Planning application
Approx. 87 M. North East of 30 Kildoag Road, Ardmore, L'Derry
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed Dwelling and Garage
As published by the council, reference LA11/2026/0153/F
Application record
- Reference
- LA11/2026/0153/F
- Type
- Full
- Status
- Consultation Open
- Received
- 20 Feb 2026
- Validated
- 20 Feb 2026
- Ward
- Claudy
Timeline
Dates from the published record
-
20 Feb 2026
Received by Derry City and Strabane
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Derry City and Strabane took a median of 100 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Derry City and Strabane for determination, against a statutory target of eight weeks. Over the last year Derry City and Strabane decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Faughan Valley Woodland Lands 675m north-north-west of 90 Ardground Road Kilaloo Londonderry BT47 3TB
Discharge of Conditions: 2, 3 and 4 of LA11/2020/0296/F relating to a final Construction Method Statement/CEMP and SUDS.
Granted Conditions 13 docs -
Woodland Trust, Red Brae, Lands 675m NNW of 90 Ardground Road Kilalloo Londonderry BT47 3TB
Discharge of Condition: 2 of LA11/2021/0186/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil; e) Water Quality Monitoring Plan; f) Environmental Emergency Plan; g) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities. h) identify all potential risks to the adjacent watercourses and must incorporate all of the pollution prevention measures included in the Outline Construction Environmental Management Plan stamped 03/05/2022 and all details requested by NIEA NED in their consultation response dated 20/06/2022. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.
Granted Conditions Demolition 17 docs -
Faughan Valley Woodland, Lands 675 M. N.N.W. of 90 Ardground Road, Kilaloo, Londonderry
Discharge of condition Nos. 2 and 4 of planning permission LA11/2020/0296/F - Relating to Construction Environmental Management Plan
Granted Conditions 14 docs -
Brackfield Wood, Approx 150m south west of No. 250 Glenshane Road, BT47 3SN
Discharge of Condition: 6 of planning approval LA11/2019/0719/F relating to otters.
Granted Conditions 11 docs
Other full applications
In Derry City and Strabane
-
LA11/2026/0034/F Granted
16 Woodburn Park, Londonderry, BT47 5PS
proposed attic conversion, rear dormer, gable ground floor window and single storey rear extension to dwelling
-
LA11/2026/0269/F Granted
10 Hazelbank Drive, Londonderry, BT47 3NS
Proposed two storey rear extension to dwelling
-
LA11/2026/0731/F Awaiting decision
31 Larkhill, Londonderry, BT48 8AT
Rear ground floor extension
-
LA11/2026/0306/F Granted
98 Duncastle Park, New Buildings, Londonderry, BT47 2QL
Proposed first floor dormer extension to rear of dwelling
-
LA11/2026/0729/F Awaiting decision
101 Creggan Heights Londonderry BT48 9QU
Proposed rear extension to existing dwelling