Skip to content
PlanIndex Get alerts
Menu

Planning application

Rainhill Spring Stoney Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0DP

Awaiting decision Dacorum 24/02727/RET Retention of Development

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of a field shelter, pond and bund

As published by the council, reference 24/02727/RET

Application record

Reference
24/02727/RET
Type
Retention of Development
Status
With planning case officer
Received
2 Dec 2024
Validated
6 Dec 2024
Ward
Bovingdon / Flaunden / Chipperfield
Parish
Bovingdon Parish Council
Postcode
HP3 0DP

Timeline

Dates from the published record

  1. 2 Dec 2024

    Received by Dacorum

  2. 6 Dec 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 31 January 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Dacorum took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Bell Cornwell LLP Agent, registered in Hook

Active · incorporated 2008 · Hook

459 applications on PlanIndex · across 55 councils · 78% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Dacorum for determination, against a statutory target of eight weeks. Over the last year Dacorum's median decision took 52 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Dacorum's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Green Acre Stoney Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0DP

    24/01752/FHA Submitted 1 Aug 2024 249m away

    Demolition of existing single storey flank bay, rear extension, and utility area of dwelling. Part two storey rear, part single storey rear and side, extensions; new external cladding to first floor; new garage outbuilding with drive extended to serve.

    Granted Householder Extension Demolition 7 docs
    Small domestic
  • Norton Cottage Stoney Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0DP

    26/00856/FHA Submitted 13 Apr 2026 278m away

    Rear extension and refurbishment of the existing single family dwelling; additional accommodation within the roof space; one front dormer window and two rear dormer windows; rooflights, and; proposed PV panels.

    Granted Householder Extension Loft or dormer +1 12 docs
    Domestic
  • Norton Cottage Stoney Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0DP

    26/01590/LDP Submitted 21 Jul 2026 281m away

    Single-storey timber garden room for ancillary use to the main dwelling with associated WC and storage area, located a minimum of 2m from adjacent boundaries.

    Granted Lawful development 8 docs
    Small domestic
  • Cleveland Stoney Lane Bovingdon Hemel Hempstead Hertfordshire HP3 0DP

    23/00514/LDP Submitted 24 Feb 2023 405m away

    Rear dormer window to facilitate loft conversion to habitable accommodation.

    Granted Lawful development Loft or dormer Windows or glazing 14 docs
  • Shothanger House Box Lane Hemel Hempstead Hertfordshire HP3 0DJ

    24/02218/DRC Submitted 3 Oct 2024 450m away

    Details as required by condition 13 (Contamination - Parts A and B) attached to planning permission 22/00578/FUL (Construction of a new dwelling, including a new vehicle access, demolition of existing outbuildings and cessation of existing vehicle repair and sales business).

    Granted Conditions New dwelling Demolition 11 docs
    Domestic