Planning application
c. 250m east of 574 Glenshane Rd and 1.1km west of Feeny Village in the townland of Ballyhanedin, Co. Derry/Londonderry, BT47 4TG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed construction of additional and upgraded access tracks extending from an existing access off the B74 (Glenshane Road) to serve the associated Battery Energy Storage System (BESS), underground cabling, ducting and all ancillary works.
As published by the council, reference LA11/2025/0124/F
Application record
- Reference
- LA11/2025/0124/F
- Type
- Full
- Status
- Site Inspection Complete
- Decision
- Granted As published: Permitted
- Received
- 17 Feb 2025
- Validated
- 17 Feb 2025
- Ward
- Park (Derry and Strabane)
- Postcode
- BT47 4TG
Timeline
Dates from the published record
-
17 Feb 2025
Received by Derry City and Strabane
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Neo Environmental Ltd Agent, registered in Bellshill
Active · incorporated 2012 · Bellshill
17 applications on PlanIndex · across 13 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
83 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Derry City and Strabane granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands 550m SW of 38 Mullaghmeash Road and.800m NW of Feeny
Proposed installation of up to 100MW (200MWh) Battery Energy Storage System (BESS), which will consist of the construction of BESS enclosures, Twin MV Skids, substation, auxiliary transformer, storage containers, generator, monitoring house, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, and all ancillary grid infrastructure and associated works.
Granted Full applications 83 docs
Other full applications
In Derry City and Strabane
-
LA11/2026/0034/F Granted
16 Woodburn Park, Londonderry, BT47 5PS
proposed attic conversion, rear dormer, gable ground floor window and single storey rear extension to dwelling
-
LA11/2026/0269/F Granted
10 Hazelbank Drive, Londonderry, BT47 3NS
Proposed two storey rear extension to dwelling
-
LA11/2026/0731/F Awaiting decision
31 Larkhill, Londonderry, BT48 8AT
Rear ground floor extension
-
LA11/2026/0306/F Granted
98 Duncastle Park, New Buildings, Londonderry, BT47 2QL
Proposed first floor dormer extension to rear of dwelling
-
LA11/2026/0729/F Awaiting decision
101 Creggan Heights Londonderry BT48 9QU
Proposed rear extension to existing dwelling