docs
    Several homes
  • Lidl Sandford Road Balby Doncaster DN4 8DD

    20/00069/COND Submitted 9 Jan 2020 206m away

    Consent, agreement or approval required by conditions 4, 5 and 6 of planning application 19/01918/FUL

    Granted Conditions 4 docs

In Doncaster

  • 26/01054/FUL Granted

    Plumbs Estate Sandall Stones Road Kirk Sandall Doncaster DN3 1QR

    Erection of an office building

    1 Jun 2026 Full applications
  • 26/01211/FUL Granted

    65 - 67 Nether Hall Road Doncaster DN1 2QA

    Change of use from office to mixed-use retail/restaurant, changes to ground floor front windows and entrance doors and installation of extraction flue to rear of building.

    24 Jun 2026 Full applications
  • 26/00877/FUL Refused

    14 School Lane Auckley Doncaster DN9 3JR

    Conversion of existing outbuilding following partial demolition and erection of a side extension to form a 1 bedroom annex and change of use of outbuilding from office to form part of residential annex (Amended Plans and Description)

    8 May 2026 Full applications
  • 26/01006/FUL Granted

    Coney Garth High Street Barnby Dun Doncaster DN3 1DY

    Erection of a 2 storey side extension and dormers installed to rear and front of main roof of the property

    26 May 2026 Full applications
  • 25/01104/COU Granted

    Pavilion Town Field Thorne Road Doncaster DN1 2JS

    Change of use of part of the existing building from F2 ( Local Community Use Sports Facility) to include mixed use Class E(b) (Café/Restaurant) and Class E(c) Meeting Rooms.

    23 May 2025 Full applications