Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00382/FUL

Petrol Station 66 - 76 Grange Road Blackwell Darlington DL1 5NP

Awaiting decision Darlington Full Application

Proposal

Application submitted under Section 73 of the Town & Country Planning Act 1990 for the variation of condition 8(viii) (operational hours) attached to planning permission 89/00554/DM dated 10 Jan 1990 (redevelopment of petrol filling station and car wash facility) to permit an extension of operation of the petrol filling station (including sales kiosk) on Sundays and Bank Holidays between 0700 and 2200

As published by the council, reference 26/00382/FUL

Timeline

Dates from the published record

  1. 15 Apr 2026

    Received by Darlington

  2. 24 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Darlington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21/00467/FUL Granted

    64 Grange Road Blackwell DARLINGTON DL1 5NP

    Demolition of rear off shoot kitchen/utility and erection of single storey rear extension. Alterations to existing garage including enlarged garage door, increase in height to flat roof and installation of window to east elevation

    27 Apr 2021 18m away Full applications
  • 26/00590/TF Awaiting decision

    Polam Hall Estate Marlborough Drive Darlington DL1 5YQ

    Works to various tree protected under Tree Preservation Order 1970 (No.2) - as per supporting report

    16 Jun 2026 130m away Trees
  • 26/00589/TFC Awaiting decision

    Polam Hall Estate Marlborough Drive Darlington DL1 5YQ

    Notification to carry out works to various trees in a designated conservation area - as per supporting report including felling of 1 no. Conifer

    16 Jun 2026 130m away Trees
  • 26/00684/NMA Awaiting decision

    Polam Hall School Grange Road Blackwell DARLINGTON DL1 5PA

    Non Material Amendment of Listed Building Consent 25/00872/LBC dated 16 Jan 2026 (demolition, partial demolition and partial retention and refurbishment of existing buildings, erection of a two storey extension to main building together with associated permanent and temporary external works) to permit amendments to the following conditions 2,4,11,12 including amendments to the wording of those conditions and other minor amendments as per the covering letter dated 14 July 2026

    10 Jul 2026 248m away Amendments
  • 26/00470/CON Granted

    Polam Hall School Grange Road Blackwell DARLINGTON DL1 5PA

    Approval of details reserved by condition 23 (temporary sports hall) attached to planning permission 25/00871/FUL dated 16 Jan 2026 (Partial demolition and partial retention and refurbishment of existing buildings, the erection of a single storey extension to Elm Grove and a two storey extension to the main building, the erection of temporary modular accommodation for the duration of the demolition and construction period, with associated permanent and temporary external works, including landscaping and construction of MUGA

    15 May 2026 248m away Conditions
  • 21/00601/FUL Granted

    22 Manor Road DARLINGTON DL3 8ET

    Erection of a single storey extension at the rear and a front extension to existing detached garage

    19 May 2021 307m away Full applications

In Darlington

  • 26/00300/FUL Granted

    3 Darlington Road Heighington NEWTON AYCLIFFE DL5 6RB

    Demolition of single storey garage to be replaced with a single storey extension with lantern x 2 - (revised scheme)

    24 Mar 2026 Full applications
  • 26/00210/FUL Withdrawn

    Land At Carmel Road South DARLINGTON DL3 8QN

    Modification of Section 106 Agreement (dated 21 May 2018) attached to planning permission reference number 17/00818/FUL dated 21 December 2017 to amend the Open Space Specification and Landscape Management Plan

    2 Mar 2026 Full applications
  • 26/00441/FUL Granted

    Morrisons 97 North Road Darlington DL1 2PY

    Creation of an EV charging zone within the existing car park including erection of canopy, locker hub, sub-station enclosure, LV panel, meter cabinet and associated works

    5 May 2026 Full applications
  • 26/00506/FUL Granted

    33 Woodcrest Road Darlington DL3 8EF

    Demolition of the existing rear extension and erection of a replacement single storey rear extension

    27 May 2026 Full applications
  • 26/00434/FUL Granted

    42 The Fairway Darlington DARLINGTON DL1 1ES

    Conversion of existing integral garage into habitable space

    1 May 2026 Full applications