Planning application
9 Clarence Street Seaham SR7 7SQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use to a proposed Care Quality Commission (CQC) registered residential care provision house for young people aged 16-24 with varying levels of need - (Use Class C2 Residential Institution Use)
As published by the council, reference DM/25/03414/FPA
Application record
- Reference
- DM/25/03414/FPA
- Type
- Full Planning Application
- Status
- Pending Consideration
- Received
- 8 Dec 2025
- Validated
- 9 Dec 2025
- Ward
- Seaham
- Parish
- Seaham
- Decision by
- Delegated
- Postcode
- SR7 7SQ
Timeline
Dates from the published record
-
8 Dec 2025
Received by County Durham
-
9 Dec 2025
Validated
Checked as complete and ready for consideration.
-
20 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
County Durham took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Anton Lang Planning Services LTD Agent, a planning consultancy registered in Newcastle Upon Tyne
Active · incorporated 2008 · Newcastle Upon Tyne
44 applications on PlanIndex · across 10 councils · 64% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with County Durham for determination, against a statutory target of eight weeks. Over the last year County Durham decided full applications in a median of 66 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land East Of Colin Witton George Street Industrial Estate Seaham SR7 7SL
Creation of new vehicle access point from George Street / Herbert Terrace, Seaham to allow entry only.
Granted Full applications 9 docs -
Londonderry Works George Street Industrial Estate Seaham SR7 7SL
92% historically approved · decision due ~20 Oct
Prior Notification for demolition of existing industrial buildings and associated structures.
Awaiting decision Prior approval Demolition 5 docs -
Marlborough Surgery 10 - 11 Marlborough Seaham SR7 7SA
Canopy and ramped access to front, apply render to first floor elevations and two storey gable to rear and replacement windows
Granted Full applications Windows or glazing 20 docs -
Jobcentreplus Church View House St Johns Square Caroline Street Seaham SR7 7JE
Changing over air conditioning system to two floors, external condensers to be moved from roof to outside staff entrance at ground floor level
Granted Full applications 12 docs -
33 - 34 Church Street Seaham SR7 7HQ
Replacement shopfront and doors, replacement/reinstatement of windows, re-roofing, repair and redecoration of existing external render to walls and replacement of rainwater goods
Granted Full applications Windows or glazing 14 docs -
31 Church Street Seaham SR7 7HQ
Change of use from veterinary surgery to a Drop-in Centre to provide IT Chapel office, Art and Craft room and Mother Toddler training area and change 1no rear window to a door
Granted Full applications Windows or glazing 15 docs
Other full applications
In County Durham
-
DM/26/01157/FPA Granted
24 Birkdale Gardens Belmont Durham DH1 2UJ
First floor side extension
-
DM/26/01154/FPA Granted
2 Mill Court Bournmoor Houghton-le-spring DH4 6DJ
Two-storey side and rear extensions with decking
-
DM/26/01805/FPA Granted
Park Avenue Press Dundas Street Spennymoor DL16 6AR
Re-cladding and rendering of existing commercial frontage.
-
DM/26/01719/FPA Granted
78 Gilesgate Durham DH1 1HY
Replacement of defective timber windows and timber lintels repair of external stucco ashlar render to front elevation
-
DM/26/01650/FPA Granted
Vane Tempest Hall Maynards Row Gilesgate DH1 1QF
Proposed 2no. external condenser units to be mounted on rooftop on new unistrut frame on existing steel beams. Proposed 2no. internal 7kW air con evaporator units to be installed on equipment room wall.