Skip to content
PlanIndex Get alerts
Menu

Planning application

PA26/00735/PREAPP

The Breakwater Breakwater Road Bude Cornwall

Awaiting decision Cornwall Pre-Application HBA - Publicly Available

Proposal

Pre application advice in relation to an ongoing condition survey of the Bude Breakwater and a hydraulic modelling exercise currently being undertaken by the Environment Agency

As published by the council, reference PA26/00735/PREAPP

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by Cornwall

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cornwall for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • PA25/01170/PREAPP Awaiting decision

    Future Coast Bude Summerleaze To Crooklets Beaches Summerleaze Crescent Bude Cornwall

    Ultimate Planning Performance Agreement for several key assets around Bude which are vulnerable to coastal change and sea level rise. Improving the long-term adaption and resilience of this infrastructure can be achieved by constructing alternative facilities further from the risk zone, so that when existing facilities need to be decommissioned there is no gap in provision.

    2 Dec 2025 419m away Outline
  • PA25/01170 Awaiting decision

    Future Coast Bude Summerleaze To Crooklets Beaches Summerleaze Crescent Bude Cornwall

    Ultimate Planning Performance Agreement for several key assets around Bude which are vulnerable to coastal change and sea level rise. Improving the long-term adaption and resilience of this infrastructure can be achieved by constructing alternative facilities further from the risk zone, so that when existing facilities need to be decommissioned there is no gap in provision.

    2 Dec 2025 419m away Outline

In Cornwall

  • PA26/05331 Awaiting decision

    Land To The North Of Creaz-An Bre Foxhole St Austell Cornwall PL26 7SN

    Application for Permission in Principle for the construction of up to 8 dwellings (minimum of 4, maximum of 8).

    30 Jul 2026 Outline
  • PA26/05318 Awaiting decision

    Land North Of 13 Chapel Terrace St Blazey Cornwall PL24 2NL

    Application for Permission in Principle for the construction of up to 1 dwelling (minimum of 1, maximum of 1)

    30 Jul 2026 Outline
  • PA26/05284 Awaiting decision

    Land On The North Side Of Tros Mergh Penryn TR10 9LB

    Application for Permission in Principle for between 2 and 3 dwellings (minimum of 2, maximum of 3)

    29 Jul 2026 Outline
  • PA26/05239 Awaiting decision

    Three Meadows Church Coombe Redruth Cornwall TR16 6RT

    Application for Permission in Principle for the construction of up to 2 dwellings (minimum of 1, maximum of 2)

    28 Jul 2026 Outline
  • PA26/05259 Awaiting decision

    Land East Of Willow End Hobbacott Lane Marhamchurch Bude Cornwall

    Application for Permission in Principle for the construction of up to 9 dwellings (minimum of 5, maximum of 9)

    28 Jul 2026 Outline