Skip to content
PlanIndex Get alerts
Menu

Planning application

Coatham Hall Coatham Lane Coatham Mundeville Darlington DL3 0XL

Awaiting decision Darlington 26/01122/FUL Full Application

Works: Extension Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of the existing office accommodation within the Grade II listed Coatham Hall to residential use, reinstating the building as two self-contained residential dwellings known as Coatham Hall and East Wing, reflecting its historic arrangement. The proposed internal alterations comprise the sympathetic infilling of four existing connecting doorways between the two parts of the building: doorways A and B at ground-floor level and doorways C and D at first-floor level. The openings will be infilled using materials compatible with the existing historic masonry, including stone/rubble construction, lime mortar and lime plaster finishes, in accordance with the accompanying construction drawings. The existing independent entrances, staircases and services will be retained. The grounds are proposed to be divided between the two dwellings as shown on the proposed site plan. No extensions or external alterations to the listed building are proposed.

As published by the council, reference 26/01122/FUL

Application record

Reference
26/01122/FUL
Type
Full Application
Status
Registered
Received
17 Nov 2026
Ward
Heighington And Coniscliffe
Parish
Coatham Mundeville Parish Meeting
Postcode
DL3 0XL

Timeline

Dates from the published record

  1. 17 Nov 2026

    Received by Darlington

  2. 23 Nov 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Darlington took a median of 57 days over the applications it decided in the last year.

Documents

13 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What happens while it is decided

This application is with Darlington for determination, against a statutory target of eight weeks. Over the last year Darlington decided full applications in a median of 71 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Coatham Hall Farm Coatham Lane Coatham Mundeville Darlington DL3 0XL

    26/00755/FUL Submitted 4 Aug 2026 50 yards away

    95% historically approved · decision due ~29 Sep

    Internal and external renovations and refurbishment together with the partial demolition and rebuild of the existing attached store room

    Awaiting decision Full applications Demolition 29 docs
  • Coatham Hall Farm Coatham Lane Coatham Mundeville Darlington DL3 0XL

    26/00756/LBC Submitted 4 Aug 2026 50 yards away

    95% historically approved · decision due ~12 Oct

    Listed Building Consent for internal and external renovations and refurbishment together with the partial demolition and rebuild of the existing attached store room

    Awaiting decision Heritage and listed buildings Demolition 30 docs
  • Coatham Hall Farm Coatham Lane Coatham Mundeville Darlington DL3 0XL

    26/00876/TFC Submitted 4 Sep 2026 50 yards away

    Notification to carry out works to trees in a designated conservation area - crown reduction works to 4 no. Yew trees

    Granted Trees 15 docs
  • Foresters Arms Brafferton Lane Coatham Mundeville DL1 3LU

    26/00525/FUL Submitted 1 Jun 2026 250 yards away

    95% historically approved · decision due ~29 Sep

    Conversion and extension of existing outbuildings to provide 2 No. one bed holiday cottages, installation of 2 No. holiday pods, and erection of amenity block to car park/garden area

    Awaiting decision Full applications Extension 37 docs

In Darlington

  • 26/00721/FUL Granted

    Oxney Cottage Croft Road Darlington DL2 2SD

    Erection of an extension to the east elevation to provide workshop and garage to ground floor with annexe above, and incorporating new entrance feature linking to main dwelling with en-suite above, together with installation of solar panels, replace existing garage doors with bi-fold doors and associated works

    Received 24 Jul, published by the council 9 Sep 2026 Full applications
  • 26/01129/FUL Awaiting decision

    County Durham And Darlington NHS Foundation Trust Darlington Memorial Hospital Hollyhurst Road Darlington DL3 6HX

    Ground floor reconfiguration of existing brick building at Darlington Memorial Hospital to create a new discharge lounge with associated external works including: extension of ramp landing; new AHU unit; amendments to car parking layout, and replacement of curtain wall glazing.

    Received 18 Nov, published by the council 23 Nov 2026 Full applications
  • 26/01125/FUL Awaiting decision

    27 Skinnergate Darlington DL3 7NW

    Change of use from a public house to Class E use

    Received 18 Nov, published by the council 23 Nov 2026 Full applications
  • 26/01119/FUL Awaiting decision

    Barclays 27 High Row Darlington DL3 7QW

    The proposed works comprise of the installation of approximately 51.75m? of bird netting within the covered car park area at the rear of the branch to prevent bird roosting/nesting.

    Received 17 Nov, published by the council 23 Nov 2026 Full applications
  • 26/00856/FUL Granted

    Braemar Cottage 31 The Green High Coniscliffe Darlington DL2 2LJ

    Erection of a timber garage to the rear garden

    Received 31 Aug, published by the council 15 Nov 2026 Full applications