Planning agent
Neo Environmental Ltd
Registered in Bellshill. 17 planning applications on PlanIndex across 13 councils . On the register from 2015 to 2026.
- 17 Applications on record
- 5 In the last 12 months
- 13 Councils
- Too few Decisions to give a rate
Where they work
And 1 other council.
What they file
-
Full applications50%
-
Outline43%
-
Conditions7%
Company record
From Companies House. Company information only; we never show personal contact details.
- Registered name
- NEO ENVIRONMENTAL LTD
- Company number
- SC421988
- Status
- Active
- Incorporated
- 16 April 2012
- Registered in
- Bellshill
Track record
The 10 most recent applications naming this firm
-
26/01217/EIASS Decided
Land Directly East Of Somerton Door Farm Somerton Door Drove Somerton Somerset TA11 6JN
Screening Opinion (Regulation 6) for the proposed construction, operation, maintenance and eventual decommissioning of up to a 20MW Solar Farm, comprising the construction of solar panels mounted on metal frames, inverters, auxiliary transformer, substation, storage container, DNO substation, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, landscaping, temporary construction compound and all ancillary grid infrastructure and associated site works
-
26/0857/SCR Decided
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2017 FOR ERECTION OF 1 NO. WIND TURBINE (76 METRES MAXIMUM HEIGHT TO BLADE TIP), HARDSTANDING, ASSOCIATED INFRASTRUCTURE AND ALTERATIONS TO EXISTING ACCESS
-
PL/26/01296/VRC Granted
Derehams Farm Derehams Lane Loudwater Buckinghamshire HP10 9RR
Variation of conditions 1 (temporary use), 2 (approved plans), 7 (landscape management plan), 8 (detailed planting plan) and 11 (surface water drainage of planning permission 24/06011/VCDN relating to variations of the original permission 22/08045/FUL (Construction and operation of a 40MW battery energy storage system and replacement agricultural barn, together with associated infrastructure, landscaping and access track (part retrospective) (alternative scheme to pp 18/07600/FUL))
-
DC/25/4143/SCO Granted
Land At Chediston Hall B1123 Chediston Halesworth Suffolk IP19 0AW
Scoping opinion following the screening direction associated with DC/25/2021/FUL for the construction of solar photovoltaic farm of up to 40MW and associated ancillary infrastructure including; underground cabling, new access tracks, substation buildings, storage container, perimeter fencing with CCTV cameras and access gates, landscaping, temporary construction compounds and all on-site ancillary grid infrastructure and associated site works.
-
25/1581/SCR Decided
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
SCREENING OPINION UNDER THE TOWN AND COUNTRY PLANNING ENVIRONMENTAL IMPACT ASSESSMENT (SCOTLAND) REGULATIONS 2017 FOR ERECTION OF 1 NO. WIND TURBINE (102 METRES MAXIMUM HEIGHT TO BLADE TIP), HARDSTANDING, ASSOCIATED INFRASTRUCTURE AND ALTERATIONS TO EXISTING ACCESS
-
25/0575/DNS Awaiting decision
Land At Glyn Taff Farm Bryn Tail Road Rhydyfelin Pontypridd CF37 5LT
Install, operate and subsequent decommissioning of a renewable energy scheme comprising ground mounted photovoltaic solar arrays together with substation compound, transformer stations, internal access track, landscaping, biodiversity measures, boundary fencing, security measures, CCTV posts, monitoring house, storage containers, access improvement and ancillary infrastructure, the solar arrays will have a combined capacity of up to 39.9MWp
-
25/1492/FUL Awaiting decision
Land At Meikle Float Farm Sandhead Stranraer (NGR 205586 548664)
ERECTION OF 1 NO. WIND TURBINE (76 METRES MAXIMUM HEIGHT TO BLADE TIP), HARDSTANDING, ASSOCIATED INFRASTRUCTURE AND ALTERATIONS TO EXISTING ACCESS (AMENDED PROPOSAL)
-
DC/25/2853/FUL Awaiting decision
Land At Ashby Dell Border Lane Somerleyton, Ashby And Herringfleet Suffolk NR32 5EE
Construction, operation, maintenance and eventual decommissioning of a circa 30MW Solar Farm comprising the construction of solar panels mounted on metal frames, inverters, auxiliary transformer, substation, storage container, DNO substation, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, landscaping, temporary construction compound, and all ancillary grid infrastructure and associated site works.
-
2025/1442 Awaiting decision
Land East Of Back Road Yelverton Norfolk
Construction and operation of a circa 15MW Solar Farm, comprising the erection of solar panels mounted on metal frames, centralised inverter housing, spares container, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, landscaping, and all ancillary grid infrastructure and associated site works
-
2025/1442 Awaiting decision
Land East Of Back Road Yelverton Norfolk
Construction and operation of a circa 15MW Solar Farm, comprising the erection of solar panels mounted on metal frames, centralised inverter housing, spares container, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, temporary construction compounds, landscaping, and all ancillary grid infrastructure and associated site works
7 more applications on record
Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.
See the full track recordFrom council registers and Companies House. Counts describe the records we hold, not a firm's complete history. Request a correction or removal.