Planning application
47 Bondgate Darlington DL3 7JJ
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Approval of details reserved by condition 4 (method statement) attached to Listed Building Consent 25/01350/LBC dated 20 May 2026 (external repairs to windows, door and doorcase to front elevation, chimney stack and roof structure and internal repairs/reinstatement of ceilings, walls, floor and cast iron fireplace
As published by the council, reference 26/00873/CON
Application record
- Reference
- 26/00873/CON
- Type
- Discharge of Condition
- Status
- Awaiting decision
- Received
- 4 Sep 2026
- Validated
- 4 Sep 2026
- Ward
- Park East
- Parish
- Darlington Urban Area
- Postcode
- DL3 7JJ
Timeline
Dates from the published record
-
4 Sep 2026
Received by Darlington
-
15 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Darlington took a median of 53 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
CLB Heritage Ltd Agent, registered in Northallerton
Active · incorporated 2021 · Northallerton
147 applications on PlanIndex · across 7 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Darlington for determination, against a statutory target of eight weeks. Over the last year Darlington decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
BT Telephone Exchange Barnard Street Darlington DL3 7DT
Notification under Electronic Communications Code (Reg 5) of intention to upgrade the existing rooftop equipment, removal of 3 no. antennas and installation of 2 no. replacement antennas and 18 no. new RRUs on existing steelwork
Granted Telecoms 7 docs -
First Floor The Old Exchange Barnard Street DARLINGTON DL3 7DR
Change of Use from office (Use Class E) to education/training facility (Use Class F1)
Granted Full applications 8 docs -
Old Yard Tapas Bar 97 - 98 Bondgate DARLINGTON DL3 7JY
Conversion of second floor roof top into outdoor seating/dining area including new access door, glazed balustrade to front elevation and stepped access to lower level. Erection of first floor link extension to rear together and associated internal alterations
Granted Full applications Extension Windows or glazing 17 docs -
39 Woodland Road Darlington DL3 7BJ
Certificate of lawfulness for proposed development - replacement of roof coverings to front and rear pitched roof slopes and associated works
Granted Lawful development 5 docs -
1 Woodland Road Darlington DL3 7BJ
Siting of 1 No. InPost Parcel Locker to front of premises (Retrospective Application)
Granted Full applications 10 docs -
19 Woodland Road Darlington DL3 7BJ
Determination as to whether prior approval is required for the demolition of the single storey garage and the associated rear boundary wall
Granted Other Demolition 11 docsSmall domestic
Other condition discharge and variation applications
In Darlington
-
26/00726/CON Granted
Land To East Of Courtyard House Church Lane Darlington Sadberge DL2 1RP
Approval of details reserved by condition 4 (Post Investigation Report) attached to planning permission 25/00405/FUL dated 05 Sept 2025 (Erection of 1 no. self build three bed detached residential dwelling (Use Class C3) with parking provision and associated works)
-
26/00720/CON Granted
Former Cleveland Bridge Cleveland House Yarm Road Darlington DL1 4DE
Approval of details reserved by condition 4 (signed Toolbox Talk sheet) attached to planning permission 25/01400/FUL dated 07 July 2026 (Installation of external ancillary plant compound including tank farm and associated thermal equipment to facilitate the permitted use of the site for the chemical recycling of waste plastics for the production of pyrolysis oil (Class B2))
-
26/00903/CON Granted
4 Glanton Court Darlington DL3 0NY
Approval of details reserved by Condition 7 (path) attached to planning permission 26/00320/FUL dated 28 August 26 (Change of use of habitable room to aesthetics clinic (Use Class E))
-
26/00941/CON Awaiting decision
36 The Front Middleton One Row Darlington DL2 1AS
Approval of details reserved by Condition 3 (Materials) attached to planning permission 23/00820/FUL dated 21 Nov 23 (Refurbishment of property including alterations to ground floor windows and canopy on front elevation, replacement roof with increase in eaves and ridge height to provide increased first floor living accommodation with new windows to front and rear. Combining existing garage and storerooms below to form one habitable space by removing garage floor and formation of new roof with roof lights and flue, replacement roof with roof lights to existing linked flat roof extension, together with render to all external walls and associated internal and external works)
-
26/00906/CON Awaiting decision
Polam Hall School Grange Road Blackwell DARLINGTON DL1 5PA
Approval of details reserved by condition 11 (boundaries) attached to planning permission 25/00871/FUL dated 16 Jan 2026 (Partial demolition and partial retention and refurbishment of existing buildings, the erection of a single storey extension to Elm Grove and a two storey extension to the main building, the erection of temporary modular accommodation for the duration of the demolition and construction period, with associated permanent and temporary external works, including landscaping and construction of MUGA)