Skip to content
PlanIndex Get alerts
Menu

Planning application

25/02916/MOA

Land East Of Hemel Hempstead South Of B487 Hemel Hempstead Road And North Of A4147 Hemel Hempstead Road Leverstock Green Hemel Hempstead Hertfordshire

Awaiting decision Dacorum Major Outline Application

Proposal

Outline application for: urban extension comprising two new neighbourhoods and a new employment zone. The development to include new dwellings (including affordable housing and specialist accommodation for older people); new employment and industrial floorspace and ancillary facilities, a sports hub and Sports Pitches; green infrastructure and landscaping works (to include a country park, formal and informal open space, amenity space, Suitable Alternative Natural Greenspace, managed woodland, ecological areas); early years, nursery, primary and secondary education facilities; local centre uses (to include retail, community and employment uses; health and fitness, gym and other cultural and recreational uses; medical centre; transport mobility hubs; drainage works (including foul and surface water drainage infrastructure); ancillary infrastructure works; vehicular and active travel infrastructure; improvements to the Nickey Line and delivery of a proportion of the Hemel Garden Communities Green Loop; land for Gypsy and Traveller pitches; provision of an active travel bridge over the A414; safeguarded land for M1 Junction 8 improvements; ground remodelling, acoustic bund, engineering and demolition works. All matters reserved save for access from the A414/Green Lane junction and access from the B487/Hemel Hempstead Road (Redbourn Road).

As published by the council, reference 25/02916/MOA

Timeline

Dates from the published record

  1. 27 Nov 2025

    Received by Dacorum

  2. 4 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Dacorum for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 25/02906/VAR Awaiting decision

    Prologis Park Hemel Hempstead Green Lane Hemel Hempstead Hertfordshire

    Deed of varitaion to S106 relating to 21/03793/MOA

    26 Nov 2025 347m away Amendments
  • 24/02560/NMA Granted

    Land At Green Lane Hemel Hempstead Hertfordshire

    Non-material amendment to planning permission 23/01817/RES (Reserved Matters Application pursuant to Condition 1 of planning permission 21/03793/MOA (matters relating to Access, Appearance, Landscaping, Layout and Scale) for the erection of industrial and logistics units (Use Classes E(g)(iii) and/or B2 and/or B8) with ancillary office accommodation, external yard areas, staff and operational vehicle parking, servicing and associated works).

    12 Nov 2024 353m away Amendments
  • 21/02805/SCE Decided

    Land At Green Lane R/o Woodwells Cemetary Buncefield Lane Hemel Hempstead Hertfordshire HP2 7HY

    REQUEST FOR A SCREENING OPINION IN ACCORDANCE WITH REGULATION 6 OF THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL ASSESSMENT) REGULATIONS 2017 (AS AMENDED) for the construction of a new employment development, to deliver approximately 30,000sqm of new floorspace (Class B2 / B8/ EG(i) / EG(iii)). A flexible use is sought to meet the needs of a range of occupiers.

    12 Jul 2021 353m away Outline

In Dacorum

  • 26/01636/PIP Awaiting decision

    Tuffs Farm Tower Hill Chipperfield Kings Langley Hertfordshire WD4 9LW

    Permission in principle for up to nine dwellings

    27 Jul 2026 Outline
  • 26/01102/SCE Decided

    Land South Of Homefield Bovingdon Hemel Hempstead Hertfordshire

    Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).

    14 May 2026 Outline
  • 26/01018/SCO Granted

    Land At Bulbourne Road Grove Road Tring Hertfordshire

    Outline planning application for up to 400 dwellings with access from Grove Road and Bulbourne Road, internal routes, public open space, SuDS, walking/cycling infrastructure, and associated landscaping/enabling works

    5 May 2026 Outline
  • 26/00958/PIP Refused

    Land Northeast Of Wayside Upper Bourne End Lane Hemel Hempstead Hertfordshire

    Permission in principle for the construction of a self-build dwellinghouse

    27 Apr 2026 Outline
  • 26/01165/OUT Awaiting decision

    British Waterways Board Apsley Yard Ebberns Road Hemel Hempstead Hertfordshire HP3 9RE

    Outline application for the demolition of the existing buildings and the redevelopment of the site for 2 dwellings (all matters reserved except for access)

    26 May 2026 Outline