Planning application
Land To The South East Of Croydon College College Road Croydon CR9 1DX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Re-development of the site to provide three buildings between 16 and 42 storeys in height including ground and mezzanine level (plus lower ground) to include 673 residential units (Use Class C3), flexible Class E floorspace, associated hard and soft landscaping, cycle parking, servicing, refuse and plant areas, public realm works and highways works (amended drawings and description). (This application is accompanied by an Environmental Statement)
As published by the council, reference 25/02075/FUL
Application record
- Reference
- 25/02075/FUL
- Type
- Full planning permission
- Status
- Awaiting decision
- Received
- 23 Jun 2025
- Validated
- 23 Jun 2025
- Ward
- Fairfield
- Postcode
- CR9 1DX
Timeline
Dates from the published record
-
23 Jun 2025
Received by Croydon
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Croydon took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,618 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordCroydon Developments Limited Applicant, a developer
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
202 documents on file for this application
- BNG ASSESSMENT
- BNG ASSESSMENT - DEVELOPABLE AREA
- BNG ASSESSMENT - MAIN APPLICATION SITE
- ITEM 6.1 OFFICERS REPORT FINAL
- GA FLOOR PLAN - LOWER GROUND LEVEL
- LANDSCAPE PLAN - UPPER GROUND LEVEL
- LANDSCAPE PLAN - MEZZANINE LEVEL
- LANDSCAPE PLAN - ROOF PLAN
- DRAWING ISSUE SHEET
- DAS ADDENDUM P3
- COVER LETTER
- SUNLIGHT AMENITY TO PROPOSED COURTYARD
- ACOUSTIC DESIGN REPORT
- INTERNAL DLSL
- CIRCULAR ECONOMY STATEMENT
- COLLEGE ANNEX CBDM ASSESSMENT
- COLLEGE ANNEX CBDM COMPARISON
- DESIGN AND ACCESS STATEMENT ADDENDUM
- DRAWING REGISTER
- ES STATEMENT OF CONFORMITY
- ACCOMMODATION SCHEDULE
- BREEAM WORKPLACE TRAVEL PLAN
- DRAFT DELIVERY AND SERVICING PLAN
- FIRE STATEMENT
- OUTLINE CONSTRUCTION LOGISTICS PLAN
- PARKING MANAGEMENT PLAN
- RESIDENTIAL TRAVEL PLAN
- WASTE & RECYCLING STRATEGY
- TRANSPORT ASSESSMENT 1/5
- TRANSPORT ASSESSMENT 2/5
- TRANSPORT ASSESSMENT 3/5
- TRANSPORT ASSESSMENT 4/5
- TRANSPORT ASSESSMENT 5/5
- FVA ADDENDUM WITH APPENDICES
- GA FLOOR PLAN - UPPER GROUND LEVEL (00)
- GA FLOOR PLAN - MEZZANINE LEVEL
- GA FLOOR PLAN - LEVEL 01-13
- GA FLOOR PLAN - LEVEL 14
- GA FLOOR PLAN - LEVEL 15-40
- GA FLOOR PLAN - LEVEL 41-42 (ROOF LEVEL)
- GA SITE PLAN - EXISTING LOCATION PLAN
- GA SITE PLAN - EXISTING SITE PLAN
- SITE ELEVATIONS - EXISTING NORTH ELEVATIONS
- SITE ELEVATIONS - EXISTING SOUTH ELEVATIONS
- GA SITE PLAN - PROPOSED LOCATION PLAN
- GA SITE PLAN - PROPOSED SITE PLAN
- SECTION 1-1
- SECTION 2-2
- SECTION 3-3 & 4-4
- SECTION 5-5
- NORTH ELEVATION
- SOUTH ELEVATION
- WEST ELEVATION
- DRAINAGE STRATEGY ROOF LEVEL
- DRAINAGE STRATEGY GROUND FLOOR LEVEL
- DRAINAGE STRATEGY ADDENDUM
- SITE NOTICE NEIGHBOUR NOTIFICATION
- INTERNAL DAYLIGHT
- CIRCULAR ECONOMY STATEMENT
- SPECIAL SITE NOTICE - ENVIRONMENTAL STATEMENT
- PLANNING STATEMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- PHASE 1 GROUND CONDITIONS AND CONTAMINATION PRELIMINARY RISK ASSESSMENT
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 1: MAIN TEXT)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 2: FIGURES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 3: APPENDICES)
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT (VOLUME 4: TOWNSCAPE, VISUAL AND BUILT HERITAGE IMPACT A
- ENVIRONMENTAL STATEMENT ? NON TECHNICAL SUMMARY
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT
- ARBORICULTUAL IMPACT ASSESSMENT
- APPLICATION FORM - WITHOUT PERSONAL DATA
- AVIATION IMPACT ASSESSMENT
- INCLUSIVE DESIGN STATEMENT
- RETAIL IMPACT ASSESSMENT AND SEQUENTIAL TEST
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- SITE ELEVATION - EXISTING EAST FACING ELEVATION
- SITE ELEVATION - EXISTING WEST FACING ELEVATION
- GA ELEVATION - EAST ELEVATION
- ENERGY STATEMENT
- SUSTAINABILITY STATEMENT
- LIGHTING ASSESSMENT
- LIGHTING ASSESSMENT
- VENTILATION OR EXTRACTION STATEMENT
- UTILITIES INFRASTRUCTURE STATEMENT
- WHOLE LIFE CYCLE CARBON ASSESSMENT
- SAFETY, SECURITY AND RESILIENCE TO EMERGENCY STRATEGY
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- DRAINAGE STRATEGY REPORT
- DRAINAGE STRATEGY REPORT
- FLOOD RISK ASSESSMENT
- FLOOD RISK ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- STATEMENT OF COMMUNITY INVOLVEMENT
- AFFORDABLE HOUSING STATEMENT
- TREE SURVEY
- TV/RADIO RECEPTION IMPACT ASSESSMENT
- PLANNING GATEWAY ONE FIRE STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Croydon for determination, against a statutory target of eight weeks. Over the last year Croydon decided full applications in a median of 97 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Croydon College Annexe Barclay Road Croydon CR9 1DX
Variation to Conditions 2 & 44 of permission 20/00663/FUL for Demolition of existing building and redevelopment of the Croydon College Annex site to provide a new building with ground and first floor creative and cultural enterprise centre (previous Use Class D1/B1, new use Class E/F1) with ancillary exhibition space, and residential units (Class C3) above. Associated works include new landscaped public pedestrian route running through the site from north to south, private and communal amenity space for residents including play space, basement car parking and cycle parking, and temporary landscaping on southern part of the site (Amendments to provide a second core, changes to the affordable housing provision and associated minor alterations to parking and landscape layout)
Decided Demolition 33 docs -
Croydon College College Road Croydon CR9 1DX
Alterations to the West End entrance (on Park Lane); alterations to existing ramped access; provision of landscaped area; installation of lighting; and associated alterations.
Granted Full applications 16 docs -
Croydon College College Road Croydon CR9 1DX
1x projecting sign and 2x fascia signs on the western elevation
Granted Advertising 10 docs -
O/S 11 - 12 Suffolk House George Street Croydon CR0 1PE
Installation of a multifunction Hub unit featuring an integral advertisement display and defibrillator
Refused Full applications 20 docs -
O/S 11 - 12 Suffolk House George Street Croydon CR0 1PE
86-inch LCD screen on one side of the multifunction Hub unit to show illuminated static and animated displays
Refused Advertising 19 docs -
Former Essex House, 101 George Street, Croydon, CR0 1PJ
Erection of two buildings of 17 and 32 storeys comprising 305 residential units, 4 commercial units (use classes A1-A5), and a gym (use class D2); provision of new public piazza and associated landscaping, car parking, cycle and refuse storage
Granted Full applications 72 docs
Other full applications
In Croydon
-
26/00399/FUL Decided
128 - 130 Frant Road Thornton Heath CR7 7JU
Demolition of the existing warehouse and the erection of five dwellings (Class C3) with the associated amenity, cycle parking, refuse storage, landscaping and associated works.
-
26/02485/FUL Decided
3 Highdaun Drive Norbury London SW16 4LY
Demolition of existing dwelling and garage, erection of two-storey detached dwelling with accommodation in the roof space, excavation to provide basement accommodation and attached garage, erection of single storey outbuilding in rear garden and provision of associated landscaping and refuse storage.
-
26/01414/FUL Decided
14 Devonshire Way Croydon CR0 8BR
Demolition of existing dwelling and erection of a 3/4 -bedroom dwelling, with associated refuse store and cycle parking.
-
26/02387/FUL Decided
20 Sumner Road Croydon CR0 3LG
Retrospective application for the change of use from Class C3 (Dwellinghouse) to Class C4 (House in Multiple Occupation) 4 rooms
-
26/02630/FUL Decided
1041 London Road Thornton Heath CR7 6JF
Erection of a single-storey rear extension to accommodate a self-contained flat (Use Class C3); relocation of the existing rear entrance door serving the upper-floor flat; incorporation of refuse and cycle storage; and associated external works.