Planning application

Land Off Melland Street Darlington DL1 1SF

Awaiting decision Darlington 26/00577/FUL Full Application

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of former coal depot site to residential (Use Class C3) with the erection of apartment building comprising 34 No. flats, together with installation of solar array on roof of upper storey and roof amenity space at first floor level together with associated parking provision, cycle and bin stores, hard and soft landscaping and associated works

As published by the council, reference 26/00577/FUL

Application record

Reference
26/00577/FUL
Type
Full Application
Status
Awaiting decision
Received
12 Jun 2026
Validated
22 Sep 2026
Ward
Park East
Parish
Darlington Urban Area
Postcode
DL1 1SF

Timeline

Dates from the published record

  1. 12 Jun 2026

    Received by Darlington

  2. 22 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Darlington took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

41 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Darlington for determination, against a statutory target of eight weeks. Over the last year Darlington decided full applications in a median of 67 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 2 And 4 Melland Street DARLINGTON DL1 1SF

    21/00852/CU Submitted 16 Jul 2021 50 yards away

    Change of Use from 2 no. offices to 2 no. residential dwellings (Use Class C3) with new access door to rear, additional first floor window to rear elevation, sub division of yard and alterations to rear boundary

    Granted Full applications Windows or glazing 11 docs
  • 109 Parkgate Darlington DL1 1RZ

    26/00585/PA Submitted 15 Jun 2026 50 yards away

    Prior Approval application for the change of use of first floor from Commercial, Business and Service (Use Class E) to residential use (Use Class C3), comprising 1 No. one bedroom flat

    Withdrawn Prior approval 10 docs
  • Land At Parkgate Darlington Co Durham DL1 1RZ

    24/00963/PA Submitted 1 Oct 2024 50 yards away

    Installation of 15 m telegraph monopole supporting 3 No. antennas, 2 No. transmission dishes, 1 No. GPS module and installation of 3 No. equipment cabinets

    Granted Prior approval 21 docs
  • Darlington Hippodrome Parkgate Darlington DL1 1RR

    26/00387/DCLB Submitted 17 Apr 2026 100 yards away

    Listed Building Consent for the replacement of window vinyls to 6 no. ground floor windows and 2 no. sets of doors on the south elevation and 3 no. ground floor windows on the west elevation

    Granted Heritage and listed buildings Windows or glazing 11 docs
  • Former Coal Depot Site Melland Street DARLINGTON

    21/00721/CU Submitted 16 Jun 2021 100 yards away

    Change of use of land from former coal depot to storage of building materials (Use Class B8 Storage and Distribution)

    Refused Full applications 11 docs
  • 15 And 15A Borough Road DARLINGTON DL1 1SG

    23/00065/FUL Submitted 19 Jan 2023 100 yards away

    Conversion of loft into habitable space with box dormer to rear roof slope, replace blocked up door with window on rear elevation and associated internal alterations (as amended by plans received 21st and 22nd March 2023)

    Granted Full applications Loft or dormer Windows or glazing 15 docs

In Darlington

  • 26/00660/FUL Granted

    Redworth Hall Hotel And Country Club Main Road Redworth NEWTON AYCLIFFE DL5 6NL

    Installation of InPost parcel locker, including associated fencing, to the south elevation of Redworth Hall Hotel (Retrospective)

    Received 3 Jul, published by the council 28 Aug 2026 Full applications
  • 26/00775/FUL Granted

    Morrisons Supermarket Morton Park Way Darlington DL1 4PJ

    Siting of 1 No. InPost Parcel Locker to south east elevation (Retrospective Application)

    Received 7 Aug, published by the council 19 Aug 2026 Full applications
  • 26/00773/FUL Granted

    8 Thames Way Darlington DL1 5TS

    Erection of single storey rear extension

    Received 7 Aug, published by the council 19 Aug 2026 Full applications
  • 26/00759/FUL Granted

    6 Lych Gate Hurworth Darlington DL2 2AT

    Erection of single storey rear extension

    Received 5 Aug, published by the council 19 Aug 2026 Full applications
  • 26/00697/FUL Granted

    18 Wilton Drive Darlington DL3 9PS

    Erection of single storey rear extension and single storey side extension, together with removal of front veranda and associated alterations to doors and windows at first floor level and the installation of pitched roof over front porch/part garage

    Received 15 Jul, published by the council 29 Aug 2026 Full applications