Planning application
Land West Of Unit 6 Dean And Chapter Industrial Estate Dean Bank DL17 8LH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of commercial unit to form MOT garage (Use Class B2/Class E/Sui Generis)
As published by the council, reference DM/26/02062/FPA
Application record
- Reference
- DM/26/02062/FPA
- Status
- Pending Consideration
- Received
- 6 Aug 2026
- Validated
- 1 Sep 2026
- Ward
- Ferryhill
- Parish
- Ferryhill
- Decision by
- Delegated
- Postcode
- DL17 8LH
Timeline
Dates from the published record
-
6 Aug 2026
Received by County Durham
-
1 Sep 2026
Validated
Checked as complete and ready for consideration.
-
10 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
County Durham took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
- PLANNING POLICY COMMENTS
- COAL AUTHORITY
- NEIGHBOUR NOTIFICATION LIST
- SITE NOTICE
- PHASE 1: DESKTOP STUDY AND COAL MINING RISK ASSESSMENT REPORT
- SITE LOCATION PLAN 1:1250
- SITE BLOCK PLAN AS EXISTING
- SITE BLOCK PLAN AS PROPOSED
- SITE BLOCK PLAN AS EXISTING
- PLANS AND ELEVATIONS AS PROPOSED
- SITE BLOCK PLAN AS PROPOSED
- APPLICATION FORM (NO PERSONAL DATA)
- VEHICULAR SWEPT PATH ANALYSIS (RIGID)
- PLANNING STATEMENT
- SITE LOCATION PLAN 1:1250
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with County Durham for determination, against a statutory target of eight weeks. Over the last year County Durham's median decision took 58 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on County Durham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Nedco Contracts Dean And Chapter Industrial Estate Dean Bank Ferryhill DL17 8LH
Change of use to facility for inert construction and mixed skip waste (incorporating revisions to existing site boundary and hours of operation)
Decided Other 24 docs -
Bishop Middleham Plant And Recycling Ltd Dean And Chapter Industrial Estate Dean Bank Ferryhill DL17 8LH
Variation of Condition 5 (operating hours) of Planning Permission DM/17/03617/WAS to permit a maximum of 1 lorry load of material to be transported into and off loaded within the site betwwen the hours of 1900 and 2300 for 1 day per calendar month per year
Decided Amendments 16 docs -
Dean & Chapter Allotments Dean And Chapter Industrial Estate Dean Bank
93% historically approved · decision due ~21 Apr
Outline consent for residential development of up to 18no. dwellings including access (all other matters reserved).
Awaiting decision Outline New dwelling 43 docsMajor scheme -
14 Main Street Ferryhill DL17 8LA
Display of replacement fascia sign with trough light mounted above
Granted Advertising 9 docs -
5 Market Street Ferryhill DL17 8JN
Installation of fascia sign onto roller shutter box
Granted Advertising 6 docs -
The Ivorson North Street Ferryhill DL17 8HX
First floor roof terrace
Granted Full applications 7 docs