Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00690/LBCM

Melton Park Doncaster Road High Melton Doncaster DN5 7SZ

Awaiting decision Doncaster Listed Building Consent Major

Proposal

Listed building consent for internal and external works including demolition to enable the conversion of High Melton Hall to residential use and repair of the curtilage listed ha-ha.

As published by the council, reference 26/00690/LBCM

Timeline

Dates from the published record

  1. 31 Mar 2026

    Received by Doncaster

  2. 7 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Doncaster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/00685/4FULM Awaiting decision

    Melton Park Doncaster Road High Melton Doncaster DN5 7SZ

    Hybrid planning application comprising: Full planning permission for demolition works, remediation of the previously developed land; conversion and change of use of High Melton Hall to residential use to form 15 apartments; extension to day nursery (Use Class E) at 'Willow Cottage'; extension to 'The Lodge' (Use Class E); Use of the 'Former Forest School' as a training centre (Use Class F1), with flexibility for commercial use (Use Class E); use of 'The Stables' for commercial uses (Use Class E); refurbishment of 'The Pavilion' building to support continued education use (Use Class F1) and commercial uses (Use Class E); new buildings for commercial and community use (Use Classes E and F); conversion of the existing 'Workshop' building to new community hub and club house (Use Class F2); all weather community sports facilities (Use Class F2); use of former garages as storage; main access to the site and internal access arrangements; landscaping; associated infrastructure and associated works; and Outline planning permission with all matters (save for access) reserved for residential development of up to 200 dwellings; access; public open space; landscaping; demolition works; and associated infrastructure and works.

    31 Mar 2026 7m away Full applications
  • 21/02774/COND Granted

    Land North Of Hangman Stone Lane High Melton Doncaster DN5 7TB

    Consent, agreement or approval required by conditions 1 (Odour Management Plan) and 2 (Traffic Management Plan) of planning appeal 19/00003/ENFNOT (APP/F4410/C/19/3222400) decided on 17/08/21

    7 Sep 2021 349m away Conditions
  • 23/01802/COND Decided

    Hampshire Cottage 5 Hangman Stone Lane High Melton Doncaster DN5 7TB

    Consent, agreement or approval required by Condition(s) 5 (Limestone), 7 (Roof lantern), 8 (Windows and doors) and 9 (Boundary treatment and hard landscaping) of planning application 21/00118/FUL

    7 Sep 2023 349m away Conditions
  • 24/00689/COND Granted

    Hampshire Cottage 5 Hangman Stone Lane High Melton Doncaster DN5 7TB

    Consent, agreement or approval required by Condition 7 (roof lantern details) and 8 (windows and doors) of planning application 21/00118/FUL.

    17 Apr 2024 349m away Conditions
  • 26/01294/AGR Awaiting decision

    Red House Farm Doncaster Road High Melton Doncaster DN5 7SU

    Application to determine if prior approval is required for erection of lean-to tractor shed and implements store (432m2) to existing grain store as approved under 23/01315/FUL

    6 Jul 2026 366m away Other
  • 22/00807/COND Granted

    Red House Farm Doncaster Road High Melton Doncaster DN5 7SU

    Consent, agreement or approval required by conditions 3 (no demolition), 4 (Limestone wall sample panel) & 6 (windows doors) of planning application 20/01734/FUL

    29 Mar 2022 375m away Conditions

In Doncaster

  • 26/01182/LBC Granted

    Doncaster Railway Station Trafford Way Doncaster DN1 1PP

    Listed building consent for the removal of existing terrazzo flooring and replacement with natural stone and porcelain tile surfaces.

    19 Jun 2026 Heritage and listed buildings
  • 26/01002/LBC Granted

    South Farm House Old Skellow Skellow Doncaster DN6 8JR

    Listed building consent for the addition of 2 rooflights to rear roof slope

    22 May 2026 Heritage and listed buildings
  • 26/01276/LBC Awaiting decision

    Castle Folds Farmhouse 57 Castlegate Tickhill Doncaster DN11 9QP

    Listed building consent for the installation of photovoltaic solar panels on the roof (South East, North West, North East)

    6 Jul 2026 Heritage and listed buildings
  • 26/00900/LBC Granted

    Scawsby Hall Barnsley Road Scawsby Doncaster DN5 7UB

    Listed building consent for replacement rear attic window

    11 May 2026 Heritage and listed buildings
  • 26/01004/LBC Awaiting decision

    Doncaster Racecourse Clock Tower Stand Leger Way Intake Doncaster DN2 6BB

    Listed building consent for essential repairs and modifications to assist the lawful use, including the replacement of a broken stone entablature and repairs to stone plinths, columns and cracked capitals, with smaller miscellaneous repairs including to the water proofing within the stand; along with repairs and upgrading of existing safety barriers within the stand, and the provision of new barriers to meet the required standards.

    26 May 2026 Heritage and listed buildings