Proposed expansion and reconfiguration of an existing operational 500 kW. Anaerobic Digestion (AD) plant to include 2 No. additional digester tanks, pump building, re-orientated silage clamps, manure shed and underground effluent tank, 2 No. additional feeders, replacement of existing farm building to contain Bio-Ammonia Recovery System (BioARS), thermal digestate drying unit and pyrolysis system (digestate processing building), bio-methane gas upgrade plant, grid entry unit, propane tanks, relocated gas flare system, weighbridge, wheelwash, impermeable yard, parking, resurfaced access lane, landscaping, earth berm, lighting, fencing and security gates, access and ancillary site works
As published by the council, reference LA11/2026/0177/PAN
Application record
- Reference
- LA11/2026/0177/PAN
- Type
- Proposal of Application Notice
- Status
- Valid
- Received
- 2 Mar 2026
- Validated
- 16 Mar 2026
- Ward
- Enagh
- Postcode
- BT47 3JJ
Timeline
Dates from the published record
-
2 Mar 2026
Received by Derry City and Strabane
-
16 Mar 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Derry City and Strabane took a median of 97 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Derry City and Strabane for determination, against a statutory target of eight weeks. Over the last year Derry City and Strabane's median decision took 97 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Derry City and Strabane's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
33 CARMONEY ROAD CARMONEY BT47 3JJ
99% historically approved · decision due ~22 Oct
Proposed expansion and reconfiguration of an existing operational 500kW Anaerobic Digestion (AD) plant to include 2no. additional digester tanks, pump building, re-orientated silage clamps, manure shed and underground effluent tank, 2no. additional feeders, replacement of existing farm building to contain Bio-Ammonia Recovery System (BioARS), thermal digestate drying unit and pyrolysis system (digestate processing building), bio-methane gas upgrade plant, grid entry unit, propane tanks, relocated gas flare system, weighbridge, wheelwash, impermeable yard, parking, resurfaced access lane, landscaping, earth berm, lighting, fencing and security gates, access and ancillary site works - (Additional information and plans received)
Awaiting decision Full applications 102 docsSmall domestic