Skip to content
PlanIndex Get alerts
Menu

Planning application

PA26/04001

2 Dunheved Road Launceston Cornwall PL15 9JE

Awaiting decision Cornwall Full application

Proposal

Erection of a first floor balcony and detached garage

As published by the council, reference PA26/04001

Timeline

Dates from the published record

  1. 1 Jul 2026

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • PA26/00343 Granted

    The Orchid House Dunheved Road Launceston Cornwall PL15 9JE

    Works to Trees covered by a Tree Preservation Order (TPO) - T5 - Beech - Reduce crown spread on E quarter by 1.5m to leave 3.5m. T6 Beech - Crown lift to 3m from ground level reduce remaining radial crown spread by 2m to 3m. T7 Sycamore - Remove 3 smallest stems. Crown lift largest stem to 6m . Reduce height of 2 Beech stems under canopy to height of 3 smaller stems. T8 Beech - Crown lift around to crown break. Prune remaining upper crown by 2m to leave 3m radial crown spread.

    19 Jan 2026 47m away Trees
  • PA25/07385 Granted

    Manaton Court Dunheved Road Launceston Cornwall PL15 9JE

    Work to Trees subject to a Tree Preservation Order - T5 (Norway Maple) reduction of 1m with pruning cuts limited to 50mm and the shape retained and T7 (Silver Birch) crown lift both stems to 6m above ground level

    30 Sep 2025 96m away Trees
  • PA26/00588/PREAPP Withdrawn

    Mulberry House 3 Hendra Court Dunheved Road Launceston Cornwall PL15 9JG

    Exception notice for works to a Irish Yew

    8 May 2026 160m away
  • PA25/06255 Granted

    4 Chapel Close Launceston Cornwall PL15 7FL

    Works to Tree covered by a Tree Preservation Order (TPO) - T1 - Beech (multi-stemmed) - reduction not exceeding 1.5m with pruning cut diameter not exceeding 50mm remove lowest branches from southern side of tree over carport.

    15 Sep 2025 214m away Trees
  • PA21/05965 Granted

    11 Western Road Launceston PL15 7AS

    Listed Building consent for the removal of an existing rear chimney which is NOT part of the original building. Partial rebuilding of 2no. existing original chimney's as they are in poor condition.

    22 Jun 2021 216m away Heritage and listed buildings
  • PA25/06801 Decided

    Land Adj To Manaton Dunheved Road Launceston Cornwall PL15 9JE

    Submission of details to discharge conditions 4 and 5 in relation to Decision notice PA25/02219 dated 04.06.2025

    9 Sep 2025 221m away Conditions

In Cornwall

  • PA26/03823 Awaiting decision

    New County Hall Treyew Road Truro Cornwall TR1 3AY

    Relocation of Transformer to New County Hall from basement of existing building to new standalone unit within curtilage of NCH.

    29 Jun 2027 Full applications
  • PA26/05112 Awaiting decision

    29 United Road Carharrack Redruth Cornwall TR16 5QY

    Construction of a single storey front extension to the existing dwelling and associated works.

    30 Jul 2026 Full applications
  • PA26/05171 Awaiting decision

    1 Labernum Kilkhampton Bude Cornwall EX23 9QL

    Remove hip, add gable and dormer extension to form loft conversion

    29 Jul 2026 Full applications
  • PA26/05121 Awaiting decision

    Lower Trenowin Barn Ludgvan Penzance Cornwall TR20 8BL

    New extension and internal alterations to existing dwelling house

    29 Jul 2026 Full applications
  • PA26/03219 Granted

    Trefrida Farm Jacobstow Bude Cornwall EX23 0NZ

    Siting of slurry tank to support dairy enterprise

    1 Jun 2026 Full applications