Skip to content
PlanIndex Get alerts
Menu

Planning application

Binchester Roman Fort Binchester DL14 8DJ

Awaiting decision County Durham DM/26/00759/FPA Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Full planning permission comprising of: 1. Binchester Earth comprising a Welcome Centre, Discovery Centre and Play Area. 2. 11 Arches Park which comprises the expansion of the existing Kynren show area with the addition of three new show areas providing historic based stories of the northeast. 3. Bishop Gateway supporting infrastructure in the form of a visitor access road, car parks, a connecting footway and pedestrian footbridge.

As published by the council, reference DM/26/00759/FPA

Application record

Reference
DM/26/00759/FPA
Type
Full Planning Application
Status
Pending Consideration
Received
20 Mar 2026
Validated
10 Apr 2026
Ward
Spennymoor
Parish
No Parish
Decision by
Committee
Postcode
DL14 8DJ

Site history

Applications at this address on the County Durham register

This site has had 5 applications since 2025: 4 approved, 0 refused.

  • DM/26/01964/AD Granted

    Binchester Roman Fort Binchester DL14 8DJ

    Directional sign to east of front gates of Binchester Roman Fort

    Decided 24 Sep 2026
  • DM/26/01888/VOC Granted

    Binchester Roman Fort Binchester DL14 8DJ

    Variation of condition 2 (approved plans) of permission DM/25/02841/FPA for design changes and to adjust the ground level of each unit

    Decided 3 Sep 2026 Amendments
  • DM/26/01053/AD Granted

    Binchester Roman Fort Binchester DL14 8DJ

    Advertisement consent for replacement signage to front gates of Binchester Roman Fort

    Decided 11 Jun 2026 Advertising
  • DM/25/02841/FPA Granted

    Binchester Roman Fort Binchester DL14 8DJ

    Temporary Planning Permission (3 years) for a timber ramp, toilet block, education building, bin store / storage container (cycle storage fixed) and localised paving and associated works

    Decided 24 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 20 Mar 2026

    Received by County Durham

  2. 10 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    County Durham took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Pegasus Group Ltd Agent

1,239 applications on PlanIndex · across 172 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

422 documents on file for this application

  • NATIONAL HIGHWAYS EXTENDED HOLDING RECOMMENDATION Consultee Comment · 28 Jul 2026
  • 14 LADYSMITH CLOSE BISHOP AUCKLAND-OBJECTS-MR PETER DUNN(FULL) Public Comment · 15 Jul 2026
  • 14 LADYSMITH CLOSE BISHOP AUCKLAND-OBJECTS-MR PETER DUNN(FULL) Public Comment · 06 Jul 2026
  • 5 CHATSWORTH AVENUE BISHOP AUCKLAND DL14 6AX Public Comment · 03 Jul 2026
  • 1 CLEVELAND VIEW COUNDON BISHOP AUCKLAND DL14 8NE Public Comment · 29 Jun 2026
  • 11 THE GROVE CHILTON FERRYHILL DL17 0PL Public Comment · 15 Jun 2026
  • CLLR RAMAGE Public Comment · 12 Jun 2026
  • 14 LADYSMITH CLOSE BISHOP AUCKLAND-OBJECTS-MR PETER DUNN(FULL) Public Comment · 10 Jun 2026
  • 24 HIGH BONDGATE BISHOP AUCKLAND-OBJECTS-MR BRIAN LAMB (FULL) Public Comment · 08 Jun 2026
  • COMMENT 8 Public Comment · 08 Jun 2026
  • LELAND LODGE, 3 DIAL SOB HILL BISHOP AUCKLAND-OBJECTS-MR SEAN HOCKRAM(FULL) Public Comment · 05 Jun 2026
  • BISHOP AUCKLAND TOWN COUNCIL KINGSWAY COURT BISHOP AUCKLAND-NEUTRAL-MS SARAH HAR Consultee Comment · 04 Jun 2026
  • CLLR RAMAGE Public Comment · 01 Jun 2026
  • COMMENT 13 Public Comment · 27 May 2026
  • ETHERLEY PARISH COUNCIL Consultee Comment · 26 May 2026
  • SERENNA LODGE, 2 DIAL STOB HILL, BISHOP AUCKLAND DL14 7QF-OBJECTS-MR CHRISTOPHER Public Comment · 23 May 2026
  • COMMENT 6 Public Comment · 22 May 2026
  • COMMENT 6 - SUMMARY OBSERVATION ON NOISE IMPACT ASSESSMENT Public Comment · 22 May 2026
  • COMMENT 12 Public Comment · 21 May 2026
  • 2 QUARRY HEADS TOFT HILL BISHOP AUCKLAND DL14 0QH Public Comment · 21 May 2026
  • 1 AUCKLAND VIEW, HIGH ETHERLEY, BISHOP AUCKLAND DL14 0JQ-NEUTRAL-MRS PAULA COLLI Public Comment · 20 May 2026
  • COMMENT 10 Public Comment · 20 May 2026
  • COMMENT 11 Public Comment · 20 May 2026
  • THE GARDENS TRUST RESPONSE Consultee Comment · 19 May 2026
  • COMMENT 8 Public Comment · 19 May 2026
  • THE SYCAMORES, 246A TOFT HILL, BISHOP AUCKLAND DL14 0JF-OBJECTS-MR ROBERT DOUGLA Public Comment · 19 May 2026
  • 2 REDWORTH GROVE AUCKLAND PARK BISHOP AUCKLAND DL14 8QP Public Comment · 19 May 2026
  • 11 THE GROVE CHILTON FERRYHILL DL17 0PL Public Comment · 19 May 2026
  • COMMENT 9 Public Comment · 19 May 2026
  • NEIGHBOUR NOTIFICATION LIST Neighbour Notification List · 18 May 2026
  • COMMENT 6 Public Comment · 18 May 2026
  • HISTORIC ENGLAND RESPONSE Consultee Comment · 18 May 2026
  • COMMENT 2 Public Comment · 15 May 2026
  • COMMENT 4 Public Comment · 15 May 2026
  • COMMENT 6 Public Comment · 15 May 2026
  • COMMENT 7 Public Comment · 15 May 2026
  • COMMENT 1 Public Comment · 14 May 2026
  • COMMENT 3 Public Comment · 14 May 2026
  • COMMENT 5 Public Comment · 14 May 2026
  • HSE Consultee Comment · 11 May 2026
  • SITE NOTICE Site Notice · 11 May 2026
  • NORTHERN GAS NETWORKS RESPONSE Consultee Comment · 11 May 2026
  • NORTHERN GAS NETWORKS - STAY SAFE NEAR OUR PIPES Consultee Comment · 11 May 2026
  • NORTHERN GAS NETWORKS - IMPORTANT SAFETY GUIDANCE Consultee Comment · 11 May 2026
  • NORTHERN GAS NETWORKS - MAP Consultee Comment · 11 May 2026
  • NATURAL ENGLAND RESPONSE Consultee Comment · 06 May 2026
  • 14 LADYSMITH CLOSE, BISHOP AUCKLAND DL14 7RQ-OBJECTS-MR PETER DUNN(FULL) Public Comment · 03 May 2026
  • NATIONAL HIGHWAYS RESPONSE Consultee Comment · 01 May 2026
  • NATIONAL HIGHWAYS TECHNICAL NOTE Consultee Comment · 01 May 2026
  • THE COAL AUTHORITY Consultee Comment · 29 Apr 2026
  • PRESS NOTICE Press Notice · 23 Apr 2026
  • VISIT COUNTY DURHAM Consultee Comment · 21 Apr 2026
  • DESIGN REPORT Supporting Information · 20 Apr 2026
  • WELCOME CENTRE GENERAL ARRANGEMENT PLAN Drawing · 27 Mar 2026
  • APPENDIX C OF HYDRAULIC MODELLING REPORT- HYDRAULIC MODEL REVIEW Supporting Information · 27 Mar 2026
  • STATUTORY BIODIVERSITY METRIC TOOL Supporting Information · 27 Mar 2026
  • HABITAT CONDITION ASSESSMENTS Supporting Information · 27 Mar 2026
  • FIG. 9.8 ECOLOGICAL MITIGATION PLAN Supporting Information · 27 Mar 2026
  • FIG. 16.4 STUDY AREA LINK IDS Supporting Information · 27 Mar 2026
  • GROUND INVESTIGATION FACTUAL REPORT Supporting Information · 27 Mar 2026
  • WELCOME CENTRE SECTIONS & ELEVATIONS Drawing · 27 Mar 2026
  • FIG. 13.1 STUDY AREA Drawing · 20 Mar 2026
  • FIG. 13.2 POPULATION AND HUMAN HEALTH CONTEXT Drawing · 20 Mar 2026
  • FIG. 13.3 LOCAL ACCESS Drawing · 20 Mar 2026
  • FIG. 14.1 WATER FEATURES Drawing · 20 Mar 2026
  • FIG. 14.2 WATER FRAMEWORK DIRECTIVE WATERBODIES Drawing · 20 Mar 2026
  • FIG. 14.3 FLUVIAL FLOOD RISK Drawing · 20 Mar 2026
  • FIG. 14.4 SURFACE WATER FLOOD RISK Drawing · 20 Mar 2026
  • FIG. 14.5 RISK OF FLOODING FROM RESERVOIRS Drawing · 20 Mar 2026
  • FIG. 16.1 TRAFFIC AND MOVEMENT STUDY AREA Drawing · 20 Mar 2026
  • FIG. 16.2 PROPOSED HGV VEHICLE ROUTING Drawing · 20 Mar 2026
  • FIG. 16.3 PROPOSED WORKER VEHICLE ROUTING Drawing · 20 Mar 2026
  • FIG. 16.5 TRAFFIC COUNT SITE LOCATIONS Drawing · 20 Mar 2026
  • FIG. 16.6 NON-MOTORISED USERS Drawing · 20 Mar 2026
  • FIG. 16.7 ROAD TRAFFIC COLLISIONS Drawing · 20 Mar 2026
  • FIG. 17.1 LONG LIST OF CUMULATIVE DEVELOPMENTS Drawing · 20 Mar 2026
  • FIGURE 3.2A AND 3.2B 11ARCHES PARK LANDSCAPE STRATEGY Drawing · 20 Mar 2026
  • FIGURE 3.3 WELCOME CENTRE INTERNAL LIGHTING Drawing · 20 Mar 2026
  • FIGURE 3.4 WELCOME CENTRE EXTERNAL LIGHTING Drawing · 20 Mar 2026
  • FIGURE 3.6A-3.6D BINCHESTER EARTH LANDSCAPE STRATEGY AND ILLUSTRATIVE MASTERPLAN Drawing · 20 Mar 2026
  • FIGURE 3.7A AND FIGURE 3.7B BINCHESTER FORT PLATAEU LIGHTING Drawing · 20 Mar 2026
  • FIGURE 3.8A TO FIGURE 3.8C LINK ROAD NORTH CAR PARK AND RIVERSIDE CAR PARK PROPO Drawing · 20 Mar 2026
  • FIGURE 3.9A TO 3.9C PEDESTRIAN FOOTBRIDGE DESIGN Drawing · 20 Mar 2026
  • FIGURE 3.10A TO 3.10C BISHOP GATEWAY VEGETATION CLEARANCE Drawing · 20 Mar 2026
  • FIGURE 3.11A TO 3.11C BISHOP GATEWAY DRAINAGE DRAWINGS Drawing · 20 Mar 2026
  • FIGURE 3.13 BISHOP GATEWAY ENVIRONMENTAL MASTERPLAN Drawing · 20 Mar 2026
  • FIGURE A10.2-1 SITE LAYOUT FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-2 CURRENT AND HISTORICAL LAND USE FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-3 MADE GROUND AND SUPERFICIAL GEOLOGY FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-4 BEDROCK GEOLOGY FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-5 HYDROGEOLOGY FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-6 GROUNDWATER VULNERABILITY FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-7 REGULATORY DATA FINAL Drawing · 20 Mar 2026
  • FIGURE A10.2-8 RADON FINAL Drawing · 20 Mar 2026
  • FIGURE A10.3-1 SOIL HANDLING UNITS Drawing · 20 Mar 2026
  • FIGURE A14.1-3 UNMITIGATED DEPTH DIFFERENCE TO BASELINE FOR THE 1PER CENT Drawing · 20 Mar 2026
  • FIGURE A14.1-4 UNMITIGATED DEPTH DIFFERENCE TO BASELINE FOR THE 1PER CENT AND 25 Drawing · 20 Mar 2026
  • FIGURE A14.1-5 WITH-MITIGATION DEPTH DIFFERENCE TO BASELINE FOR THE 3.3PER CENT Drawing · 20 Mar 2026
  • FIGURE A14.1-6 WITH-MITIGATION DEPTH DIFFERENCE TO BASELINE FOR THE 1PER CENT Drawing · 20 Mar 2026
  • FIGURE A14.1-7 WITH-MITIGATION DEPTH DIFFERENCE TO BASELINE FOR THE 1PER CENT AN Drawing · 20 Mar 2026
  • FIGURE A14.3-1 HYDROMORPHOLOGY Drawing · 20 Mar 2026
  • FIGURE12.1 NOISEANDVIBRATIONASSESSMENTCONTEXTPLAN Drawing · 20 Mar 2026
  • FIGURE12.2 SHORT-TERMNOISECHANGECONTOURPLOTDOMINIMUM2028VSDOSOMETHING2028 Drawing · 20 Mar 2026
  • FIGURE12.3 INTERIMTERMNOISECHANGECONTOURPLOTDOMINIMUM2028VSDOSOMETHING2032 Drawing · 20 Mar 2026
  • FIGURE12.4 LONGTERMNOISECHANGECONTOURPLOTDOMINIMUM2028VSDOSOMETHING2042 Drawing · 20 Mar 2026
  • FIGURE12.5 INTERIMTERMNONPROJECTNOISECHANGECONTOURPLOTDOMINIMUM2028VSDOMINIMUM20 Drawing · 20 Mar 2026
  • FIGURE12.6 LONGTERMNONPROJECTNOISECHANGECONTOURPLOTDOMINIMUM2028VSDO MINIMUM2042 Drawing · 20 Mar 2026
  • FIGURE12.7 POTENTIALSIGNIFICANTEFFECTSFROMOPERATIONALNOISE Drawing · 20 Mar 2026
  • GEOTECHNICAL RISK AND DESIGN CONSIDERATIONS Supporting Information · 20 Mar 2026
  • GROUND INVESTIGATION SUMMARY Supporting Information · 20 Mar 2026
  • HYDRAULIC MODELLING REPORT Supporting Information · 20 Mar 2026
  • PROPOSED FOUL DRAINAGE ARRANGEMENT Drawing · 20 Mar 2026
  • DISCOVERY CENTRE FLOOD RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • WELCOME CENTRE FLOOD RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • PHASE 2: FACTUAL SITE INVESTIGATION Supporting Information · 20 Mar 2026
  • PHASE 2: INTERPRETATIVE SITE INVESTIGATION Supporting Information · 20 Mar 2026
  • PHASE 2: INTERPRETATIVE SITE INVESTIGATION Supporting Information · 20 Mar 2026
  • PHASE 1 - DESK TOP STUDY & COAL MINING RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • PHASE 1 - DESK TOP STUDY & COAL MINING RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • PHASE 1 - DESK TOP STUDY & COAL MINING RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • PHASE 2 - SITE INVESTIGATION Supporting Information · 20 Mar 2026
  • OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • OUTLINE HABITAT MONITORING AND MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • OUTLINE LANDSCAPE AND ECOLOGY MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • PEDESTRIAN FOOTBRIDGE BASIS OF DESIGN REPORT Supporting Information · 20 Mar 2026
  • PHOTOMONTAGE TECHNICAL METHODOLOGY AND FIGURES (PART 1 OF 4) Supporting Information · 20 Mar 2026
  • PHOTOMONTAGE TECHNICAL METHODOLOGY AND FIGURES (PART 2 OF 4) Supporting Information · 20 Mar 2026
  • PHOTOMONTAGE TECHNICAL METHODOLOGY AND FIGURES (PART 3 OF 4) Supporting Information · 20 Mar 2026
  • HOTOMONTAGE TECHNICAL METHODOLOGY AND FIGURES (PART 4 OF 4) Supporting Information · 20 Mar 2026
  • SOCIOECONOMIC REPORT - KYNREN Supporting Information · 20 Mar 2026
  • WOOD PASTURE AND PARKLAND PLAN Supporting Information · 20 Mar 2026
  • APPENDIX M - BARNES ASSOCIATED LTD - PRE DEVELOPMENT BS5837 TREE SURVEY REPORT Supporting Information · 20 Mar 2026
  • APPENDIX N - BARNES ASSOCIATES LTD TREE CONSTRAINTS PLAN Drawing · 20 Mar 2026
  • APPLICATIONFORMREDACTED Application Form · 20 Mar 2026
  • ENVIRONMENTAL MASTERPLAN PRELIMINARY DESIGN Drawing · 20 Mar 2026
  • TOPOGRAPHICAL SURVEY Drawing · 20 Mar 2026
  • METHODOLOGY Supporting Information · 20 Mar 2026
  • BISHOP GATEWAY, 11ARCHES PARK AND BINCHESTER EARTH PLANNING STATEMENT Supporting Information · 20 Mar 2026
  • BISHOP GATEWAY DESIGN RISK ASSESSMENT RECORD Supporting Information · 20 Mar 2026
  • BISHOP GATEWAY GEOTECHNICAL RISK REGISTER Supporting Information · 20 Mar 2026
  • BISHOPS GATEWAY AND 11ARCHES PARK DESIGN AND ACCESS STATEMENT Supporting Information · 20 Mar 2026
  • BS5837:2012 TREE SURVEY REPORT, ARBORICULTURAL IMPACT ASSESSMENT & ARBORICULTURA Supporting Information · 20 Mar 2026
  • CONSTRUCTION METHOD STATEMENT Supporting Information · 20 Mar 2026
  • ELEVATION 1 - NORTH Drawing · 20 Mar 2026
  • ELEVATION 2 - WEST Drawing · 20 Mar 2026
  • ELEVATION 3 - SOUTH Drawing · 20 Mar 2026
  • ELEVATION 4 - EAST Drawing · 20 Mar 2026
  • SITE PLAN - CONTEXT Drawing · 20 Mar 2026
  • SITE PLAN Drawing · 20 Mar 2026
  • SITE PLAN - THE CASTLE Drawing · 20 Mar 2026
  • SITE PLAN - THE DEER PARK Drawing · 20 Mar 2026
  • SITE PLAN - THE RUINS Drawing · 20 Mar 2026
  • SITE PLAN - THE FORT Drawing · 20 Mar 2026
  • SITE PLAN - THE VICUS Drawing · 20 Mar 2026
  • SITE PLAN - THE BOAR Drawing · 20 Mar 2026
  • SITE PLAN - TREE REMOVAL Drawing · 20 Mar 2026
  • SITE PLAN - SURFACING Drawing · 20 Mar 2026
  • SECTION 1 - THE CASTLE - FRONT Drawing · 20 Mar 2026
  • SECTION 2 - THE CASTLE - SIDE Drawing · 20 Mar 2026
  • SECTION 3 - THE RUINS MAZE - FRONT Drawing · 20 Mar 2026
  • SECTION 4 - THE ROMAN FORT - FRONT Drawing · 20 Mar 2026
  • SECTION 5 - THE ROMAN FORT - REAR Drawing · 20 Mar 2026
  • SECTION 6 - THE VICUS Drawing · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTERS 1 TO 5 Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 6 AIR QUALITY Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 7 CULTURAL HERITAGE Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 8 - LANDSCAPE AND VISUAL EFFECTS Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 9 BIODIVERSITY Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 10 GEOLOGY, SOILS AND LAND CONTAMINATION Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 11 MATERIAL ASSETS AND WASTE Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 12 NOISE AND VIBRATION Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 13 POPULATION AND HUMAN HEALTH Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 14 WATER ENVIRONMENT Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 15 CLIMATE Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 16 TRAFFIC AND MOVEMENT Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 17 CUMULATIVE EFFECTS Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT CHAPTER 18 SUMMARY Supporting Information · 20 Mar 2026
  • COAL MINING RISK ASSESSMENT FINAL (PART 1 OF 5) Supporting Information · 20 Mar 2026
  • COAL MINING RISK ASSESSMENT FINAL (PART 2 OF 5) Supporting Information · 20 Mar 2026
  • COAL MINING RISK ASSESSMENT FINAL (PART 3 OF 5) Supporting Information · 20 Mar 2026
  • COAL MINING RISK ASSESSMENT FINAL (PART 4 OF 5) Supporting Information · 20 Mar 2026
  • COAL MINING RISK ASSESSMENT FINAL (PART 5 OF 5) Supporting Information · 20 Mar 2026
  • DM/15/00110/FPA COAL MINING RISK ASSESSMENT Supporting Information · 20 Mar 2026
  • DM/15/00110/FPA GEO-ENVIRONMENTAL DESK STUDY Supporting Information · 20 Mar 2026
  • DRAFT DEER PARK MANAGEMENT PLAN APPENDICES Supporting Information · 20 Mar 2026
  • DRAFT DEER PARK MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT - ACRONYMS AND GLOSSARY Supporting Information · 20 Mar 2026
  • ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY Supporting Information · 20 Mar 2026
  • VEHICLE TRACKING SHEET 1 OF 2 Drawing · 20 Mar 2026
  • LONGITUDINAL PROFILE LINK ROAD - SHEET 01 OF 2 Drawing · 20 Mar 2026
  • LONGITUDINAL PROFILE FOOTWAY LINK Drawing · 20 Mar 2026
  • LONGITUDINAL PROFILE WELCOME CENTRE ACCESS ROAD Drawing · 20 Mar 2026
  • A688 JUNCTION LAYOUT Drawing · 20 Mar 2026
  • ISOPACHYTE CONTOURS PLAN Drawing · 20 Mar 2026
  • PROPOSED FINISHED LEVELS - SHEET 1 OF 3 Drawing · 20 Mar 2026
  • TYPICAL CROSS SECTIONS ZONE 2 - NORTH CAR PARK & FOOTWAY LINK Drawing · 20 Mar 2026
  • VEHICLE TRACKING SHEET 2 OF 2 Drawing · 20 Mar 2026
  • LONGITUDINAL PROFILE LINK ROAD - SHEET 2 OF 2 Drawing · 20 Mar 2026
  • PROPOSED FINISHED LEVELS - SHEET 2 OF 3 Drawing · 20 Mar 2026
  • TYPICAL CROSS SECTIONS ZONE 3 - RIVERSIDE CAR PARK Drawing · 20 Mar 2026
  • TYPICAL CROSS SECTIONS ZONE 1 - A688 & LINK ROAD Drawing · 20 Mar 2026
  • PROPOSED FINISHED LEVELS - SHEET 3 OF 3 Drawing · 20 Mar 2026
  • FIG 3.5 PLAY AREA ELEVATION (NORTH) Drawing · 20 Mar 2026
  • FIG 8.5 VIEWPOINTS Drawing · 20 Mar 2026
  • FIG A9.10-1 BNG BASELINE Drawing · 20 Mar 2026
  • FIG A9.10-2 BNG POST HABITAT ENHANCEMENT Drawing · 20 Mar 2026
  • FIG A9.11-1 WATERCOURSE BNG BASELINE REACHES Drawing · 20 Mar 2026
  • FIG A9.11-2 WATERCOURSE BNG POST-SCHEME REACHES Drawing · 20 Mar 2026
  • FIG A10.1-1 SITE LOCATION Drawing · 20 Mar 2026
  • FIG A10.1-2 SOIL SURVEY LOCATIONS Drawing · 20 Mar 2026
  • FIG A10.1-3 SOIL TYPES Drawing · 20 Mar 2026
  • FIG A10.1-4 AGRICULTURAL LAND CLASSIFICATION Drawing · 20 Mar 2026
  • FIG A14.1-1 BASELINE FLOOD EXTENTS FOR 3.3 PER CENT 1 0.1 AND 1 AND 25 CC EVENT Drawing · 20 Mar 2026
  • FIG A14.1-2 UNMITIGATED DEPTH DIFFERENCE TO BASELINE FOR THE 3.3 PER CENT Drawing · 20 Mar 2026
  • FIG A14.1-3 UNMITIGATED DEPTH DIFFERENCE TO BASELINE FOR THE 1 PER CENT Drawing · 20 Mar 2026
  • FIG. 1.1 PLANNING APPLICATION BOUNDARY Drawing · 20 Mar 2026
  • FIG. 2.1 ENVIRONMENTAL CONSTRAINTS PLAN Drawing · 20 Mar 2026
  • FIG. 3.1 PROPOSED DESIGN ALL ELEMENTS Drawing · 20 Mar 2026
  • FIG. 3.12 PROPOSED LOCATION OF CONSTRUCTION COMPOUNDS AND SOIL STORAGE SITES Drawing · 20 Mar 2026
  • FIG. 6.1 AIR QUALITY STUDY AREA AND RECEPTORS Drawing · 20 Mar 2026
  • FIG. 6.2 CONSTRUCTION DUST ASSESSMENT Drawing · 20 Mar 2026
  • FIG. 6.3 AIRQUALITYRESULTS HUMANHEALTH Drawing · 20 Mar 2026
  • FIG. 6.4 AIR QUALITY RESULTS ECOLOGICAL Drawing · 20 Mar 2026
  • FIG. 7.1 CULTURAL HERITAGE FEATURES Drawing · 20 Mar 2026
  • FIG. 7.2 ARCHAEOLOGICAL REMAINS ASSETS Drawing · 20 Mar 2026
  • FIG. 7.3 BUILT HERITAGE AND HISTORIC LANDSCAPE ASSETS Drawing · 20 Mar 2026
  • FIG. 8.1 ZTV AND VIEWPOINT LOCATIONS Drawing · 20 Mar 2026
  • FIG. 8.2 LANDSCAPE FEATURES AND DESIGNATIONS Drawing · 20 Mar 2026
  • FIG. 8.3 HISTORIC LANDSCAPE TOWNSCAPE DESIGNATIONS Drawing · 20 Mar 2026
  • FIG. 8.4 LANDSCAPE CHARACTER Drawing · 20 Mar 2026
  • FIG. 9.1 STATUTORY AND NONSTATUTORY DESIGNATED SITES Drawing · 20 Mar 2026
  • FIG. 9.2 ANCIENT WOODLAND PRIORITY HABITATS Drawing · 20 Mar 2026
  • FIG. 9.3 FIELD RESULTS - HABITATS OF PRINCIPAL IMPORTANCE REPORTED Drawing · 20 Mar 2026
  • FIG. 9.4 UK HABITAT CLASSIFICATION Drawing · 20 Mar 2026
  • FIG. 9.5 SURVEY RESULTS - BATS Drawing · 20 Mar 2026
  • FIG. 9.7 SURVEY RESULTS - BARN OWL KINGFISHER AND INNS Drawing · 20 Mar 2026
  • FIG. 10.1 MADE GROUND AND SUPERFICIAL GEOLOGY Drawing · 20 Mar 2026
  • FIG. 10.2 BEDROCK GEOLOGY Drawing · 20 Mar 2026
  • FIG. 10.3 POTENTIAL SOURCES OF CONTAMINATION Drawing · 20 Mar 2026
  • DISCOVERY CENTRE AND FORT PLATEAU, GENERAL ARRANGEMENT SITE PLAN Drawing · 20 Mar 2026
  • PROPOSED SITE PLAN BINCHESTER HALL FARM BLDGS Drawing · 20 Mar 2026
  • PROPOSED PLAN LEVEL 00 Drawing · 20 Mar 2026
  • PROPOSED PLAN LEVEL 00 Drawing · 20 Mar 2026
  • PROPOSED ELEVATIONS AND SECTIONS FINDS GALLERY & EXHIBITION Drawing · 20 Mar 2026
  • PROPOSED ELEVATIONS AND SECTIONS ENTRANCE NEW BUILD Drawing · 20 Mar 2026
  • PROPOSED ELEVATIONS AND SECTIONS Drawing · 20 Mar 2026
  • PROPOSED ELEVATIONS AND SECTIONS Drawing · 20 Mar 2026
  • FORT PLATEAU INDICATIVE LIGHTING STRATEGY Drawing · 20 Mar 2026
  • WELCOME CENTRE INDICATIVE LIGHTING STRATEGY Drawing · 20 Mar 2026
  • FORT PLATEAU DERE STREET INDICATIVE PACING SECTIONS Drawing · 20 Mar 2026
  • SHOW 2 Drawing · 20 Mar 2026
  • SHOW 3 Drawing · 20 Mar 2026
  • SITE OVERVIEW PLAN - SHOWS 1, 2 AND 3 Drawing · 20 Mar 2026
  • SITE OVERVIEW PLAN - SHOWS 1, 2 AND 3 Drawing · 20 Mar 2026
  • SHOW 1 - GROUND FLOOR PLAN Drawing · 20 Mar 2026
  • SHOW 1 - ROOF PLAN Drawing · 20 Mar 2026
  • SHOW 1 - ELEVATIONS Drawing · 20 Mar 2026
  • APPENDIX 1.1 SCOPING OPINION Supporting Information · 20 Mar 2026
  • APPENDIX 1.2 NATIONAL PLANNING POLICY AND LEGISLATION Supporting Information · 20 Mar 2026
  • APPENDIX 2.1 VISITOR ECONOMY IMPACT REPORT Supporting Information · 20 Mar 2026
  • APPENDIX 3.1 WELCOME CENTRE DESIGN AND ACCESS STATEMENT PART 1 Supporting Information · 20 Mar 2026
  • APPENDIX 3.1 WELCOME CENTRE DESIGN AND ACCESS STATEMENT PART 2 Supporting Information · 20 Mar 2026
  • APPENDIX 3.2 WELCOME CENTRE RIBA 3 REPORTS Supporting Information · 20 Mar 2026
  • APPENDIX 3.3 WELCOME CENTRE STAGE 3 VISUAL MATERIAL Supporting Information · 20 Mar 2026
  • APPENDIX 3.4 WELCOME CENTRE DRAINAGE STRATEGY Supporting Information · 20 Mar 2026
  • APPENDIX 3.5 BINCHESTER FORT PLATEAU DESIGN AND ACCESS STATEMENT AND HERITAGE ST Supporting Information · 20 Mar 2026
  • APPENDIX 3.5 BINCHESTER FORT PLATEAU DESIGN AND ACCESS STATEMENT AND HERITAGE ST Supporting Information · 20 Mar 2026
  • APPENDIX 3.6 BINCHESTER FORT PLATEAU RIBA 3 REPORTS Supporting Information · 20 Mar 2026
  • APPENDIX 3.7 DISCOVERY CENTRE STAGE 3 VISUAL MATERIAL Supporting Information · 20 Mar 2026
  • APPENDIX 3.8 DISCOVERY CENTRE DRAINAGE STRATEGY PART 1 Supporting Information · 20 Mar 2026
  • APPENDIX 3.8 DISCOVERY CENTRE DRAINAGE STRATEGY PART 2 Supporting Information · 20 Mar 2026
  • APPENDIX 3.9 11ARCHES PARK DESIGN AND ACCESS STATEMENT Supporting Information · 20 Mar 2026
  • APPENDIX 3.10 11ARCHES PARK SURFACE WATER DRAINAGE STATEMENT Supporting Information · 20 Mar 2026
  • APPENDIX 3.11 BISHOP GATEWAY BASIS OF DESIGN REPORT Supporting Information · 20 Mar 2026
  • APPENDIX 3.12 BISHOP GATEWAY SUSTAINABLE DRAINAGE REPORT PART 1 Supporting Information · 20 Mar 2026
  • APPENDIX 3.12 BISHOP GATEWAY SUSTAINABLE DRAINAGE REPORT PART 2 Supporting Information · 20 Mar 2026
  • APPENDIX 6.1 CONSTRUCTION DUST RISK ASSESSMENT P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 6.2 AIR QUALITY MONITORING RESULTS P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 6.3 DISPERSION MODELLING PROCESS P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 6.4 DISPERSION MODEL VERIFICATION AND ADJUSTMENT P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 6.5 AIR QUALITY RESULTS P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 7.1 CULTURAL HERITAGE GAZETTEER Supporting Information · 20 Mar 2026
  • APPENDIX 7.2 HERITAGE STATEMENT Supporting Information · 20 Mar 2026
  • APPENDIX 7.3 GEOPHYSICAL SURVEY REPORT (PART 1 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 7.3 GEOPHYSICAL SURVEY REPORT (PART 2 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 7.3 GEOPHYSICAL SURVEY REPORT (PART 3 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 7.5 CULTURAL HERITAGE IMPACT TABLES Supporting Information · 20 Mar 2026
  • APPENDIX 7.6 TAP HERITAGE REPORTS (PART 1 OF 4) Supporting Information · 20 Mar 2026
  • APPENDIX 7.6 TAP HERITAGE REPORTS (PART 2 OF 4) Supporting Information · 20 Mar 2026
  • APPENDIX 7.6 TAP HERITAGE REPORTS (PART 3 OF 4) Supporting Information · 20 Mar 2026
  • APPENDIX 7.6 TAP HERITAGE REPORTS (PART 4 OF 4) Supporting Information · 20 Mar 2026
  • APPENDIX 8.1 LVIA METHODOLOGY P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 8.2 - ZTV METHODOLOGY Supporting Information · 20 Mar 2026
  • APPENDIX 8.3 LANDSCAPE EFFECTS SCHEDULE FINAL P02 Supporting Information · 20 Mar 2026
  • APPENDIX 8.4 VISUAL EFFECTS SCHEDULE FINAL P02 Supporting Information · 20 Mar 2026
  • APPENDIX 9.2 BAT SURVEY REPORT (PART 1 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.2 BAT SURVEY REPORT (PART 2 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.2 BAT SURVEY REPORT (PART 3 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.3 BREEDING BIRDS SURVEY REPORT (PART 1 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.3 BREEDING BIRDS SURVEY REPORT (PART 2 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.4 UK HABITAT SURVEY REPORT (BINCHESTER EARTH) (PART 1 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.4 UK HABITAT SURVEY REPORT (BINCHESTER EARTH) (PART 2 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.4 UK HABITAT SURVEY REPORT (BINCHESTER EARTH) (PART 3 OF 3) Supporting Information · 20 Mar 2026
  • APPENDIX 9.5 WINTERING BIRDS REPORT (BINCHESTER EARTH) (PART 1 OF 2) Supporting Information · 20 Mar 2026
  • APPENDIX 9.5 WINTERING BIRDS REPORT (ESAC) (PART 2 OF 2) Supporting Information · 20 Mar 2026
  • APPENDIX 9.6 ECOLOGICAL SURVEYS REPORT (PART 1 OF 2) Supporting Information · 20 Mar 2026
  • APPENDIX 9.6 ECOLOGICAL SURVEYS REPORT (PART 2 OF 2) Supporting Information · 20 Mar 2026
  • APPENDIX 9.7 11ARCHES EXTENDED PEA REPORT Supporting Information · 20 Mar 2026
  • APPENDIX 9.8 BISHOP GATEWAY AND BINCHESTER EARTH ECOLOGICAL TECHNICAL NOTE P02 Supporting Information · 20 Mar 2026
  • APPENDIX 9.9 OTTER AND WATER VOLE SURVEY REPORT (BINCHESTER EARTH) Supporting Information · 20 Mar 2026
  • APPENDIX 9.10 BIODIVERSITY NET GAIN APPLICATION STAGE REPORT Supporting Information · 20 Mar 2026
  • APPENDIX 9.11 BISHOP GATEWAY 11ARCHES PARK AND BINCHESTER EARTH WATERCOURSE BNG Supporting Information · 20 Mar 2026
  • APPENDIX 10.1 AGRICULTURAL LAND CLASSIFICATION AND SOIL SURVEY REPORT FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 10.2 PHASE 1 LAND CONTAMINATION ASSESSMENT Supporting Information · 20 Mar 2026
  • APPENDIX 10.3 SOIL RESOURCE MANAGEMENT STRATEGY Supporting Information · 20 Mar 2026
  • APPENDIX 12.1 NOISE AND VIBRATION TERMINOLOGY Supporting Information · 20 Mar 2026
  • APPENDIX 12.2 BASELINE NOISE SURVEY DETAILS FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 12.3 NOISE MODEL INPUTS AND ASSUMPTIONS P02 FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 12.4 CONSTRUCTION NOISE AND VIBRATION ASSESSMENT INPUTS AND RESULTS FIN Supporting Information · 20 Mar 2026
  • APPENDIX 12.5 PREDICTED OPERATIONAL ROAD TRAFFIC NOISE LEVELS AT AL NOISE SENSIT Supporting Information · 20 Mar 2026
  • APPENDIX 13.1 SOCIOECONOMIC AND HEALTH BASELINE DATA TABLES Supporting Information · 20 Mar 2026
  • APPENDIX 14.1 BISHOP GATEWAY FLOOD RISK ASSESSMENT FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 14.2 WFD FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 14.3 BISHOP GATEWAY HYDROMORPHOLOGY ASSESSMENT FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 14.4 CHANNEL MIGRATION ASSESSMENT FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 15.1 ESTIMATION OF GREENHOUSE GAS EMISSIONS FINAL Supporting Information · 20 Mar 2026
  • APPENDIX 15.2 CLIMATE VULNERABILITY ASSESSMENT Supporting Information · 20 Mar 2026
  • APPENDIX 16.1 AADT LINK FLOWS Supporting Information · 20 Mar 2026
  • APPENDIX 16.2 IEMA CALCULATIONS Supporting Information · 20 Mar 2026
  • APPENDIX 16.3 BISHOP GATEWAY TRANSPORT ASSESSMENT Supporting Information · 20 Mar 2026
  • APPENDIX 16.4 OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • APPENDIX A OF HYDAULIC MODELLING REPORT - FLOOD ESTIMATION REPORT Supporting Information · 20 Mar 2026
  • APPENDIX E - TREE CONSTRAINTS PLAN Drawing · 20 Mar 2026
  • APPENDIX F - TREE REMOVAL AND RETENTION PLAN (PART 1 OF 2) Drawing · 20 Mar 2026
  • APPENDIX F - TREE REMOVAL AND RETENTION PLAN (PART 2 OF 2) Drawing · 20 Mar 2026
  • APPENDIX G ANCIENT WOODLAND AND TREE PRESERVATION ORDER Drawing · 20 Mar 2026
  • APPENDIX J - THE AUCKLAND PROJECT - HAZELBANK SURVEY OF INDIVIDUAL SPECIMEN TREE Drawing · 20 Mar 2026
  • APPENDIX K- THE AUCKLAND PROJECT - HAZELBANK PLANTATION SURVEY SCHEDULE Supporting Information · 20 Mar 2026
  • APPENDIX L - THE AUCKLAND PROJECT - HAZELBANK PLANTATION ROOT PROTECTION AREAS Drawing · 20 Mar 2026
  • GROUND FLOOR DOMESTIC WATER SERVICES LAYOUT Drawing · 20 Mar 2026
  • WATER SCHEMATIC Drawing · 20 Mar 2026
  • GROUND FLOOR HEATING LAYOUT Drawing · 20 Mar 2026
  • HEATING SCHEMATIC SHEET 01 Drawing · 20 Mar 2026
  • HEATING SCHEMATIC SHEET 02 Drawing · 20 Mar 2026
  • GROUND FLOOR VENTILATION LAYOUT Drawing · 20 Mar 2026
  • VENTILATION SCHEMATIC Drawing · 20 Mar 2026
  • GROUND FLOOR SMALL POWER & DATA LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR LIGHTING LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR SECURITY LAYOUT Drawing · 20 Mar 2026
  • CCTV SCHEMATIC Drawing · 20 Mar 2026
  • GROUND FLOOR FIRE ALARM LAYOUT Drawing · 20 Mar 2026
  • FIRE ALARM SCHEMATIC Drawing · 20 Mar 2026
  • LOCATION PLAN Drawing · 20 Mar 2026
  • LOCATION PLAN Drawing · 20 Mar 2026
  • WELCOME CENTRE GENERAL ARRANGEMENT EXISTING SITE PLAN Drawing · 20 Mar 2026
  • WELCOME CENTRE GENERAL ARRANGEMENT SITE PLAN Drawing · 20 Mar 2026
  • WELCOME CENTRE GENERAL ARRANGEMENT SITE PLAN Drawing · 20 Mar 2026
  • WELCOME CENTRE GENERAL ARRANGEMENT PLAN Drawing · 20 Mar 2026
  • WELCOME CENTRE SECTIONS & ELEVATIONS Drawing · 20 Mar 2026
  • WELCOME CENTRE SECTIONS & ELEVATIONS Drawing · 20 Mar 2026
  • WELCOME CENTRE SECTIONS & ELEVATIONS Drawing · 20 Mar 2026
  • WELCOME CENTRE SECTIONS Drawing · 20 Mar 2026
  • WELCOME CENTRE SITE SECTIONS AA & BB Drawing · 20 Mar 2026
  • WELCOME CENTRE SITE SECTIONS CC & DD Drawing · 20 Mar 2026
  • WELCOME CENTRE SITE SECTIONS EE & FF Drawing · 20 Mar 2026
  • EXISTING SITE PLAN WIDER FORT PLATEAU Drawing · 20 Mar 2026
  • EXISTING SITE PLAN BINCHESTER HALL FARM BUILDINGS Drawing · 20 Mar 2026
  • EXISTING PLAN BINCHESTER HALL FARM BLDGS LEVEL 00 - AREA A Drawing · 20 Mar 2026
  • EXISTING PLAN BINCHESTER HALL FARM BLDGS LEVEL 00 - AREA B Drawing · 20 Mar 2026
  • EXISTING PLAN BINCHESTER HALL FARM BLDGS LEVEL 01 Drawing · 20 Mar 2026
  • EXISTING ROOF PLAN AREA A (FARMHOUSE) Drawing · 20 Mar 2026
  • EXISTING ROOF PLAN AREA B Drawing · 20 Mar 2026
  • EXISTING ELEVATIONS AND SECTIONS BINCHESTER HALL FARM BLDGS Drawing · 20 Mar 2026
  • EXISTING ELEVATIONS AND SECTIONS BINCHESTER HALL FARM BLDGS Drawing · 20 Mar 2026
  • EXISTING ELEVATIONS AND SECTIONS BINCHESTER HALL FARM BLDGS Drawing · 20 Mar 2026
  • EXISTING FARM BUILDINGS ELEVATIONS AND SECTIONS FARMHOUSE Drawing · 20 Mar 2026
  • DEMOLITIONS & ALTERATIONS BINCHESTER HALL FARM BUILDINGS AND FORT PLATEAU Drawing · 20 Mar 2026
  • DEMOLITIONS & ALTERATIONS BINCHESTER FARM BUILDINGS LEVEL 00 - AREA A Drawing · 20 Mar 2026
  • DEMOLITIONS & ALTERATIONS LEVEL 00 - AREA B Drawing · 20 Mar 2026
  • ALTS & DEMS LEVEL 01 Drawing · 20 Mar 2026
  • ROOF PLAN AREA A DEMS AND ALTS Drawing · 20 Mar 2026
  • ROOF PLAN AREA B DEMS AND ALTS Drawing · 20 Mar 2026
  • ELEVATIONS AND SECTIONS BINCHESTER HALL FARM BLDGS DEMOLITIONS AND ALTERATIONS Drawing · 20 Mar 2026
  • ELEVATIONS AND SECTIONS DEMOLITIONS AND ALTERATIONS Drawing · 20 Mar 2026
  • ELEVATIONS AND SECTIONS DEMOLITIONS AND ALTERATIONS BINCHESTER HALL FARM BUILDIN Drawing · 20 Mar 2026
  • ELEVATIONS AND SECTIONS DEMOLITIONS AND ALTERATIONS FARMHOUSE Drawing · 20 Mar 2026
  • GROUND FLOOR COOLING LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR HEATING LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR HEATING LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR VENTILATION LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR VENTILATION LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR SMALL POWER & DATA LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR SMALL POWER & DATA LAYOUT Drawing · 20 Mar 2026
  • ROOF LEVEL PV PANEL LAYOUT Drawing · 20 Mar 2026
  • PROPOSED SITE PLAN ELECTRICAL SERVICES LAYOUT SHEET 1 Drawing · 20 Mar 2026
  • PROPOSED SITE PLAN ELECTRICAL SERVICES LAYOUT SHEET 2 Drawing · 20 Mar 2026
  • GROUND FLOOR LIGHTING LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR LIGHTING LAYOUT Drawing · 20 Mar 2026
  • PROPOSED SITE PLAN EXTERNAL LIGHTING LAYOUT SHEET 1 Drawing · 20 Mar 2026
  • PROPOSED SITE PLAN EXTERNAL LIGHTING LAYOUT SHEET 2 Drawing · 20 Mar 2026
  • GROUND FLOOR SECURITY LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR SECURITY LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR FIRE ALARM LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR FIRE ALARM LAYOUT Drawing · 20 Mar 2026
  • NOTES & LEGENDS Drawing · 20 Mar 2026
  • STANDARD DETAILS Drawing · 20 Mar 2026
  • GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT Drawing · 20 Mar 2026
  • DRAINAGE SCHEMATIC Drawing · 20 Mar 2026
  • CAR PARK MANAGEMENT PLAN Supporting Information · 20 Mar 2026
  • SUSTAINABILITY OF DEVELOPMENTS Supporting Information · 20 Mar 2026
  • NOTES & LEGEND Drawing · 20 Mar 2026
  • MEP SITE PLAN LAYOUT SHEET 1 Drawing · 20 Mar 2026
  • MEP SITE PLAN LAYOUT SHEET 2 Drawing · 20 Mar 2026
  • GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR ABOVE GROUND DRAINAGE LAYOUT Drawing · 20 Mar 2026
  • ROOF LEVEL DRAINAGE LAYOUT Drawing · 20 Mar 2026
  • GROUND FLOOR DOMESTIC WATER SERVICES LAYOUT Drawing · 20 Mar 2026
  • FIRST FLOOR DOMESTIC WATER SERVICES LAYOUT Drawing · 20 Mar 2026
  • BOUNDARY TREATMENT Drawing · 20 Mar 2026
  • SURFACE DETAIL Drawing · 20 Mar 2026
  • BOARDWALK DETAIL Drawing · 20 Mar 2026
  • 11ARCHES FLOOD EVACUATION PLAN Supporting Information · 20 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with County Durham for determination, against a statutory target of eight weeks. Over the last year County Durham decided full applications in a median of 79 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In County Durham

  • DM/26/02340/FPA Awaiting decision

    Unit 8 Esh Winning Industrial Estate Esh Winning Durham DH7 9PT

    Erection of a steel-framed B2/B8 storage building (Retrospective)

    Received 4 Sep, published by the council 8 Sep 2026 Full applications
  • DM/26/02306/FPA Awaiting decision

    6 Victoria Avenue Bishop Auckland DL14 7JH

    Change of use from Use Class E (Commercial, Business and Service) to Use Class C3 (Dwellinghouse). To include proposed residential accommodation comprising six bedrooms together with shared communal and ancillary spaces.

    Received 2 Sep, published by the council 7 Sep 2026 Full applications
  • DM/26/02287/FPA Awaiting decision

    Durham C I U Headquarters Ltd Club Union House Flass Street Durham DH1 4EF

    Change of use of ground floor to Class E (b) for use as restaurant

    Received 1 Sep, published by the council 29 Sep 2026 Full applications
  • DM/26/01157/FPA Granted

    24 Birkdale Gardens Belmont Durham DH1 2UJ

    First floor side extension

    Received 7 May, published by the council 20 Jul 2026 Full applications
  • DM/26/01154/FPA Granted

    2 Mill Court Bournmoor Houghton-le-spring DH4 6DJ

    Two-storey side and rear extensions with decking

    Received 7 May, published by the council 20 Jul 2026 Full applications