Treago Mill Treago Road Crantock Newquay Cornwall TR8 5QS

Awaiting decision Cornwall PA26/06019 Overhead Electricity Lines

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

NGED have received a connection request and three phase. To enable this connection there is a requirement to add a third wire to the overhead high voltage network from pole number 43AAE7 to 43AAF6, over 6 spans and a total of 381M, highlighted in green on the plan CE6038598SECT37. The existing high voltage overhead network from pole 43AAF6 to 43AAF8, over 2 spans and a total of 171M will be dismantled, highlighted in blue on the plan and replaced by an underground high voltage cable shown as the brown line on the plan. There is also a requirement to erect a lazy leg pole alongside pole number 43AAF8 to support the larger three phase transformer, highlighted in pink on the plan

As published by the council, reference PA26/06019

Application record

Reference
PA26/06019
Type
Overhead Electricity Lines
Status
Awaiting decision
Received
28 Aug 2026
Validated
28 Aug 2026
Ward
St Newlyn East, Cubert And Goonhavern
Parish
Crantock
Postcode
TR8 5QS

Timeline

Dates from the published record

  1. 28 Aug 2026

    Received by Cornwall

  2. 12 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cornwall took a median of 50 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cornwall for determination, against a statutory target of eight weeks. Over the last year Cornwall decided less common application types in a median of 36 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Cornwall

  • PA26/06662 Awaiting decision

    Street Record St Ervan Wadebridge Cornwall

    Upgrade and relocate existing 100kVa Transformer with a 315kVa unit. Install new 11.5m and 10.5m Stout poles to replace existing 11.5m Medium pole to house new transformer and associated equipment. A new back stay will be installed to support the overhead lines. Replace and relocate an existing 10.5m Medium pole with a 10m Medium pole. Pole to be relocated to edge of land title boundary due to access restrictions. Upgrade 192m of existing 25 Hard Drawn Copper overhead high voltage line to 3 phase by installing a third conductor along highlighted route. This reinforcement work is being carried out to improve network carrying capacity and reliability for customers in the Penrose area

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06624 Awaiting decision

    Higher Beeny Beeny Boscastle Cornwall PL35 0HL

    Overhead Electricity Lines to install 3rd wire for approximately 130 metres from pole 43LWA4 to 43LWA4B. Replace poles 43LWA4A and 43LWA4B on a like for like basis. Upgrade pole mounted transformer to a new 100kVA unit and replace all associated secondary wiring at pole 43LWA4B.

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06625 Awaiting decision

    Gwendreath Ruan Minor Helston Cornwall TR12 7LZ

    Overhead Electricity Lines to upgrade an existing two wire 11kV line to a three wire 11kV overhead line along with additional support poles / equipment to facilitate an upgrade to three phase in the Gwendreath, Ruan Minor area. In addition to the overhead equipment we will also be installing a section of underground cable.

    Received 23 Sep, published by the council 30 Sep 2026 Other
  • PA26/06587 Awaiting decision

    Plusha Launceston Cornwall PL15 7QT

    National Grid proposed to install a 3rd wire on existing poles between 45LCHB1-5. The overall distance of the 3rd wire works is 340 metres. Pole 45LCHB3 is planned to be replaced on a like for like basis and a new pole mounted transformer will be added. No other poles are planned to be replaced, however, if nearer the time of the works the poles are found to require replacement the additional poles will be replaced as part of this scheme as well. All pole replacement work would be completed on a like for like basis

    Received 22 Sep, published by the council 30 Sep 2026 Other
  • PA26/05569 Granted

    Lower Tolcarne Farm St Allen Truro Cornwall TR4 9QX

    Overhead Electricity Lines to add a 3rd wire to an existing 11kv overhead line

    Received 10 Aug, published by the council 24 Aug 2026 Other