Planning application
256-260 London Road Croydon CR0 2TH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a 3 storey building consisting of commercial space (Use Class E) at ground floor level and 4no. self-contained dwellings (Use Class C3) on upper floors at No. 256 London Road, with connection into existing buildings No. 258 and 260 London Road, with air-con units and associated cycle and bin stores to the rear.
As published by the council, reference 25/02134/FUL
Application record
- Reference
- 25/02134/FUL
- Type
- Full planning permission
- Status
- Awaiting decision
- Received
- 26 Jun 2025
- Validated
- 8 Jul 2025
- Ward
- Broad Green
- Postcode
- CR0 2TH
Timeline
Dates from the published record
-
26 Jun 2025
Received by Croydon
-
8 Jul 2025
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Croydon took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Bob Trimble - Architects Agent, an architecture practice
7 applications on PlanIndex · across 7 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- PROPOSED ELEVATIONS
- PROPOSED ELEVATIONS
- PROPOSED PLANS
- NOISE IMPACT ASSESSMENT
- PROPOSED ELEVATIONS
- PROPOSED PLANS
- UPDATED PLANT NOISE ASSESSMENT
- SITE NOTICE NEIGHBOUR NOTIFICATION
- APPLICATION FORM - WITHOUT PERSONAL DATA
- EXISTING PLANS
- BIODIVERSITY NET GAIN PLAN
- FIRE STATEMENT
- DESIGN AND ACCESS STATEMENT
- SITE PHOTOGRAPHS
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Croydon for determination, against a statutory target of eight weeks. Over the last year Croydon decided full applications in a median of 96 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Development Site 258 - 260 London Road Croydon CR0 2TH
Discharge of Condition 4 (External Materials) attached to permission 16/02296/P for Erection of four storey building comprising provision of flexible A1 (retail) /A2 (financial and professional services) on the ground floor with 6 one bedroom and 3 two bedroom flats on upper floors; provision of ancillary refuse and cycle storage facilities and provision of a temporary dropped kerb
Refused Conditions New dwelling 4 docs -
Land Development Site 258 - 260 London Road Croydon CR0 2TH
Details pursuant to the discharge of condition 3 (materials and details) from planning permission 16/02296/P for 'Erection of four storey building comprising provision of flexible A1 (retail)/A2 (financial and professional services) on the ground floor with 6 one bedroom and 3 two bedroom flats on upper floors; provision of ancillary refuse and cycle storage facilities and provision of a temporary dropped kerb.'
Refused Conditions New dwelling 4 docs -
254 London Road Croydon CR0 2TH
Discharge of Condition 3 (Construction Logistics) and 4 (Materials) attached to permission 23/00981/FUL for Alterations, erection of third floor roof extension with terrace to provide an additional 1x 1-bedroom flat
Refused Conditions Extension 8 docs -
238A London Road Croydon CR0 2TF
Discharge of Condition 6 (Construction Logistics) attached to permission 22/00550/FUL for Alterations, Erection of loft extension to facilitate a new flat and alterations to the rear outbuilding to create a Class E(c) and E(g) unit
Refused Conditions Extension Loft or dormer 4 docs -
238A London Road Croydon CR0 2TF
Discharge of Condition 10 (Refuse and Cycle Storage) attached to permission 22/00550/FUL for Alterations, Erection of loft extension to facilitate a new flat and alterations to the rear outbuilding to create a Class E(c) and E(g) unit
Refused Conditions Extension Loft or dormer 4 docs -
O/S 235 London Road At Junction With St James's Road Croydon CR0 2RL
Installation of 18m high telecommunications monopole with built-in cabinet at base and three ancillary cabinets
Refused Telecoms 10 docs
Other full applications
In Croydon
-
26/02306/FUL Decided
Foxgrove Apartments 9 Wicks Way Upper Norwood London SE19 3DY
The replacement of all combustible materials contained within existing external building walls with non combustible materials.
-
25/04044/FUL Decided
Land To Rear Of 12 And 12A Beulah Hill Upper Norwood London SE19 3LS
Erection of a terrace of 4 four bedroom 3 storey houses at rear. Associated landscaping, cycle paring, refuse storage, access, off street parking.
-
26/00481/FUL Decided
Sapphire Apartments 72 Lower Addiscombe Road Croydon CR0 6AB
Erection of roof extensions and mansard third floor to existing building and outbuilding, linked by a two-storey bridge, to provide 5 additional self-contained flats; reconfiguration of Flats 2, 10 and 11; provision of communal roof terrace, play area, cycle and refuse storage; associated landscaping and external alterations (car-free).
-
26/01601/FUL Decided
Ground Floor Unit 6 Whitestone Way Croydon CR0 4WF
Formation of a new EV pedestal platform comprising a 700 x 4880mm block paving and concrete kerb section projecting from the adjacent pedestrian walkway into 2 No. existing car parking spaces serving Unit 6. Existing parking bays and associated line markings to be extended by 700mm to maintain existing parking provision, with no encroachment into the adjoining public highway.
-
26/01964/FUL Decided
319A Brighton Road South Croydon CR2 6EQ
Erection of rear dormer and rooflights in front roofslope, and all associated works.