Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Retreat Court St Columb Cornwall TR9 6AD

Awaiting decision Cornwall PA26/05417 Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Listed Building consent replace defective painted timber sash windows with like for like replicas

As published by the council, reference PA26/05417

Application record

Reference
PA26/05417
Type
Listed Building Consent
Status
Awaiting decision
Received
3 Aug 2026
Validated
3 Aug 2026
Ward
St Columb Major, St Mawgan And St Wenn
Parish
St. Columb Major
Postcode
TR9 6AD

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by Cornwall

  2. 16 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cornwall took a median of 49 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Cubert

19 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cornwall for determination, against a statutory target of eight weeks. Over the last year Cornwall decided heritage and listed building applications in a median of 55 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 2 Parsons Garth Bridge St Columb Cornwall TR9 6BD

    PA26/05571 Submitted 14 Aug 2026 196m away

    92% historically approved · decision due ~9 Oct

    Works to trees subject to a Tree Preservation Order (TPO), works include Tree 1 Ash. Crown reduction by 2.5m and remove dead wood. The tree has some dieback and this will reduce the risk of falling dead wood into the property.

    Awaiting decision Trees 5 docs
  • Land North Of Gordon Place Union Hill St Columb Cornwall

    PA25/08867 Submitted 24 Nov 2025 198m away

    Non Material Amendment to Application No. PA21/06965 dated 3rd April 2023, namely, inclusion of CIL Phasing condition

    Granted Amendments 4 docs
  • Land North Of The Old Apple Store Lower East Street St Columb TR9 6AX

    PA26/04586 Submitted 2 Jul 2026 214m away

    94% historically approved · decision due ~27 Aug

    Submission of details to discharge Condition number 5 (Bat/Bird boxes and Bee bricks) in respect of Decision Notice PA24/08869 dated 17/04/25

    Awaiting decision Conditions 2 docs
  • Penmarric 3 Parsons Garth Bridge St Columb Cornwall TR9 6BD

    PA26/05568 Submitted 14 Aug 2026 220m away

    92% historically approved · decision due ~9 Oct

    Works to trees subject to a Tree Preservation Order (TPO), works include Tree 1 Sycamore. Remove dead stem back to the union as it has died, become unsightly and will eventually become unstable

    Awaiting decision Trees 3 docs
  • New Road St Columb Cornwall

    PA25/00939/PREAPP Submitted 10 Sep 2025 286m away

    Pruning of light growth to achieve a suitable safety clearance around ABC low voltage power lines

    Decided Trees 1 doc
  • 25 Bank Street St Columb Cornwall TR9 6AT

    PA25/05805 Submitted 14 Aug 2025 289m away

    Application for tree works within a TPO area: T1 Lime Tree with a TPO and T2 Copper Beech tree: an up to 2.5m reduction on the trees as shown by a red line in the images with a crown lift to 5.5m from ground level, not to include the removal of any major scaffold branches or branches originating from the main stem. A cut back from the dwelling of the Lime as indicated in the annotated image.

    Granted Trees 8 docs
    Domestic

In Cornwall

  • PA26/05207 Awaiting decision

    Trefula House Nursing Home Trefula St Day Redruth Cornwall TR16 5ET

    Listed Building Consent Replacement of windows to the north wing and coach house, together with the removal, replacement and installation of windows to the non-listed buildings. New single-storey extensions to provide a dedicated formal entrance, reception and kitchen, alongside a new first-floor extension to increase resident bedroom capacity and associated amendments to the existing roof form.

    27 Aug 2026 Heritage and listed buildings
  • PA26/05810 Awaiting decision

    5 Meneage Street Helston Cornwall TR13 8AA

    Listed Building Consent for the installation of an automated teller machine and associated signage.

    26 Aug 2026 Heritage and listed buildings
  • PA26/05473 Awaiting decision

    Heathfield Cottage St Ive Liskeard Cornwall PL14 3NG

    Listed building consent for replacement of fibre cement slate roof coverings with natural slate and associated works

    26 Aug 2026 Heritage and listed buildings
  • PA26/05667 Awaiting decision

    Lower Bowden St Neot Liskeard Cornwall PL14 6QN

    Listed Building Consent for:- Refurbishment and repair of the Grade II listed farmhouse and associated curtilage buildings, including structural repairs, internal alterations, thermal upgrading, roof and joinery repairs, and reinstatement for residential use

    25 Aug 2026 Heritage and listed buildings
  • PA26/05405 Withdrawn

    Trefula House Care Home St Day Road Redruth TR16 5ET

    Listed Building Consent for works to include replacement windows to the north wing and coach house. Removal of existing windows, new and replacement windows to the non-listed buildings. New single storey extensions to create a dedicated formal entrance, reception and kitchen.

    10 Aug 2026 Heritage and listed buildings